REG NASA-LLIS-4256-2011 Lessons Learned - Development of the Current Mass Spectrometer Requirements and Techniques.pdf

上传人:testyield361 文档编号:1019447 上传时间:2019-03-21 格式:PDF 页数:2 大小:61.64KB
下载 相关 举报
REG NASA-LLIS-4256-2011 Lessons Learned - Development of the Current Mass Spectrometer Requirements and Techniques.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-4256-2011 Lessons Learned - Development of the Current Mass Spectrometer Requirements and Techniques.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Public Lessons Learned Entry: 4256 Lesson Info: Lesson Number: 4256 Lesson Date: 2010-09-23 Submitting Organization: KSC Submitted by: Annette Pitt Subject: Development of the Current Mass Spectrometer Requirements and Techniques Abstract: Leak checks utilizing a mass spectrometer have been an effec

2、tive method of validating the integrity of fluid systems within the aerospace industry for decades. Mass spectrometers provide a high fidelity leak check, however, unlike soap solution or flow meter leak checks, there isnt a sensory method to validate correct performance of a mass spectrometer leak

3、check. Where a soap solution leak check can be validated visually by looking for the presence of bubbles or a flow meter leak check can be validated with a pinch test of the leak check tubing, proper performance of a mass spectrometer leak check relies on maintaining equipment in current calibration

4、 correctly performing pretest and post test checks when putting the equipment in use, and most importantly, ensuring personnel using the equipment are properly trained. Description of Driving Event: Mass spectrometer leak checks performed at Palmdale during Orbiter Maintenance Down Period for OV104

5、 exhibited several inconsistencies, leading to an investigation of the leak check processes used. The investigation found that permeability ratios and response times for equipment used did not conform to the MF0001-003 specification requirements. Equipment flow rates were also out of limits. An insp

6、ection of the equipment and procedures found that filters were not being used in the test probes, leading to contamination and blockage in the units. Leak checks performed on components with known leakages did not give correct readings with the suspect units. As a result, mass spectrometer leak chec

7、ks performed at Palmdale with the suspect units were re-performed at KSC. Lesson(s) Learned: Proper maintenance of equipment and training of personnel are of vital importance in ensuring the integrity of leak checks performed with mass spectrometer units. Detailed processes and procedures for using

8、the equipment must be developed and carefully followed. Recommendation(s): Utilize mass spectrometer leak checks for critical systems where even small external leakages can have serious consequences. Ensure procedures are correct, detailed and followed. Maintain equipment in calibration. Perform pre

9、test and post-test checks of the equipment when performing leak checks. Ensure operations are properly trained and that they have a good working knowledge of the equipment and how to use it. Evidence of Recurrence Control Effectiveness: N/A Documents Related to Lesson: Rockwell International specifi

10、cation MF0001-003 Proof Pressure And Leak Detection-Aerospace Plumbing Systems And Assemblies Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Mass Spec Machine Permeability Ratio Document Click here to download communication document. Mission Directo

11、rate(s): Space Operations Additional Key Phrase(s): 1.Maintenance 1.Test & Verification 1.Configuration Management 1.Long term sustainability and maintenance planning 1.Ground Operations Additional Info: Project: Space Shuttle Program Approval Info: Approval Date: 2011-12-12 Approval Name: mbell Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS DD CEN TS 54-14-2004 Fire detection and fire alarm systems - Guidelines for planning design installation commissioning use and maintenance《火灾探测和火警系统 计划、设计、安装、交付使用、使用和维护指南》.pdf BS DD CEN TS 54-14-2004 Fire detection and fire alarm systems - Guidelines for planning design installation commissioning use and maintenance《火灾探测和火警系统 计划、设计、安装、交付使用、使用和维护指南》.pdf
  • BS DD CEN TS 635-4-2007 Plywood - Classification by surface appearance - Parameters of ability for finishing guideline《胶合板 按表观分类 精整能力的参数用指南》.pdf BS DD CEN TS 635-4-2007 Plywood - Classification by surface appearance - Parameters of ability for finishing guideline《胶合板 按表观分类 精整能力的参数用指南》.pdf
  • BS DD CEN TS 772-22-2006 Methods of test for masonry units - Determination of freeze thaw resistance of clay masonry units《砌块的试验方法 测定黏土砌块的耐冻融性》.pdf BS DD CEN TS 772-22-2006 Methods of test for masonry units - Determination of freeze thaw resistance of clay masonry units《砌块的试验方法 测定黏土砌块的耐冻融性》.pdf
  • BS DD CEN TS 81-11-2011 Safety rules for the construction and installation of lifts Basics and interpretations Interpretations related to EN 81 family of standards《电梯建造和安装的安全规则 基础和.pdf BS DD CEN TS 81-11-2011 Safety rules for the construction and installation of lifts Basics and interpretations Interpretations related to EN 81 family of standards《电梯建造和安装的安全规则 基础和.pdf
  • BS DD CEN TS 81-76-2012 Safety rules for the construction and installation of lifts Particular applications for passengers and goods passenger lifts Evacuation of disabled persons .pdf BS DD CEN TS 81-76-2012 Safety rules for the construction and installation of lifts Particular applications for passengers and goods passenger lifts Evacuation of disabled persons .pdf
  • BS DD CEN TS 81-83-2009 Safety rules for the construction and installation of lifts - Existing lifts - Rules for the improvement of the resistance against vandalism《电梯的建造和安装用安全规则 现.pdf BS DD CEN TS 81-83-2009 Safety rules for the construction and installation of lifts - Existing lifts - Rules for the improvement of the resistance against vandalism《电梯的建造和安装用安全规则 现.pdf
  • BS DD CEN TS 843-9-2010 Advanced technical ceramics n Mechanical properties of nmonolithic ceramics at room ntemperature Part 9 Method of test for edge-chip nresistance《高级工业陶瓷 单片陶瓷.pdf BS DD CEN TS 843-9-2010 Advanced technical ceramics n Mechanical properties of nmonolithic ceramics at room ntemperature Part 9 Method of test for edge-chip nresistance《高级工业陶瓷 单片陶瓷.pdf
  • BS DD CLC TS 50136-4-2004 Alarm systems - Alarm transmission systems and equipment - Annunciation equipment used in alarm receiving centres《警报系统 警报传输系统和设备 警报接收中心用报警设备》.pdf BS DD CLC TS 50136-4-2004 Alarm systems - Alarm transmission systems and equipment - Annunciation equipment used in alarm receiving centres《警报系统 警报传输系统和设备 警报接收中心用报警设备》.pdf
  • BS DD CLC TS 50206-3-2010 Railway applications Rolling stock Pantographs Characteristics and tests Interface between pantograph and rolling stock for rail vehicles《轨道交通 轨道车体 受电弓 特征.pdf BS DD CLC TS 50206-3-2010 Railway applications Rolling stock Pantographs Characteristics and tests Interface between pantograph and rolling stock for rail vehicles《轨道交通 轨道车体 受电弓 特征.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1