ImageVerifierCode 换一换
格式:PDF , 页数:2 ,大小:12.96KB ,
资源ID:1017847      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
注意:如需开发票,请勿充值!
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1017847.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-0196-1992 Lessons Learned - Launch Processing Workload.pdf)为本站会员(figureissue185)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-0196-1992 Lessons Learned - Launch Processing Workload.pdf

1、Lessons Learned Entry: 0196Lesson Info:a71 Lesson Number: 0196a71 Lesson Date: 1992-11-04a71 Submitting Organization: KSCa71 Submitted by: Lisa L. MusgraveSubject: Launch Processing Workload Description of Driving Event: An unusually high workload at the time of the STS 51-L ground processing caused

2、 manpower limitations, and some areas where particular skills were required, were in short supply. The major cause was the necessity of processing four orbiters, while also completing the launch complex 39B activation. Original planning called for OV-103 to be shipped to Vandenberg AFB in September

3、1985. The shipment was delayed in order to fly OV-103 on an additional flight from KSC. The need to delay the movement of OV-103, in turn, was caused by major work on OV-102 that had traveled to KSC. This resulted in a long processing flow prior to the STS 61-C launch. Problems in processing both or

4、biters were further increased by a substantial reliance on part cannibalization to support the operations. This was compounded by the STS 61-C activity, which was moved from a planned December 1985 launch to January 12, 1986. This unplanned delay, along with several intermediate launch attempts, cre

5、ated a higher than anticipated demand upon manpower, resulting in schedule limitations. In some skills, such as test conductors and senior engineers, the higher than normal test activities created abnormal demands upon their availability.Lesson(s) Learned: Manpower limitations due to a high workload

6、 created scheduling difficulties and contributed to operational problems.Recommendation(s): Implement a more effective manpower/skill mix for prelaunch operations to minimize effects of repeated launch attempts on processing operations.Evidence of Recurrence Control Effectiveness: Provided by IHSNot

7、 for ResaleNo reproduction or networking permitted without license from IHS-,-,-N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Administration/Organizationa71 Ground Operationsa71 Human Resources & EducationAdditional Info: Approval Info: a71 Approval Date: 1994-06-06a71 Approval Name: James G. Klinea71 Approval Organization: KSC/HEIa71 Approval Phone Number: 407-867-7614Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-