ImageVerifierCode 换一换
格式:PDF , 页数:2 ,大小:61.64KB ,
资源ID:1019447      下载积分:10000 积分
快捷下载
登录下载
邮箱/手机:
温馨提示:
如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
特别说明:
请自助下载,系统不会自动发送文件的哦; 如果您已付费,想二次下载,请登录后访问:我的下载记录
支付方式: 支付宝扫码支付 微信扫码支付   
注意:如需开发票,请勿充值!
验证码:   换一换

加入VIP,免费下载
 

温馨提示:由于个人手机设置不同,如果发现不能下载,请复制以下地址【http://www.mydoc123.com/d-1019447.html】到电脑端继续下载(重复下载不扣费)。

已注册用户请登录:
账号:
密码:
验证码:   换一换
  忘记密码?
三方登录: 微信登录  

下载须知

1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。
2: 试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
3: 文件的所有权益归上传用户所有。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 本站仅提供交流平台,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

版权提示 | 免责声明

本文(REG NASA-LLIS-4256-2011 Lessons Learned - Development of the Current Mass Spectrometer Requirements and Techniques.pdf)为本站会员(testyield361)主动上传,麦多课文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文库(发送邮件至master@mydoc123.com或直接QQ联系客服),我们立即给予删除!

REG NASA-LLIS-4256-2011 Lessons Learned - Development of the Current Mass Spectrometer Requirements and Techniques.pdf

1、Public Lessons Learned Entry: 4256 Lesson Info: Lesson Number: 4256 Lesson Date: 2010-09-23 Submitting Organization: KSC Submitted by: Annette Pitt Subject: Development of the Current Mass Spectrometer Requirements and Techniques Abstract: Leak checks utilizing a mass spectrometer have been an effec

2、tive method of validating the integrity of fluid systems within the aerospace industry for decades. Mass spectrometers provide a high fidelity leak check, however, unlike soap solution or flow meter leak checks, there isnt a sensory method to validate correct performance of a mass spectrometer leak

3、check. Where a soap solution leak check can be validated visually by looking for the presence of bubbles or a flow meter leak check can be validated with a pinch test of the leak check tubing, proper performance of a mass spectrometer leak check relies on maintaining equipment in current calibration

4、, correctly performing pretest and post test checks when putting the equipment in use, and most importantly, ensuring personnel using the equipment are properly trained. Description of Driving Event: Mass spectrometer leak checks performed at Palmdale during Orbiter Maintenance Down Period for OV104

5、 exhibited several inconsistencies, leading to an investigation of the leak check processes used. The investigation found that permeability ratios and response times for equipment used did not conform to the MF0001-003 specification requirements. Equipment flow rates were also out of limits. An insp

6、ection of the equipment and procedures found that filters were not being used in the test probes, leading to contamination and blockage in the units. Leak checks performed on components with known leakages did not give correct readings with the suspect units. As a result, mass spectrometer leak chec

7、ks performed at Palmdale with the suspect units were re-performed at KSC. Lesson(s) Learned: Proper maintenance of equipment and training of personnel are of vital importance in ensuring the integrity of leak checks performed with mass spectrometer units. Detailed processes and procedures for using

8、the equipment must be developed and carefully followed. Recommendation(s): Utilize mass spectrometer leak checks for critical systems where even small external leakages can have serious consequences. Ensure procedures are correct, detailed and followed. Maintain equipment in calibration. Perform pre

9、test and post-test checks of the equipment when performing leak checks. Ensure operations are properly trained and that they have a good working knowledge of the equipment and how to use it. Evidence of Recurrence Control Effectiveness: N/A Documents Related to Lesson: Rockwell International specifi

10、cation MF0001-003 Proof Pressure And Leak Detection-Aerospace Plumbing Systems And Assemblies Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Mass Spec Machine Permeability Ratio Document Click here to download communication document. Mission Directo

11、rate(s): Space Operations Additional Key Phrase(s): 1.Maintenance 1.Test & Verification 1.Configuration Management 1.Long term sustainability and maintenance planning 1.Ground Operations Additional Info: Project: Space Shuttle Program Approval Info: Approval Date: 2011-12-12 Approval Name: mbell Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1