NAVY MIL-S-19678 A-1988 SLIP RING ASSEMBLY MARK 7 MOD 0 (GUN FIRE CONTROL SYSTEM MARK 68)《 MARK 7 MOD 0 滑动环装配( MARK 68火力控制系统)》.pdf

上传人:priceawful190 文档编号:981536 上传时间:2019-03-12 格式:PDF 页数:9 大小:453.24KB
下载 相关 举报
NAVY MIL-S-19678 A-1988 SLIP RING ASSEMBLY MARK 7 MOD 0 (GUN FIRE CONTROL SYSTEM MARK 68)《 MARK 7 MOD 0 滑动环装配( MARK 68火力控制系统)》.pdf_第1页
第1页 / 共9页
NAVY MIL-S-19678 A-1988 SLIP RING ASSEMBLY MARK 7 MOD 0 (GUN FIRE CONTROL SYSTEM MARK 68)《 MARK 7 MOD 0 滑动环装配( MARK 68火力控制系统)》.pdf_第2页
第2页 / 共9页
NAVY MIL-S-19678 A-1988 SLIP RING ASSEMBLY MARK 7 MOD 0 (GUN FIRE CONTROL SYSTEM MARK 68)《 MARK 7 MOD 0 滑动环装配( MARK 68火力控制系统)》.pdf_第3页
第3页 / 共9页
NAVY MIL-S-19678 A-1988 SLIP RING ASSEMBLY MARK 7 MOD 0 (GUN FIRE CONTROL SYSTEM MARK 68)《 MARK 7 MOD 0 滑动环装配( MARK 68火力控制系统)》.pdf_第4页
第4页 / 共9页
NAVY MIL-S-19678 A-1988 SLIP RING ASSEMBLY MARK 7 MOD 0 (GUN FIRE CONTROL SYSTEM MARK 68)《 MARK 7 MOD 0 滑动环装配( MARK 68火力控制系统)》.pdf_第5页
第5页 / 共9页
点击查看更多>>
资源描述

1、J INCH-POUND:( MI L-S-I9678A(OS) 20 May 1988 SUPERSEDING MIL-S-l9678(NOrd) 6 December 1956 MILITARY SP ECI FICATION SLIP RING ASSEMBLY MARK 7 MOD O (GUN FIRE CONTROL SYSTEM MARK 68) This specification is approved for use within the Naval Sea Sptems Command, Department of the Navg and is available fo

2、r use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification establishes the requirements for a slip ring assembly des.ignated as Slip Ring Assembly Mark 7 Mod O. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards The fo

3、llowing specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of thes documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement thereto, cited

4、 in the solic-itation. SPECIFICATIONS FEDERAL QQ-S-571 Solder; Tin Alloy, Tin-Lead Alloy, and Lead Alloy TT-C-490 Cleaning Method and Pretreatment of Ferrous Surfaces for Organic Coatings MILITARY MIL-C-5541 M I L-1-6181 MI L-A-8625 Chemical Conversion Coatings on Aluminum and Aluminum Alloys interf

5、erence Control Requirements, Aircraft Equipment Anodic Coatings, For Aluminum and Aluminum Alloys M IL-E-16400 Electronic, Interior Communication, and Navigation Equipment Naval Ship and Wire, Electrical; Insulated, General Specification Shore, General Specification MIL-W-16878 Beneficial comments (

6、recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commanding Officer, Naval Ordnance Station (Code 330), Indian Head, MD 20640-5000 by using the self-addressed Standardization Document Improvement Proposal (DD Form 42

7、6) appearing at the end of this document or by letter. AMSC NIA. THIS DOCUMENT CONTAINS PAGES. FSC 1210 DISTRIBUTION release; distritp the subassembly chassis shall not be used for this purpose. The ground terminal on all subassemblie shall be routed to a single ground terminal within the outside en

8、closure; the enclosure itself shall not be used in lieu thereof. A suitable ground strap shall be provided to electrically ground the outside enclosure to ship structure. The corners and edges of the outside enclosure shall be rounded to prevent contact injury to personnel. 3.7. Lubrication. Lubrica

9、tion shall be in accordance with Publication OD 3000. 3.8 Maintenance parts. Maintenance parts for the slip ring assembly shall be furnished as specified in the 3.9 Drawings, publications, and specifications. Drawings, publications, and specifications shall be furnished contract or purchase order, i

10、n accordance with MIL-F-18870. 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-1767A LE! 7979906 0300422 = 3.10 Workmanship. All parts comprising the complete equipment shall be manufactured and finished in a thoroughly workmanlike manner. Pa

11、rticular attention shall be given to maintaining a high degree of reliability, safety, and appearance, Precautions shall be observed throughout manufacture and assembly to ensure a finished product free of burrs, chips, process residues, or other foreign material that would adversely affect appearan

12、ce or operation. 4. QUALITY ASSURANCE PROVISIONS. 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order (see 6.2.1), the contractor is responsible for the performance of ali inspection requirements as specified herein. Except as othetwise specified in the co

13、ntract or purchase order (see 6.2.1), the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specif

14、ication where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.1.1 Responsibility for compliance. All items must meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractors

15、 overall inspection system or quality program. The absence f any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Samp

16、ling in quality conformance does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. 4.2 Classification of inspections. The inspection requirements specified herein are classified as follows: a. Firs

17、t article inspection (see 4.4) b. Quality conformance inspection (see 4.5). 4.3 Inspection conditions. Unless otherwise specified (see 6.2.1), inspection conditions shall be as specified in the applicable test method (see 4.5.3). 4.4 First article inspection. First article inspection shall be perfor

