1、Lessons Learned Entry: 0196Lesson Info:a71 Lesson Number: 0196a71 Lesson Date: 1992-11-04a71 Submitting Organization: KSCa71 Submitted by: Lisa L. MusgraveSubject: Launch Processing Workload Description of Driving Event: An unusually high workload at the time of the STS 51-L ground processing caused

2、 manpower limitations, and some areas where particular skills were required, were in short supply. The major cause was the necessity of processing four orbiters, while also completing the launch complex 39B activation. Original planning called for OV-103 to be shipped to Vandenberg AFB in September

3、1985. The shipment was delayed in order to fly OV-103 on an additional flight from KSC. The need to delay the movement of OV-103, in turn, was caused by major work on OV-102 that had traveled to KSC. This resulted in a long processing flow prior to the STS 61-C launch. Problems in processing both or

4、biters were further increased by a substantial reliance on part cannibalization to support the operations. This was compounded by the STS 61-C activity, which was moved from a planned December 1985 launch to January 12, 1986. This unplanned delay, along with several intermediate launch attempts, cre

5、ated a higher than anticipated demand upon manpower, resulting in schedule limitations. In some skills, such as test conductors and senior engineers, the higher than normal test activities created abnormal demands upon their availability.Lesson(s) Learned: Manpower limitations due to a high workload

6、 created scheduling difficulties and contributed to operational problems.Recommendation(s): Implement a more effective manpower/skill mix for prelaunch operations to minimize effects of repeated launch attempts on processing operations.Evidence of Recurrence Control Effectiveness: Provided by IHSNot

7、 for ResaleNo reproduction or networking permitted without license from IHS-,-,-N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Administration/Organizationa71 Ground Operationsa71 Human Resources & EducationAdditional Info: Approval Info: a71 Approval Date: 1994-06-06a71 Approval Name: James G. Klinea71 Approval Organization: KSC/HEIa71 Approval Phone Number: 407-867-7614Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-