ARMY MIL-P-70819 (1)-1995 PRIMER ELECTRIC M128 LOADING ASSEMBLING AND PACKING《M128式电引物的装药 组装和包装》.pdf

上传人:Iclinic170 文档编号:446944 上传时间:2018-11-16 格式:PDF 页数:3 大小:116.66KB
下载 相关 举报
ARMY MIL-P-70819 (1)-1995 PRIMER ELECTRIC M128 LOADING ASSEMBLING AND PACKING《M128式电引物的装药 组装和包装》.pdf_第1页
第1页 / 共3页
ARMY MIL-P-70819 (1)-1995 PRIMER ELECTRIC M128 LOADING ASSEMBLING AND PACKING《M128式电引物的装药 组装和包装》.pdf_第2页
第2页 / 共3页
ARMY MIL-P-70819 (1)-1995 PRIMER ELECTRIC M128 LOADING ASSEMBLING AND PACKING《M128式电引物的装药 组装和包装》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、HIL-P-708L9 (1) 99999Ob 2003b2 48b INCH-POUND MIL-P-70819 (AR) AMENDMENT 1 12 June 1995 MILITARY SPECIFICATION PRIMER, ELECTRIC, M128 LOADING, ASSEMBLING AND PACKING This amendment forms a part of Military Specification MIL-P-70819 (AR), dated 28 February 1991, and is approved for use by the U.S. Ar

2、my Armament Research, Development and Engineering Center and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 2.1.1 SPECIFICATIONS MILITARY, add: “MIL-A-70625 - Automated Acceptance Inspection Equipment Design, Testing and Approval, of.“ PAGE 3 3.6: Delete in

3、 its entirety and substitute: II 3.6 Torque. 3.6.1 Head loadins assemblv. The Retainer and Closing Plug Loading Assembly shall comply with drawing torque requirements. (See 4.8.4.1). 3.6.2 Primer loadina assemblv. The Primer Head/Body threaded joint shall comply with drawing torque requirements. (Se

4、e 4.8.4.2.)“ PAGE 13 4.6.2.5: Delete in its entirety and substitute new paragraph 4.6.2.5. AMSC N/A Page 1 of 3 FSC 1315 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

5、MIL-P-70819 (1) rn 9999906 2003b93 312 rn I W o z W CL W O 5 a 0 * r W I Q I- YI a f f 1 r I- V) W c c O z a, a, * rlrlrl*ridrl rl rl b PPPE-OPPP P P lumm*ommm m m =r wel+=f7F+l3w w l3 c, m a, c, M c .d e O .FI c, O c 7 Y Provided by IHSNot for ResaleNo reproduction or networking permitted without l

6、icense from IHS-,-,-MIL-P-70819 (1) 9999%0b 2003674 259 m MIL-P-70819 (AR) AMENDMENT 1 PAGE 16 4.6.2.8, Category 107: Delete “4.8.4“ and substitute “4.8.4.2“. PAGE 25 4.8.4: Delete in its entirety and substitute: “4.8.4 Torque testinq. 4.8.4.1 Head loadins assemblv. Torque shall be verified by eithe

7、r performing torque inspections of assembled components or by periodic verification of the torque machine. When torque is verified by inspection of assembled components, torque tests shall be performed by reapplication of torque, while the lacquer is still wet (within 5 minutes of application), and

8、with the part suitably marked and held for detection of movement between adjacent parts. Any discernible movement between adjacent parts is a torque test failure. When torque application is confirmed by monitoring the torque machine, a periodic verification of machine output values is required. Deta

9、iled requirements of the verification technique shall be in accordance with MIL-A-70625A and 6.4. Failure to meet the requirement will cause rejection of all production since the last successful verification. 4.8.4 curing of direct ion .2 Primer loadins assemblv. After a 2 hour minimum sealant, the

10、torque shall be applied in the loosening , while holding the head. The joint under test shall be marked to provide a means of detecting any movement between adjacent parts. parts shall be regarded as a torque test failure.“ Any discernible movement between adjacent Custodian : Army-AR Preparing activity: Army-AR (Project 1315-0086) 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1