1、-. I - MIL-STD-1323 -306 81 m 7777711 00715b8 7 m c ?- u- 33- I5 MILITARY STANDARD MIL-STD-1323-306 UNIT LOAD (NAVY) FOR UNDERWAY REPLENISHMENT 30 NOMMER 1982 ROCKET MOTOR GBU-16/B (SKIPPER) IN CONTAINER CNU-248/E UNIT LOAD DATA NUMBER OF MOTORS PER CONTAINER NUMBER OF CONTAINERS PER UNIT LOAD DODIN
2、ALC TBD 1 4 4 NUMBER OF MOTORS PER UNIT LOAD GROSS WEIGHT OF ONE CONTAINER . , , . . , . , . 330 LBS. WEIGHT OF WOOD BATTENS 6 LES. WEIGHT OF STRAPPING . 6 LES. GROSS WEIGHT OF UNIT LOAD 1330 LBS. A CUBE. . 58 CU. FT. A DO NOT USE FOR SHIPPING WEIGHT DO NOT STACK MORE THAN 4 UNIT LOADS HIGH IN STORA
3、GE HAZARD CLASSIFICATION DOT CLASS 8 LENGTH M) C.G. . CLASS Ii 8 CONTAINER, SHIPPING AND STORAGE MOTOR SECTION CNU-248/E UWG. NO. 18894-744072 CONTAINER DIMENSIONS WIDTH . 18 1/2 HEIGHT (OVERALL) 23 1/8 (STACKINGI . 22 1/8 UNIT LOAD DIMENSIONS LENGTH. . Ml WIDTH. 37 HEIGHT. . 45 1/4 NOTES: 1. 2. UNL
4、ESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES. FOR CROSS REFRENCE TO ASSOCIATED TRUCKLOADING, CONTAINERLOADING AND CARLOADING MILITARY STANDARDS, REFER TO INDEX TO STANDARDS, MIL-HDBK-236 (NAVY). 1- THIS UNIT LOAD IS AUTHORIZED AND RELEASED FOR SHIPPING, HANDLING, STORAGE AND TRANSFER-AT-SEA. IT
5、MAY ALSO BE USED FOR DOMESTIC SHIPMENT IN COMPLIANCE WITH DOT REGULATIONS. / n/7 /!dL$ NWHC /zy(gL ION AGENT (TDA) ATE DATE . ,LA- SIHTURE s1GM7FN1Pz AIR SMCW &Y DIRECTION REQUIREMENTS FOR CONSTRUCTION OF THIS UNIT LOAD SHALL CONSIST OF THIS DOCUMENT AND THE LATEST ISSUE OF MIL-STD-1323 (NAVY) nr !x
6、i47AA &y& /Ay/$ DATE O R IG I NAT OR NAVAL WEAPONS HANDLING CENTER WPNSTA EARLE, NEW JERSEY i- s Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-7 MIL-STD-3323 -306 81 77777LL 0073569 7 2 2 MIL-STD-132 3-306 (NAVY) STRAPPING (BAUEN RETAINING) SEE NOT
7、ES 1 8 2 3/4 X .O35 X IO Fl 2 STRAPPING (UNIT LOAD) SEE NOTES 1 & 2 3/4 X .O35 X 13 FT UNITIZING PROCEDURE 4 REQD 1. LOOP STRAP, ITEM 4, THROUGH LIFTING EYES OF EACH CONTAINER, ITEM 1, SO THAT EYES ARE IN DOWN POSITION. TENSION AND DOUBLE NOTCH SEAL, ITEM 5. STACK TWO CONTAINEPS, THEN PLACE WO STACK
8、S SIDE BY SIDE, SO THAT MOISTURE INDICATORS P.RE ON SAME ENDS. THREAD STRAP, ITEM 3, THROUGH FORK POCKETS. PLACE 2 X 8 X 31 BATTEN, ITEM 6, ON TOP OF STRAPPING, ITEM 3, TENSION AND DOUBLE NOTCH SEAL. PUT STRAP, ITEM 3, AROUND TOP LAYER OF CONTAINERS, TENSION AND DOUBLE NOTCH SEAL, PUT UNIT LOAD STRA
9、P, ITEM 2, AROUND UNIT LOAD, TENSION AND DOUBLE NOTCH SEAL. 2. 3. 4. 5. 6. MARKING: THE UNIT LOAD SHALL BE MARKED IN ACCORDANCE WITH MIL-STD-1323 (NAW) 1 CONTAINER 18894-744072 M) X 18 1/2 X 23 I/ ITEM DESCRIPTION MATL/DWG DIMENSION! EYES LOAD, U U DETAIL 0 (ROTATED 90“ FOR CLARITY) DE-UNITIZING PRO
10、CEDURE 1. CUT AND REMOVE STRAPPING. 2. REMOVE BATTENS. 3. REMOVE CONTAINERS. DETAIL NOTE: 1. ALL MATERIALS SHALL BE AS SPECIFIED IN MIL-STD-1323. 2. COLD ROLLED, HEAT TREATED, .O31 STRAPPING MAY BE SUBSTITUTED. 6 BATTEN SEE NOTE 1 2 X 8 X 31 2 I 12 I 5 I SEAL I SEE NOTE 1 I 3/4 REVIEW ACTIVITY: NAW-OS, AS PREPARING ACTIVITY: NAW- OS (PROJECT NO, 8140-N582) PAGE 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-