18、med by the contractor, after award of contract and prior to production, at a location acceptable to the Government. First article inspection shall be performed on a sample assembly which has been produced with equipment and procedures normally used in production. 4.4.1 Sampling. The first article sa

19、mple shall be subjected to all the tests of 4.5.3. The sample shall be a first article assembly submitted by the contractor prior to the initiation of production. 4.4.2 Failure. Failure of a first article slip ring assembly to comply with any of these test requirements shall result in withholding of

20、 first article approval. 4.5 Quality conformance inspection. All quality conformance test samples shall be treated as first article samples (see. 6.3). Quality conformance inspection shall consist of the tests specified in 4.5.3. 4.5.1 Sample size. The tests specified in 4.5.3 shall be performed thr

21、oughout production on 1 unit randomly selected from each group of 10 assemblies submitted for Government acceptance. Reduced testing of 1 assembly randomly selected from each group of 50 or less assemblies submitted for Government inspection may be instituted following compliance with all quality co

22、nformance test requirements of 2 sample assemblies selected from 2 consecutively submitted groups of 10 assemblies. Normal testing of 1 in 10 ring assemblies shall be reinstated upon the failure of an assembly to comply with any of the quality conformance test requirements. 4.5.2 Failure. Upon failu

23、re of a quality conformance sample, Government inspection of other tests may continue; however, acceptance will be withheld pending correction of the defects responsible for the rejection. The procuring activity shall be notified of accepted lots possibly containing similar defects. When the cause o

24、f rejection has been determined and corrective action within the limitation of the design disclosure taken by the contractor to the satisfaction of the Government Inspector, then production may be continued and acceptance inspection resumed. In the event the cause of rejection cannot be determined,

25、the procuring activity shall be so advised, 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-L767A 12 447770b 0300q23 T M M lL-S-l9678A(OS) 4.5.3 Tests. 4.5.3.1 Dielecfric. All electrical circuits shall be capable of passing the dielectric str

26、ength test described below. All circuits in the slip ring assembly shall be subjected to high potential tests of 500 volts ac for less than 500 4.5.3.2 Insulation resistance. Insulation resistance tests shall be made to determine the insulation resistivity. 4.5.3.3 Radio interference. The assembly s

27、hall be tested for radio interference in accordance with MIL-1-6181. 4.5.3.4 Rotation test. The slip rings shall be rotated at rated speed (10 rpm) for 24 hours, during which time visual inspection will be made to determine the amount of sparking, brush dust, or other inherent defects in the operati

28、on of the slip ring assembly. 4.6 Inspection of packaging. The sampling and inspection of the packaging and marking shall be in accordance with the requirements of MIL-E-17555. 5. PACKAGING volts operating voltage; and twice operating plus 1000 volts for other circuits. The insulation resistance sha

29、ll be 100 megohms minimum at 60 percent relative humidity. 5.1 Packaging. The equipment shall be packaged and prepared for domestic shipment in accordance with 5.2 Marking. In addition to any special marking required by the contract or purchase order, all shipping containers MIL-E-17555. shall be ma

30、rked in accordance with MIL-STD-129 see (6.2.1). 6. NOTES e 6.1 Intended use. The slip rings are intended to provide electrical connection between circuits of the revolving element of the gun director and the fixed ships structure in order to obtain unlimited train rotation of the director. 6.2 Orde

31、ring data. 6.2.1 Acquisition requirements. Acquisition documents should specify the following: a. Title, number, revision, and date of this specification b. When reduced quality conformance testing is allowed (see 4.5.1) c. If the contractor is not responsible for inspection (see 4.1) d. If the cont

32、ractor should not use his own laboratory or other suitable facility for performance of inspection e. Inspection conditions, if other than as specified (see 4.3) f. Any special packaging and marking requirements (see 5.1 and 5.2). requirements (see 4.1) 6.3 First article. When a first article inspect

33、ion is required, the item should be a first article sample. The first article should consist of one unit. The contracting officer should include specific instructions in acquisition documents regarding arrangements for examinations, approval of first article test results and disposition of first art

34、icles. Invitations for bids should provide that the Government reserves the right to waive the requirement samples for first article inspection to those bidders offering a product which has been previously acquired or tested by the Government, and that bidders offering such products, who wish to rel

35、y on such production or test, must furnish evidence with the bid that prior Government approval is presently appropriate for the pending contract. 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MlL-C-l9678A(OS) 6.4 Patent notice. When Government s

36、pecifications, publications, drawings, or other data are used for any purpose other than in connection with a definitely related Government procurement operation, the United States Government thereby incurs no responsibility nor any obligation whatsoever: and the fact that the Government may have fo

37、rmulated, furnished, or in any way supplied the said specifications, publications, drawings, or other data, is not to be regarded by implication or otherwise as in any manner licensing the holder or any other person or corporation, or conveying any rights or permission to manufacture, use or sell an

38、y patented invention that may in any way be related thereto. 6.5 Changes from previous issue. Asterisks (or vertical lines) are not used in this revision to identify changes with respect to the previous issue due to the extensiveness of the changes. 6.6 Subject term (key word) listing. Brush block D

39、ielectric strength Fire control Gun director Junction box Resistance Slip ring Tube rotor Waveguide assembly Preparing Activity: (1 21 NO1 3) Navy OS *US. GOVERNMENT PRINNG OFFICE: 19W - 505(133/92125 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1