NF P15-471-7-2008 Methods of testing cements - Part 7 methods of taking and preparing samples of cement 《水泥的测试方法 第7部分 水泥样品的取样和制备方法》.pdf

上传人:visitstep340 文档编号:1003736 上传时间:2019-03-18 格式:PDF 页数:21 大小:442.24KB
下载 相关 举报
NF P15-471-7-2008 Methods of testing cements - Part 7  methods of taking and preparing samples of cement 《水泥的测试方法 第7部分 水泥样品的取样和制备方法》.pdf_第1页
第1页 / 共21页
NF P15-471-7-2008 Methods of testing cements - Part 7  methods of taking and preparing samples of cement 《水泥的测试方法 第7部分 水泥样品的取样和制备方法》.pdf_第2页
第2页 / 共21页
NF P15-471-7-2008 Methods of testing cements - Part 7  methods of taking and preparing samples of cement 《水泥的测试方法 第7部分 水泥样品的取样和制备方法》.pdf_第3页
第3页 / 共21页
NF P15-471-7-2008 Methods of testing cements - Part 7  methods of taking and preparing samples of cement 《水泥的测试方法 第7部分 水泥样品的取样和制备方法》.pdf_第4页
第4页 / 共21页
NF P15-471-7-2008 Methods of testing cements - Part 7  methods of taking and preparing samples of cement 《水泥的测试方法 第7部分 水泥样品的取样和制备方法》.pdf_第5页
第5页 / 共21页
点击查看更多>>
资源描述

1、NF EN 196-7juillet 2008Ce document est usage exclusif et non collectif des clients Saga Web.Toute mise en rseau, reproduction et rediffusion, sous quelque forme que ce soit,mme partielle, sont strictement interdites.This document is intended for the exclusive and non collective use of Saga Web custo

2、mers.All network exploitation, reproduction and re-dissemination,even partial, whatever the form (hardcopy or other media), is strictly prohibited.Saga Web Pour SHANGHAI INTERNAT SCIENCE b) Object and field of application is now re-titled Scope; c) References not normatively listed within the docume

3、nt have been deleted from clause 2; d) Clause 3.8 reference to certification regulations has been deleted as this is now covered in EN 197-2 and Annex ZA of EN 197-1:2000; e) Clause 4.2 (previously 4.1) reference to additional equipment has been deleted as it is now covered in EN 197-2 and in guidan

4、ce document PD CR 14245; f) Reference to responsibility regarding sampling (previously clause 4.3) has been deleted as it is now covered in EN 197-2 g) Clause 5 restriction to sampling whilst fluidized has been deleted since many modern samplers operate satisfactorily in such circumstances; h) Claus

5、e 6 (previously 6.7) reference to sampling from bag filling machines has been deleted as being in conflict with the requirements in many specifications for only filled bags to be sampled; According to the CEN/CENELEC Internal Regulations, the national standards organizations of the following countri

6、es are bound to implement this European Standard: Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain,

7、 Sweden, Switzerland and the United Kingdom. EN 196-7:2007 (E) 41 Scope This European Standard describes the equipment to be used, the methods to be followed and the provisions for taking samples of cement, representative of given lots for testing, to assess the quality of products prior to, during

8、or after delivery. The provisions of this standard are only applicable when samples of cement are: a) required for evaluating the conformity of a cement at any time with a standard; or b) requested for checking a delivery or a lot with a standard, the provisions of a contract or the specification in

9、 an order. The standard is applicable to the taking of samples of all types of cements defined by European Standards for cements whether they are: c) contained in silos; d) contained in bags, canisters, drums or any other packages; e) transported in bulk in road vehicles, railway wagons, ships, etc.

10、 NOTE The requirements of this standard can also, by agreement between the parties, be followed for acceptance inspections for all non-standardized hydraulic binders. 2 Normative references Not applicable. 3 Terms and Definitions For the purpose of this European Standard, the following terms and def

11、initions apply. 3.1order quantity of cement covered by a single requisition placed with a single manufacturer, factory, depot or dispatching centre. It may consist of one or more consignments spread over a period of time 3.2consignment quantity of cement delivered at a given time by a single manufac

12、turer, factory, depot or dispatching centre. It may consist of one or more lots 3.3lotquantity of cement produced under conditions presumed uniform NOTE After specified tests this quantity is regarded as a whole as meeting or not meeting a standard, the provisions of a contract or the specification

