1、MIL-A-63109 13 W 979790b 0343775 3 W i B-u P w I al ci ci .- 5 I c I- al u al w K I LL. cu cu ZE X I O LL m S K al CI K .- n c .- - a MIL-A-63L09 13 7999706 0343778 9 E al O n m U al u m U U K ,- I- y- cu“r*lcucucuNcu . M MMMMMMMMMM r cucu MM U al rc al n mal K U0 u al ci .- I= -mal ou u-ci u al % a
2、l n 8 -u- “ fis -0 Iu u u c al E L S VI m 11) f I al 3 O n (d U al o K al S U al al c ci C U K m u) m c C al ci K m Ln al ,- t m al I= w K O U al E I O t L al al n n m - - S ln - t N N 5 n 3 0. m S o ci C m I O t w m al - fl L . Provided by IHSNot for ResaleNo reproduction or networking permitted wi
3、thout license from IHS-,-,-MIL-A=63109(AR) flIL-A-63L7 13 W 7779706 0343777 0 _ 4.4.3 Testibg. - Testing is described in the First Article and Quality Conformance Inspection tables. 4.4 Quality confomance inspection 4.4.1 1ns.pectbn .lat formation. - Inspection lots shall comply with the lot formati
4、on provisions of MTL-A-48078. 4.4.2 Examination -(See MIL-A-48078). - Unless otherwise specified in the Classification of Defects and Test tables, sampling plans for major and minor defects shall be in accord- ance with MIL-STD-105, Inspection Level II. 5 Provided by IHSNot for ResaleNo reproduction
5、 or networking permitted without license from IHS-,-,-m S S al +J c a MIL-A-63LOS 13 = 7777906 0343GO 7 U M MmMMMMMMMMMMMMM M NNNNNNNNNNNN?NN OO O a L .- U al S u- Q U al S O c v) S Y E L O 3 I O O a 4- O a u S al U .- w .- =I u- 0 u1 ci m al +J al c ci m S +J u S U S O u O CI L 8- o. .- L a u t - a
6、 S m w v) al c L O rc In al a E m m S al +J a L c S O U al O 4- I al a al LI -In m- ms L -2 mw hl Q- s- O Lv) mw u -val VIU. ala +U c E cc x v g O 2 - 6 _- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-U MIL-A-63309 33 W 979790b O343783 9 - b - I-
7、W w I v) .* 0000000000 0- a, 3 ln Q m u - c .- O o u-a U a, 13 al S u- a, U al S O z .- G9 a,L- no .- o lnn S .- u- O rc OQ u ST -a UI-0 S .- a -Iw -I 7 g O 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-A-63109 (AR) -MIL-A-b3L03 13 m 7777706
8、O343782 O 4.4.4 Inspection quiplnent. - The inspection equipment required to perform the examinations and tests prescribed herein is described in the Paragraph Reference Inspection Method column in the tables starting with paragraph 4.4.2.1. The contractor shall submit for approval inspection equipm
9、ent designs in accordance with the terms of the contract. See Section 6 of MIL-A-48078 and 6.3 herein. 4 . 5 Test me.thas: .and procedures. 4.5.1 Environmental teslt group. - The test in this group shall be performed in a sequential manner from 4.5.1.1 4 . 5 . 1 . 1 Terriperaturi5 eyc:ih:g test: - T
10、he antenna shall be tested for the specified requirements in accord- ance with Method 102, .Test Condition D of MIL-CTD-202. Any antenna failing to comply with all of the specified require- ments shall be classed defective (Non-destructive test). 4.5.1.2 Moisture resistance test. - The antenna shall
11、 be tested for the specified requirements in accordance with Method 106 (Non-subcycling) of MIL-STD-202. Any antenna failing to comply with all of the specified requirements shall be classed defective (Non-destructive test). 4.5.1.3 Sand and dust test. - The antenna shall be tested for the specified
12、 requirements in accordance with the requirements of MIL-T-5422. Any antenna failing to comply with all of the specified requirements shall be classed defective (Non-destructive test). 4.5.1.4 Salt spray test - The antenna shall be tested for the specified requirements in accordance with Method 101,
13、 Test Condition B of MIL-CTD-202. Any antenna failing to comply with all of the specified requirements shall be classed defective (Non-destructive test). 4.5.1.5 Vibrat2on test. - The antenna shall be fully collapsed and tested for the applicable requirements in accordance with Method 204, Test Cond
14、ition A of MIL-STD-202 except that the amplitude of vibration, will be 0.060 inch double amplitude from 10 to 96 hereby and 30 Gs constant acceleration from 96 to 500 hertz (Non-destructive test) . 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*
15、MIL-A-63L09 13 = 7779906 O343783 2 =i MIFA-O(AR) 4.5.1.6 Shock test. - The antenna shall be fully collapsed and tested for the applicable requirements in accordance with Method 205, Test Condition A of MIL-STD-202. (Non-destructive test) test shall be performed after they have been subjected to the
