REG NASA NPD 8081 1-2010 NASA Chemical Rocket Propulsion Testing.pdf

上传人:bonesoil321 文档编号:1017616 上传时间:2019-03-21 格式:PDF 页数:6 大小:103.71KB
下载 相关 举报
REG NASA NPD 8081 1-2010 NASA Chemical Rocket Propulsion Testing.pdf_第1页
第1页 / 共6页
REG NASA NPD 8081 1-2010 NASA Chemical Rocket Propulsion Testing.pdf_第2页
第2页 / 共6页
REG NASA NPD 8081 1-2010 NASA Chemical Rocket Propulsion Testing.pdf_第3页
第3页 / 共6页
REG NASA NPD 8081 1-2010 NASA Chemical Rocket Propulsion Testing.pdf_第4页
第4页 / 共6页
REG NASA NPD 8081 1-2010 NASA Chemical Rocket Propulsion Testing.pdf_第5页
第5页 / 共6页
点击查看更多>>
资源描述

1、 NODIS Library | Program Management(8000s) | Search | NASAPolicyDirective NPD 8081.1Effective Date: February 04,2010Expiration Date: February 04,2015COMPLIANCE IS MANDATORY Printable Format (PDF)(NASA Only) Subject: NASA Chemical Rocket Propulsion TestingResponsible Office: Space Operations Mission

2、 Directorate1. POLICY a. It is NASAs policy to strategically manage the rocket propulsion testing assetslocated at various NASA Centers as an Agency integrated capability portfolio in order tomeet statutory requirements, efficiently and effectively meet current and future technicalrequirements, and

3、reduce unnecessary duplication of capabilities. Therefore, the RocketPropulsion Test (RPT) Program serves as the Agencys propulsion test advocate andprincipal implementing body, both internal and external, for NASAs rocket propulsiontesting management, having programmatic management authority and te

4、chnicalmanagement responsibilities for the Agencys propulsion test capabilities andinfrastructure. b. NASAs policy considers rocket propulsion testing capability a strategicMulti-Directorate and Multi-Program/Project resource. All programs, projects andacquisitions having rocket propulsion testing r

5、equirements, in collaboration with the RPTProgram, shall include an evaluation of the use of NASA propulsion test facilities withintheir official trade studies. c. It is NASAs policy, in order to meet overall Agency goals and commitments andassure compliance with this NPD and lower level documents,

6、that all activities affectingrocket propulsion testing such as capital-asset improvements for test facilitymaintenance, modernizations, and refurbishments, integration for multisite test activities,identification and protection of core capabilities, test assignments, and the advancementand developme

7、nt of test technologies be processed through the RPT Board for review,validation, and approval. The RPT Program Manager will coordinate results from theRPT Board with the cognizant Center Director to create integrated funding, staffing, andfacility modification plans. d. It is NASAs policy to engage

8、 the Department of Defense (DoD) organizations withRequest Notification of ChangeNPD 8081.1 - main Verify Current version before use at:http:/nodis3.gsfc.nasa.gov/ Page 1 of 6 NPD 8081.1 - main Verify Current version before use at:http:/nodis3.gsfc.nasa.gov/ Page 1 of 6 Provided by IHSNot for Resale

9、No reproduction or networking permitted without license from IHS-,-,-similar capability to work together to shape the Governments rocket propulsion testingcapability to efficiently meet national test needs through intra- and interagencycooperation and maintain this capability for the Nation. NASA ha

10、s established theNational Rocket Propulsion Test Alliance (NRPTA) with DoD, as delineated in theNRPTA Memorandum of Understanding (MOU), and will participate in this Allianceaccording to the NRPTA Operating Procedures. 2. APPLICABILITY a. This NPD is applicable to NASA Headquarters and NASA Centers,

11、 includingComponent Facilities and Technical and Service Support Centers. This language appliesto the Jet Propulsion Laboratory, other contractors, grant recipients or parties toagreements only to the extent specified or referenced in the appropriate contracts,grants or agreements, and any revisions