13、in an order. 3.4increment quantity of cement taken in a single operation of the sampling equipment used EN 196-7:2007 (E) 53.5sample quantity of cement taken at random, or in accordance with a sampling plan, from a larger quantity (silo, stock of bags, wagons, trucks, etc.) or from a fixed lot, rela

14、ting to the intended tests. A sample may consist of one or more increments3.6spot sample sample taken within a short period of time and at a fixed point from within a larger quantity, relating to the intended tests. It can be obtained by combining one or more immediately consecutive increments3.7com

15、posite sample homogeneous mixture of spot samples taken: a) at different points; or b) at different times; from a larger mass of the same cement, obtained by thoroughly mixing the combined spot samples and, if necessary, reducing the size of the resulting mixture 3.8laboratory sample sample prepared

16、 by thoroughly mixing and if necessary reducing from a larger sample (spot or composite sample) and intended for use by laboratories undertaking the tests 3.9sample for retest sample which is to be kept for possible subsequent tests in the event of the results from tests carried out on laboratory sa

17、mples being in doubt or disputed 3.10retained sample sample taken systematically from regular deliveries (for example for large works), if necessary in the presence of all the parties concerned, to be retained for possible testing in the event of doubt or dispute or subsequent problems NOTE Definiti

18、ons 3.1, 3.2, 3.3and 3.10only have meaning in the case of checks made when taking delivery of a supply. 4 General 4.1 Purpose The purpose of the sampling operations is to obtain from a large quantity of cement (contained in a silo, a stock of bags in a warehouse, truck, etc., or in a defined lot), o

19、ne or more smaller quantities, considered by the parties concerned to represent the quantity of cement of which the quality is to be assessed. 4.2 Equipment The equipment used, methods followed, and precautions taken may vary according to the nature of the installation and the circumstances in which

20、 the samples are taken. EN 196-7:2007 (E) 64.3 Representation In the case of taking delivery of supply, sampling should take place in the presence of representatives of the manufacturer (or vendor) and the customer (or purchaser). The absence of one of them should not, however, be a barrier to sampl

21、ing but if this occurs it should be recorded in the sampling report (see clause 10). The sample is normally taken before or during discharge or unloading. However, if necessary, it may be taken after discharge or unloading but with a maximum delay of 24 h. In this latter case the results of the chec

22、ks shall be interpreted with care. NOTE For various reasons, the cement to be tested may no longer be representative of the product at the time of its discharge or unloading, when a delay in sampling occurs. In all cases, the time of sampling shall be recorded in the sampling report (see clause 10).

23、 When samples are taken after discharge or unloading, the recommendations in the first paragraph above remain applicable. 5 Sampling equipment Industrial installations and the circumstances in which samples have to be taken are many and diverse. Consequently, it is not possible to specify a single t

24、ype of reference equipment against which other types can be validated. Hence, this standard only gives, by way of example in Annex A, a simplified illustration of the devices normally used and which have been found to be satisfactory. This equipment is either portable (ladle, tube, screw sampler, et

25、c.) or permanently installed (screw extractor or other equipment fixed permanently onto the container). The equipment shall be chosen and used in accordance with the following requirements. The equipment shall be: a) approved by all the parties; b) of non-corrodible material, which is not liable to

26、react with the cement; c) maintained always in working order and in a clean state. Care shall be taken to ensure that it is carefully cleaned after each sampling operation (see Note). Care shall also be taken to ensure that it is not contaminated by lubricants from other equipment used. NOTE However

27、, cleaning is not necessary between taking successive increments from the same cement which are intended for making up the sample. 6 Procedures for taking samples 6.1 General The most suitable equipment for the circumstances shall be used to take a sample, observing the following precautions as appr

28、opriate. EN 196-7:2007 (E) 76.2 Sampling from bags, drums and containers of small size When the cement is packed in bags, drums or other small containers, the sample shall comprise one or more bags, drums or containers chosen at random from a sufficiently large stock in order to meet the requirement

29、s of the second paragraph of 8.1. 6.3 Sampling from large containers and bulk transport (after loading or before unloading) For all equipment used, care shall be taken not to take material from the top or bottom layers of the mass of cement. The thickness of the layer to be considered is at least 15

