1、MIL-DTL-44404A I 9999906 2337370 599 I I INCH-POUND 1 MIL-DTL-44404A 30June1999 SUPERSEDING MIL-T-44404(GL) 6 April 1990 DETAILED SPECIFICATION TENT, COMMAND POST, STANDARDIZED INTEGRATED COMMAND POST SYSTEM This specification is approved for use by all Departments and Agencies of the Department of
2、Defense. 1. SCOPE 1.1 Scope. This specification covers one complete Standardized Integrated Command Post System. 1.2 Classification. (See 6.2). Class 1 - Camouflage green 483 Class 2 - Desert tan 459 2. APPLICABLE DOCUMENTS 2.1 Government documents. * 2.1.1 Specifications. standards. and handbooks.
3、The following specifications, standards, and handbooks of the exact revision listed below form a part of this document to the extent specified herein. Beneficial comments (recommendations, additions, deletions, clarifications) and any I pertinent data which may be of use in improving this document s
4、hould be addressed to: Defense Supply Center Philadelphia, Clothing and Textiles Directorate, Attn: DSCP-CNR, 700 Robbins Avenue, Bldg 6, Area D, Philadelphia, PA 19111-5096 by using the Standardization Document Improvement Proposai (DD Form 1426) appearing at the end 01 this document or by letter.
5、AMSC NIA FSC 8340 Licensed by Information Handling ServicesflIL-DTL-44404A 0b 2337373 425 MIL-DTL-44404A SPECIFICATIONS MILITARY MIL-P-501 - Pins, Tent, Metal MIL-P-2383 - Pins, Tent, Wood MIL-L-44259 MIL-B-443 8 1 MIL-T-44382 MIL-F-44397 - Frame, Tent, (SICPS) MIL-T-44400 - Light Set, Portable, Flu
6、orescent - Board, Map, Complexing (SICIPS) - Table, Field, Folding Legs, Metal - Tent, Fabric Assemblies, Standardized Integrated Command Post System (Unless otherwise indicated, copies of federal and military specifications, standards, and handbooks are available fiom the Defense Automated Printing
7、 Service, Bldg 4D (DPM- DODSSP), 700 Robbins Avenue, Philadelphia, PA 191 11-5094.) * 2.1.2 Other Government documents. drawings, and Dublications. The following other Government documents, drawings, and publications of the exact revision level shown form a part of this document to the extent specif
8、ied herein. DRAWINGS U.S. ARMY NATICK RESEARCH, DEVELOPMENT & ENGINEERING CENTER 5-4-6340 - Command Post, Tent (SICPS) 5-4-7473 - Erection Procedure (Copies of drawings are available from the U. S. Army Natick Research, Development and Engineering Center, AT“: SSCNC-EMSS, NATICK, MA O1 760-5017.) *
9、2.1.3 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of this specification takes precedence. Nothing in this specification, however, supersedes applicable laws and regulations unless a specific exemption has been obtai
10、ned. 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample shail be subjected to first article inspection (see 4.3). * 3.2 Materials and commnents. Materials and components shail be as specified herein and in referenced documents. Materiais not definitely specified shall be of the qu
11、ality normally used by the manufacturer provided the complete item complies with ail provisions of this document. It is encouraged that recycled materials be used when practical as long as it meets the requirements of this document. The components in the quantity shown in Table I make up one complet
12、e SICPS system. Class 1 command posts shall be assembled in accordance with Drawing 5-4-6340-1 and class 2 command posts shall be assembled in accordance with Drawing 5-4-6340-2. 2 Licensed by Information Handling ServicesMIL-DTL-44404A I 999990b i3373172 361 m I MIL-DTL-44404A TABLE I. Components C
13、omponent Descrbtion OUantiW Plain wall MIL-T-44400 1 Window wall MIL-T-44400 2 Entrance way wall MIL-T-44400 1 Roof cap MIL-T-44400 1 Plain wall liner MIL-T-44400 1 Entrance waywindow MIL-T-44400 3 Rain gutter MIL-T-44400 1 Floor MIL-T-44400 1 Support straps MIL-T-44400 10 Transport bag - fiame MIL-
14、T-44400 1 Transport bag - fabric MIL-T-44400 2 Pin container MIL-T-44400 1 Steel pins MIL-P-50 1, Type II 8 Wood pins MIL-P-2383, Size 2 8 Frame MIL-F-44397 1 Table MIL-T-44382 2 Mapboard MIL-B-4438 1 4 LiPht set MIL-L-44259, Type II 1 wall liner 3.3 Workmanship. The end item shall conform to the qu
15、ality of product established by this specification. 4. VERIFICATION 4.1 Classification of inspection. The inspection requirements specified herein are classified as follows: a. b. Conformance inspection (see 4.3). First article inspection (see 4.2). 4.2 First article inspection. When a first article