12、 or modifications of said agreements. b. This NPD describes a system in which Center Directors and the RPT Programcooperate to provide responsive, coherent, and affordable rocket propulsion test assetsand services. This NPD applies to all NASA programs, projects, and chemical rocket testfacilities u

13、tilized for certification, developmental or acceptance testing and for engines of1000 pounds of thrust and greater and all test activities performed in those facilities,regardless of thrust level. In addition, by mutual consent of the applicable CenterDirector and the Associate Administrator for Spa

14、ce Operations, smaller facilities andsimilar activities such as structural or dynamics testing may also be included in the RPTProgram. c. This NPD applies to hardware that includes chemical rocket engines that NASA isbuilding or purchasing where NASA or support contractors are the primary designer,o

15、wner, and operator. It is expected that these vehicles will become NASA property andNASA will have primary responsibility and liability. It does not include hardware that ispart of a service that NASA is procuring in which the Agency has minimal involvement inthe design, development, and operations

16、unless owners of this property request to useNASA RPT assets. 3. AUTHORITY a. 42 U.S.C. Sec. 2473 (c) (l), National Aeronautics and Space Act of 1958, as amended.b. NPD 1000.0, Governance and Strategic Management Handbook. c. NPD 1000.3, The NASA Organization w/Change 3 (May 21, 2009). d. NPD 1000.5

17、 Policy for NASA Acquisition. 4. APPLICABLE DOCUMENTS None. 5. RESPONSIBILITY a. The Space Operations Mission Directorate shall: (1) Manage the Agency RPT capability through the RPT Program Office as prescribedNPD 8081.1 - main Verify Current version before use at:http:/nodis3.gsfc.nasa.gov/ Page 2

18、 of 6 NPD 8081.1 - main Verify Current version before use at:http:/nodis3.gsfc.nasa.gov/ Page 2 of 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-by NPD 1000.0, NASA Governance and Strategic Management Handbook, and NPD1000.3, The NASA Organizatio

19、n. (2) Establish an appeals process for RPT Board decisions to the appropriate higher levelAgency Board. b. The RPT Program Office shall: (1) Be the steward for NASA RPT capabilities and facilities and assure that all RPTassets and capabilities identified for sustainment either have validated missio

20、nrequirements or have been identified as potentially required for future missions and,therefore, are sustained for risk mitigation purposes pending mission requirementmaturation. (2) Provide direct support to Agency programs and projects including integration/liaisonto RPT facilities and equipment t

21、o assure the best fit with RPT capabilities and to identifyfuture RPT requirements and resolve capability gaps. Make recommendations regardingthe replacement, modification, or disposition of assets based on NASA and/or nationalneeds. (3) Utilize the RPT Board and processes to oversee, review, evalua

22、te, and approvetrade studies used to facilitate test assignments and capital investments formaintenance, modernizations, and refurbishments to the RPT Center or facility capableof accomplishing the customers test requirements in the best interest of the Agency, or,as appropriate, provide NASAs inter

23、nal customers approval to use non-NASA facilities. (4) Utilize the RPT Board and process to make Rocket Propulsion Test Assignments andapprove alternate uses of assets for which RPT has oversight. (5) Provide short and long-range plans that are consistent with current Agency direction.This will incl

24、ude items such as an inventory/assessment of existing capabilities andconditions (facilities, equipment, and staff), mid to long-term requirements projections,resources, priorities and phasing for capital improvements for maintenance,modernizations, refurbishments, historical test perspective, and r

25、isk assessments. (6) Utilize the NRPTA to conduct DoD facility trade studies, acquire costs estimates, andseek test assignments, as appropriate, to meet NASA customer rocket propulsiontesting needs and statutory requirements. (7) Build the relationship among NASA RPT Centers and with the NRPTA to de

26、velop thearchitecture and standards necessary to enable the Nations RPT infrastructure to beinteroperable and minimize facility duplication. (8) Review and concur, through Agency Acquisition Strategy Meetings, on all Agencyprocurements and acquisitions having RPT requirements. (9) Review, validate,