30、 cm. Precautions to be taken include: a) not to operate in dusty or polluting atmospheres; b) take the number of samples necessary to obtain the quantity prescribed in the second paragraph of 8.1; c) transfer the collected cement into clean, dry and airtight containers before proceeding with the ope

31、rations described in clause 8. NOTE The equipment described in this standard (see Annex A) does not allow for sample(s) to be taken during unloading. 6.4 Sampling while loading into bulk transports or silos Sampling may be carried out only if suitable equipment is available and if there is access to

32、 a homogeneous phase of cement. Take the same precautions as those described in 6.3a), b) and c). 6.5 Sampling from silos When sampling from a silo, an appropriate quantity of cement shall be discarded to remove the hard deposits or unwanted mixtures of different cements that may be in the distribut

33、ion system. The quantity to be discarded is at the discretion of the manufacturers representative present during the sampling operation. The necessary quantity prescribed in the second paragraph of 8.1shall then be collected in clean and dry containers. 7 Frequency at which samples are taken and cho

34、ice of sample type The frequency of taking samples and the type of sample (spot sample or composite sample) depends on the provisions in: agreements between producer and customer; national or European Standard. EN 196-7:2007 (E) 88 Size and preparation of samples 8.1 Size of sample to be taken Each

35、laboratory sample (or sample for retest or retained sample) shall be of such a size that all the tests wherever specified can be carried out twice. NOTE In general, laboratory samples of at least 5 kg in mass tend to be sufficient but more may be needed to completely fill the container indicated in

36、9.2. The total quantity (spot sample or composite sample) to be taken shall be greater than or at least equal to that required for supplying to all the laboratories concerned, the samples indicated in the first paragraph above. This quantity shall be taken using the equipment specified in clause 5 a

37、nd in accordance with the procedures stated in clause 6. Spot samples, taken by the manufacturer, that are to be tested at a single laboratory may be exempted from the homogenization procedures given in 8.2 and 8.3. 8.2 Homogenization 8.2.1 General requirements As soon as the sample indicated in the

38、 second paragraph of 8.1 has been obtained, it shall be carefully homogenized (preferably in a laboratory) with clean dry implements not liable to react with the cement. Homogenization shall be achieved using a suitable mixing machine where available. In the absence of a mixing machine, the followin

39、g procedure is to be adopted: quantity of cement to be homogenized (see the second paragraph of 8.1) shall be tipped onto a clean dry cloth (or plastics sheet) and shall then be mixed carefully using a shovel. This procedure shall only be used if: a) ambient relative humidity is less than 85 %; b) a

40、ll risks of the sample being affected by wind, rain, snow or dust are avoided. Whatever procedure is chosen, its efficiency shall have been demonstrated (see 8.2.2) and it shall also be carried out as quickly as possible to minimize the exposure of the cement to the air. 8.2.2 Verification of the ef

41、ficiency of homogenization Take approximately equal quantities of two cements of differing physical or chemical characteristics (e.g. Blaine fineness, by EN 196-6, and optionally colour). NOTE To obtain the initial information, the colour of these micro-samples can be compared if care has previously

42、 been taken to select two cements of distinctly different colours. Mix these using one of the procedures described in 8.2.1and note the time between starting and finishing the operation. Once the operation is judged to be complete, take 15 micro-samples, each between 12 g to 20 g, from points equall

43、y distributed within the mass of which the homogeneity is to be verified. Determine the chosen characteristic three times on each of these micro-samples. EN 196-7:2007 (E) 9Homogenization shall be considered to be achieved if the analysis of variance shows there to be no significant differences betw

44、een the 15 micro-samples. In the case of an unsatisfactory result, appropriate steps shall be taken to achieve homogenization, e.g. mixing time may be extended. For a given procedure, the verification of homogenization shall be carried out only once at the time of choosing the procedure and records

45、of satisfactory performance shall be retained. 8.3 Division of the homogenized sample Immediately after homogenization (see 8.2) of the sample, it shall be divided into the required number of laboratory or retained samples by one of the two following procedures: a) in the case where a mixing machine

46、 has been used, the required number of containers may be filled directly from the homogenized sample; b) in the case where a mixing machine was not available, then the required number of laboratory or retained samples shall be prepared either by using a sample divider or, after quartering the quanti