16、test requirements of 4.5.1. (largest) segment secured in a vertical position fixture, be fully extended and have a twenty (20.0) pound minimum of thirty plus or minus ten (30.0+ 10.0) seconds. As a result of this force, the antenna shall not show evidence of mechanical damage nor shall the segments
17、separate (Non- destructive test). 4.5.2 Mechanical strength test group. - The following * 4.5.2.1 Pull test. - The antenna shall have the first L weight applied ta the last (smallest) segment for a period 4.5.2.2 Extension force test. - The antenna shall be fully collapsed mounted in a fixture and p
18、ulled with a maximum force of eight (8) pounds in the direction of this fixture for a time not to exceed five (5) seconds. During this time the antenna shall become fully extended. Any antenna failing to comply with all of the specified requirements shall be classed defective (Non-destructive test).
19、 fully extended in a vertical position, clamped at the base in a fixture and have a three (3) ounce weight applied to the top section of the antenna for thirty (30) seconds minirnwn time. During this time the antenna shall not incur a shortened length. all of the specified requirements shall be clas
20、sed defective. (Non-destructive test) . 4.5.2.3 Collapsing force test. - The antenna shall be Any antenna failing to comply with 4.5.2.4 Distortion test. - The lower six (6) inches of the antennabase shall be securely clamped in a vertical fixture after it is fully extended. A ten plus one (l.03.1)
21、pound weight shall be positioned at the top end at a point ten plus or minus one tenth (10.0 + 0.1) inches from the antennas longitudinal center for minimum period of ten (10) seconds. After the weight is removed the antenna shall roll down a ten plus one (10.0 + 1.0) degree inclined ramp which E wi
22、ll permit at a minimum three (3) rotations of the antenna, The antenna shall not be collapsed for the test duration. antenna failing to comply with all of the specified requirements shall be classed defective (Non-destructive test). Any 9 Provided by IHSNot for ResaleNo reproduction or networking pe
23、rmitted without license from IHS-,-,- VIL-A-b3107 13 797770b 0343784 4 MIL-A-63109 (AR) 4.5.3 Power measurement test. - The antenna shall be measured for the specified VSWR at the specified frequency using Government approved equipment. Any antenna failing to comply with all of the specified require
24、ments shall be classed defective (Non-destructive test) . 4.5.4 Data Requirements. - The contractor shall submit a quality inspection test, demonstration and evaluation report in accordance with Data Item Description DI-R-1724 (tailored) giving all detailed inspection and test results. 5. PREPARAITO
25、N FOR DELIVERY 5.1 Preservation and packaginq 5.1.1 Level C. - Each antenna shall be preserved and packaged in accordance with MIL-STD-1169. 5.2 Packing 5.2.1 Level C. - The antenna, preserved and packaged in 5.1.1, shall be packed for shipment in accordance with MIL-STD-1169. 5.3 Marking. - Marking
26、 of the carton shall comply with MIL-STD-1169 . 5.4 Shipping. - When antennas of more than one lot are shipped together, each lot shall be kept separate and the division between lots clearly indicated to prevent mix- ing of the lots in transit. 6. NOTES 6.1 Intended use. - The components and assembl
27、ies covered by this specification are intended for use as the antenna for the XM122 firing device transmitter. This specification is to be used only as a guideline only in establishing on updated version of this device. 6.2 Ordering data. - See Section 6.1 and 6.2 of MIL-A-48078. 6.3 Submission of i
28、nspection equipment designs for approval (See MIL-A-48078) . - Submit equipment designs as required to: 10 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-A-63107 13 W 7777706 03i3785 6 E MIL-A-63109 (AR) Commander ARRADCOM Dover, New Jersey 07801 ATTN: DRDAR-QAA-I Commander ARRADCOM Dover, New Jersey 07801 ATTN : DRDAR-QAA-Q Custodian : Army-AR Project Number: 1375-A-192 Preparing Activity: Army-AK 11 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1