1、HIL-P-708L9 (1) 99999Ob 2003b2 48b INCH-POUND MIL-P-70819 (AR) AMENDMENT 1 12 June 1995 MILITARY SPECIFICATION PRIMER, ELECTRIC, M128 LOADING, ASSEMBLING AND PACKING This amendment forms a part of Military Specification MIL-P-70819 (AR), dated 28 February 1991, and is approved for use by the U.S. Ar
2、my Armament Research, Development and Engineering Center and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 2.1.1 SPECIFICATIONS MILITARY, add: “MIL-A-70625 - Automated Acceptance Inspection Equipment Design, Testing and Approval, of.“ PAGE 3 3.6: Delete in
3、 its entirety and substitute: II 3.6 Torque. 3.6.1 Head loadins assemblv. The Retainer and Closing Plug Loading Assembly shall comply with drawing torque requirements. (See 4.8.4.1). 3.6.2 Primer loadina assemblv. The Primer Head/Body threaded joint shall comply with drawing torque requirements. (Se
4、e 4.8.4.2.)“ PAGE 13 4.6.2.5: Delete in its entirety and substitute new paragraph 4.6.2.5. AMSC N/A Page 1 of 3 FSC 1315 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
5、MIL-P-70819 (1) rn 9999906 2003b93 312 rn I W o z W CL W O 5 a 0 * r W I Q I- YI a f f 1 r I- V) W c c O z a, a, * rlrlrl*ridrl rl rl b PPPE-OPPP P P lumm*ommm m m =r wel+=f7F+l3w w l3 c, m a, c, M c .d e O .FI c, O c 7 Y Provided by IHSNot for ResaleNo reproduction or networking permitted without l
6、icense from IHS-,-,-MIL-P-70819 (1) 9999%0b 2003674 259 m MIL-P-70819 (AR) AMENDMENT 1 PAGE 16 4.6.2.8, Category 107: Delete “4.8.4“ and substitute “4.8.4.2“. PAGE 25 4.8.4: Delete in its entirety and substitute: “4.8.4 Torque testinq. 4.8.4.1 Head loadins assemblv. Torque shall be verified by eithe
7、r performing torque inspections of assembled components or by periodic verification of the torque machine. When torque is verified by inspection of assembled components, torque tests shall be performed by reapplication of torque, while the lacquer is still wet (within 5 minutes of application), and
8、with the part suitably marked and held for detection of movement between adjacent parts. Any discernible movement between adjacent parts is a torque test failure. When torque application is confirmed by monitoring the torque machine, a periodic verification of machine output values is required. Deta
9、iled requirements of the verification technique shall be in accordance with MIL-A-70625A and 6.4. Failure to meet the requirement will cause rejection of all production since the last successful verification. 4.8.4 curing of direct ion .2 Primer loadins assemblv. After a 2 hour minimum sealant, the
10、torque shall be applied in the loosening , while holding the head. The joint under test shall be marked to provide a means of detecting any movement between adjacent parts. parts shall be regarded as a torque test failure.“ Any discernible movement between adjacent Custodian : Army-AR Preparing activity: Army-AR (Project 1315-0086) 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-