47、ty to be distributed, by extracting with a hand scoop increments of approximately 0,5 kg from each of the quarters and transferring these successively into containers prepared for receiving the laboratory (or retained) samples. This operation shall be continued until the desired mass (indicated in the Note to the first paragraph of 8.1) is obtained in each container. The sequence of distributing the contents of the hand scoop from which each laboratory sample is gradually made up shall be as follows. Distribute successively to each of the laboratory containers X, Y, Z, etc. first a

展开阅读全文
相关资源
猜你喜欢
  • ASTM F1422-1992(1999) Standard Guide for Using the Incident Command System Framework in Managing Civilian Search and Rescue Operations《管理民用搜索和救护工作中事故命令系统结构的应用》.pdf ASTM F1422-1992(1999) Standard Guide for Using the Incident Command System Framework in Managing Civilian Search and Rescue Operations《管理民用搜索和救护工作中事故命令系统结构的应用》.pdf
  • ASTM F1422-2008 Standard Guide for Using the Incident Command System Framework in Managing Search and Rescue Operations《管理搜索和救护工作中事故命令系统结构的应用的标准指南》.pdf ASTM F1422-2008 Standard Guide for Using the Incident Command System Framework in Managing Search and Rescue Operations《管理搜索和救护工作中事故命令系统结构的应用的标准指南》.pdf
  • ASTM F1422-2008(2014) Standard Guide for Using the Incident Command System Framework in Managing Search and Rescue Operations《在管理民众搜救工作中采用应急指挥系统框架的标准指南》.pdf ASTM F1422-2008(2014) Standard Guide for Using the Incident Command System Framework in Managing Search and Rescue Operations《在管理民众搜救工作中采用应急指挥系统框架的标准指南》.pdf
  • ASTM F1423-1997(2002)e1 Standard Practice for Determination of the Quality of Monochrome Images Produced from Non-Impact Personal Computer Printers《非冲击式个人计算机打印机的单色成像质量测定的标准操作规程》.pdf ASTM F1423-1997(2002)e1 Standard Practice for Determination of the Quality of Monochrome Images Produced from Non-Impact Personal Computer Printers《非冲击式个人计算机打印机的单色成像质量测定的标准操作规程》.pdf
  • ASTM F1424-1992(2006) Standard Test Method for Estimating Toner Usage in Full-Color Copiers Utilizing Dry Mono- or Dual-Component Toners《在全色复制器中利用单或双成分干调色剂评定调色剂使用法的测试》.pdf ASTM F1424-1992(2006) Standard Test Method for Estimating Toner Usage in Full-Color Copiers Utilizing Dry Mono- or Dual-Component Toners《在全色复制器中利用单或双成分干调色剂评定调色剂使用法的测试》.pdf
  • ASTM F1424-1992(2011) Standard Test Method for Estimating Toner Usage in Full-Color Copiers Utilizing Dry Mono- or Dual-Component Toners《在全色复制器中利用单或双成分干调色剂评定调色剂使用法的标准试验方法》.pdf ASTM F1424-1992(2011) Standard Test Method for Estimating Toner Usage in Full-Color Copiers Utilizing Dry Mono- or Dual-Component Toners《在全色复制器中利用单或双成分干调色剂评定调色剂使用法的标准试验方法》.pdf
  • ASTM F1425-2006 Standard Test Method for Determining the Tribocharge of Two-Component Developer Materials《两成分显影材料摩擦电荷测定的标准试验方法》.pdf ASTM F1425-2006 Standard Test Method for Determining the Tribocharge of Two-Component Developer Materials《两成分显影材料摩擦电荷测定的标准试验方法》.pdf
  • ASTM F1425-2006(2011) Standard Test Method for Determining the Tribocharge of Two-Component Developer Materials《测定二组分显影剂材料摩擦电荷的标准试验方法》.pdf ASTM F1425-2006(2011) Standard Test Method for Determining the Tribocharge of Two-Component Developer Materials《测定二组分显影剂材料摩擦电荷的标准试验方法》.pdf
  • ASTM F1426-1994(2003) Standard Practice for Identifying Tire Tread Surface Irregular Wear Patterns Resulting from Tire Use《疲劳使用引起的疲劳外胎表面不规则磨损花纹的鉴别》.pdf ASTM F1426-1994(2003) Standard Practice for Identifying Tire Tread Surface Irregular Wear Patterns Resulting from Tire Use《疲劳使用引起的疲劳外胎表面不规则磨损花纹的鉴别》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1