16、 is required (see 3.1 and 6.2) it shall be examined for the defects specified in 4.4.2. Any nonconformance shall be cause for rejection of the first article. 4.3 Conformance insriection. Sampling for inspection shall be as specified in the contract or purchase order. 4.3.1 Component and material ins
17、tiection. Components and materials shall be inspected in accordance with all the requirements of referenced documents unless otherwise excluded, amended, modified or qualified in this specification or appIicable purchase document. 4.3.2 Resuonsibilitv for dimensional requirements. Unless otherwise s
18、pecified in the contract or purchase order, the contractor is responsible for ensuring that all dimensions specified in the component specifications have been met. When dimensions cannot be examined on the end item, inspection shall be made at any point, or at ail points in the manufacturing process
19、 necessary to ensure compliance with ail dimensional requirements. 3 Licensed by Information Handling ServicesMIL-DTL-44404A 111 999990b 2LL7373 2TB w MIL-DTL-44404A 4.3.3 End item visual examination. The fully packaged end item (see 5.1) shall be unpacked, then erected in accordance with Drawing 5-
20、4-7473. The mapboards shall be complexed and hung fi-om the he utilizing the support straps. The light set shall be hung utilizing the light support straps and energized. The system shall be examined for the defects listed in Table II. The system shall then be repackaged and packed into the shipping
21、 container. The lot size shall be expressed in units of systems. The sample unit shall be one complete system. The sample size shall be as indicated below. The presence of any defect shall be cause for rejection of the lot, Lot size 1 to50 51 to 150 151 to300 301 and over Samtde size 1 2 3 5 TABLE I
22、I. Defects Classification Examine Defect Maior Minor Assembled system Any component missing X Damaged or nonconforming component X Any component or assembly not properly companion assembly X connected or joined with Frame and tent not moperly mated X 4.4 Packaging examination. The fully packaged end
23、 items shall be examined for marking, materials, workmanship and content defects. 5. PACKAGING * 5.1 Packahp. For acquisition purposes, the packaging requirements shall be as specified in the contract or order (see 6.2). When actual packaging of materiel is to be performed by DoD personnel, these pe
24、rsonnel need to contact the responsible packaging activity to ascertain requisite packaging requirements. Packaging requirements are maintained by the Inventory Control Points packaging activity within the Military Department or Defense Agency, or within the Military Departments System Command. Pack
25、aging data retrieval is available hm the managing Military Departments or Defense Agencys automated packaging files, CD-ROM products, or by contacting the responsible packaging activity. 6. NOTES (This section contains information of a general or explanatory nature that may be helpful, but is not ma
26、ndatory .) * 6.1 Intended use. The Standardized, Integrated Command Post System may be used as a stand alone command post, with tracked vehicles, and with rigid wall shelters. The class 1 command post is to be used in all theaters except the desert. The class 2 command post is to be used in the dese
27、rt. 4 Licensed by Information Handling ServicesMIL-DTL-44404A i 9999906 2337374 134 MIL-DTL-44404A 6.2 Acquisition requirements. Acquisition documents must speci the following: a. Title, number, and date of this specification. b. Issue of DODISS to be cited in the solicitation, and if required, the
28、specific issue of individual documents referenced (see 2.2 and 2.2.1). d. Class required (see 1.2). e. Levels of preservation and packing (see 5.1). c. When first article is required (see 3.1 and 4.3). 6.3 Sample. For access to standard sample, address the contracting activity issuing the invitation for bids. 6.4 Subiect term (key word) listing. Frame Light Set Map Board Table custodians: hy - GL 5 Preparing activity Project No: 8340-0573 DLA-CT Licensed by Information Handling Services
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1