27、and approve all capital investment resources utilized to maintainand improve RPT infrastructure including support infrastructure for which RPT is aprimary customer. c. NASA Directorates, Agency programs and/or projects, with a requirement for rocketpropulsion testing shall: (1) Coordinate acquisitio

28、n and procurement strategies that have propulsion testrequirements with the RPT Program Office for review and concurrence. NPD 8081.1 - main Verify Current version before use at:http:/nodis3.gsfc.nasa.gov/ Page 3 of 6 NPD 8081.1 - main Verify Current version before use at:http:/nodis3.gsfc.nasa.gov/

29、 Page 3 of 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(2) Request test assignments and approval for investments in Agency RPT facilitiesfrom the RPT Program Office. d. NASA Centers with chemical RPT facilities shall: (1) Coordinate with and ob

30、tain approval from the RPT Program on investments,refurbishments, and modernizations to maintain or upgrade RPT facilities and supportingtest infrastructure. (2) Provide Center-approved cost estimates and proposals to the RPT Program forrocket propulsion test-related activities for evaluation and ac

31、ceptance by the RPT Board. (3) Coordinate Space Act Agreements (SAA) with the RPT Program Office, includingchanges, that utilize RPT rocket-testing facilities or supporting infrastructure to insurethat a test assignment and approved cost and schedule estimates have been approvedprior to final SAA si

32、gnatures. (4) Provide rocket propulsion testing facility and equipment utilization plans andprojections for NASA Programs and reimbursable work. (5) Maintain rocket propulsion testing facilities and infrastructure at readiness andcapability levels mutually agreed upon and approved by the RPT Board.

33、6) Conduct rocket propulsion testing and appraise the RPT Program on statusaccording to RPT processes. (7) Assign Center representative(s) to RPT Program-chartered boards and the NRPTAwith decision authority to make commitments for the Center. 6. DELEGATION OF AUTHORITY None. 7. MEASUREMENTS a. Con

34、sistent with NPR 7120.5, NASA Space Flight Program and Project ManagementRequirements, RPT Program performance measures shall be defined in objective,quantifiable, and measurable terms and documented in the RPT Program Control Plan. b. Compliance with this NPD will be evaluated on a continuing basis

35、 by the SOMDAssistant Associate Administrator for Launch Services, the Program Director or ProgramExecutive, as appropriate, and the responsible Center Directors in coordination with theRPT Program Manager. 8. CANCELLATION None. /s/ Charles F. Bolden, Jr.NPD 8081.1 - main Verify Current version befo

36、re use at:http:/nodis3.gsfc.nasa.gov/ Page 4 of 6 NPD 8081.1 - main Verify Current version before use at:http:/nodis3.gsfc.nasa.gov/ Page 4 of 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ATTACHMENT A: (TEXT) ReferencesA.1 42 U.S.C. S 2473 (c) (

37、l), National Aeronautics and Space Act of 1958, as amended. A.2 NPR 1441.1, NASA Records Retention Schedules. A.3 NPD 7120.4, Program/Project Management. A.4 NPR 7120.5, NASA Space Flight Program and Project Management Requirements. A.5 NPR 8580.1, Implementing the National Environmental Policy Act

38、and ExecutiveOrder 12114. A.6 NPR 8715.1, NASA Occupational Safety and Health Programs. A.7 NPR 8715.3C, NASA General Safety Program Requirements. A.8 NPD 8800.14, Policy for Real Property Management. A.9 NPD 8820.2, Design and Construction of Facilities. A.10 NPR 8820.2, Facility Project Requiremen

39、ts. A.11 NPD 8831.1, Maintenance and Operations of Institutional and Program Facilitiesand Related Equipment (Revalidated June 16, 2008). A.12 NPR 8831.2, Facilities Maintenance and Operations Management. A.13 NRPTA MOU, April 29, 2009. A.14 NRPTA Operating Procedures. A.15 Program Commitment Agreem

40、ent, RPT Program. A.16 RPT Program Plan. A.17 RPTMB Operating Procedures. (URL for Graphic) None.DISTRIBUTION:NODIS This Document Is Uncontrolled When Printed.Check the NASA Online Directives Information System (NODIS) Libraryto Verify that this is the correct version before use: http:/nodis3.gsfc.n

41、asa.govNPD 8081.1 - main Verify Current version before use at:http:/nodis3.gsfc.nasa.gov/ Page 5 of 6 NPD 8081.1 - main Verify Current version before use at:http:/nodis3.gsfc.nasa.gov/ Page 5 of 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NPD 8081.1 - main Verify Current version before use at:http:/nodis3.gsfc.nasa.gov/ Page 6 of 6 NPD 8081.1 - main Verify Current version before use at:http:/nodis3.gsfc.nasa.gov/ Page 6 of 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS ISO 12614-4-2014 Road vehicles Liquefied natural gas (LNG) fuel system components Manual valve《道路车辆 液化天然气 (LNG) 燃料系统部件 手动阀》.pdf BS ISO 12614-4-2014 Road vehicles Liquefied natural gas (LNG) fuel system components Manual valve《道路车辆 液化天然气 (LNG) 燃料系统部件 手动阀》.pdf
  • BS ISO 12614-5-2014 Road vehicles Liquefied natural gas (LNG) fuel system components Tank pressure gauge《道路车辆 液化天然气 (LNG) 燃料系统部件 罐压计》.pdf BS ISO 12614-5-2014 Road vehicles Liquefied natural gas (LNG) fuel system components Tank pressure gauge《道路车辆 液化天然气 (LNG) 燃料系统部件 罐压计》.pdf
  • BS ISO 12614-6-2014 Road vehicles Liquefied natural gas (LNG) fuel system components Pressure regulator《道路车辆 液化天然气 (LNG) 燃料系统部件 压力调节器》.pdf BS ISO 12614-6-2014 Road vehicles Liquefied natural gas (LNG) fuel system components Pressure regulator《道路车辆 液化天然气 (LNG) 燃料系统部件 压力调节器》.pdf
  • BS ISO 12614-7-2014 Road vehicles Liquefied natural gas (LNG) fuel system components Pressure relief valve《道路车辆 液化天然气 (LNG) 燃料系统部件 泄压阀》.pdf BS ISO 12614-7-2014 Road vehicles Liquefied natural gas (LNG) fuel system components Pressure relief valve《道路车辆 液化天然气 (LNG) 燃料系统部件 泄压阀》.pdf
  • BS ISO 12614-8-2014 Road vehicles Liquefied natural gas (LNG) fuel system components Excess flow valve《道路车辆 液化天然气 (LNG) 燃料系统部件 溢流阀》.pdf BS ISO 12614-8-2014 Road vehicles Liquefied natural gas (LNG) fuel system components Excess flow valve《道路车辆 液化天然气 (LNG) 燃料系统部件 溢流阀》.pdf
  • BS ISO 12614-9-2014 Road vehicles Liquefied natural gas (LNG) fuel system components Gas-tight housing and ventilation hose《道路车辆 液化天然气 (LNG) 燃料系统部件 气密罩和通风软管》.pdf BS ISO 12614-9-2014 Road vehicles Liquefied natural gas (LNG) fuel system components Gas-tight housing and ventilation hose《道路车辆 液化天然气 (LNG) 燃料系统部件 气密罩和通风软管》.pdf
  • BS ISO 12615-2004 Bibliographic references and source identifiers for terminology work《术语工作用参考文献和源标识符》.pdf BS ISO 12615-2004 Bibliographic references and source identifiers for terminology work《术语工作用参考文献和源标识符》.pdf
  • BS ISO 12616-2002 Translation-oriented terminography《与翻译相关的术语》.pdf BS ISO 12616-2002 Translation-oriented terminography《与翻译相关的术语》.pdf
  • BS ISO 12617-2015 Road vehicles Liquefied natural gas (LNG) refueling connector 3 1 MPa connector《道路车辆 液化天然气 (LNG) 再加连接器 3 1 MPa连接器》.pdf BS ISO 12617-2015 Road vehicles Liquefied natural gas (LNG) refueling connector 3 1 MPa connector《道路车辆 液化天然气 (LNG) 再加连接器 3 1 MPa连接器》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1