REG NASA-LLIS-0119-1992 Lessons Learned - Solid Rocket Motor (SRM) Segment and Handling Ring Mating.pdf

上传人:dealItalian200 文档编号:1017773 上传时间:2019-03-21 格式:PDF 页数:2 大小:12.82KB
下载 相关 举报
REG NASA-LLIS-0119-1992 Lessons Learned - Solid Rocket Motor (SRM) Segment and Handling Ring Mating.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-0119-1992 Lessons Learned - Solid Rocket Motor (SRM) Segment and Handling Ring Mating.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 0119Lesson Info:a71 Lesson Number: 0119a71 Lesson Date: 1992-08-10a71 Submitting Organization: KSCa71 Submitted by: Lisa L. MusgraveSubject: Solid Rocket Motor (SRM) Segment and Handling Ring Mating Description of Driving Event: On September 25, 1987, The solid rocket motor (S

2、RM) aft segment was being mated to the aft segment handling ring in the H77-0386 stand. The SRM segment and handling ring assembly was hoisted from the stand and moved to the breakover beam. The handling ring was mated to the breakover beam and the SRM segment was tilted to the horizontal position a

3、nd placed on the rail car. At this time it was noticed that a total of six bolts were missing from the SRM end-ring assembly. It is unknown when or who removed the bolts.Lesson(s) Learned: 1. Documentation lacking cross references between serial numbers and model numbers may result in inadequate con

4、figuration or missing hardware.2. Improper work authorization contributed to the unauthorized removal of six attachment bolts from the SRM aft segment lifting bracket.Recommendation(s): 1. Implement documentation to allow work to be traced to hardware serial numbers and personnel performing the task

5、2. Revise documentation to include hardware inspections and to correct discrepencies for all transportation support equipment transferred.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Evidence of Recurrence Control Effectiveness: N/ADocuments Rela

6、ted to Lesson: N/AMission Directorate(s): a71 Space Operationsa71 Exploration SystemsAdditional Key Phrase(s): a71 Configuration Managementa71 Ground Operationsa71 Packaging Handling StorageAdditional Info: Approval Info: a71 Approval Date: 1994-06-02a71 Approval Name: James G. Klinea71 Approval Organization: KSC/HEIa71 Approval Phone Number: 407-867-7614Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • API RP 14E-1991 Recommended Practice for Design and Installation of Offshore Production Platform Piping Systems (FIFTH EDITION)《海上生产平台管线设计、安装(ANSI API RP 14E -1992》.pdf API RP 14E-1991 Recommended Practice for Design and Installation of Offshore Production Platform Piping Systems (FIFTH EDITION)《海上生产平台管线设计、安装(ANSI API RP 14E -1992》.pdf
  • API RP 14FZ-2013 Recommended Practice for Design and Installation of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class I Zone 0 Zon.pdf API RP 14FZ-2013 Recommended Practice for Design and Installation of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class I Zone 0 Zon.pdf
  • API RP 1615-2011 Installation of Underground Petroleum Storage Systems (Sixth Edition)《地下石油存储系统的安装.第6版》.pdf API RP 1615-2011 Installation of Underground Petroleum Storage Systems (Sixth Edition)《地下石油存储系统的安装.第6版》.pdf
  • API RP 16Q-1993 Recommended Practice for Design Selection Operation and Maintenance of Marine Drilling Riser Systems (FIRST EDITION FORMERLY RP 2Q AND RP 2K)《海洋钻井隔水管系统的设计、选择、操作及维修..pdf API RP 16Q-1993 Recommended Practice for Design Selection Operation and Maintenance of Marine Drilling Riser Systems (FIRST EDITION FORMERLY RP 2Q AND RP 2K)《海洋钻井隔水管系统的设计、选择、操作及维修..pdf
  • API RP 16ST-2009 Coiled Tubing Well Control Equipment Systems (First Edition)《卷绕管充分控制设备系统.第1版》.pdf API RP 16ST-2009 Coiled Tubing Well Control Equipment Systems (First Edition)《卷绕管充分控制设备系统.第1版》.pdf
  • API RP 17A-2006 Design and Operation of Subsea Production Systems - General Requirements and Recommendations (Fourth Edition ISO 13628-1 2005 Adoption)《水下采油系统设计和操作的推荐作法.第4版.ISO 136.pdf API RP 17A-2006 Design and Operation of Subsea Production Systems - General Requirements and Recommendations (Fourth Edition ISO 13628-1 2005 Adoption)《水下采油系统设计和操作的推荐作法.第4版.ISO 136.pdf
  • API RP 17B-2014 Recommended Practice for Flexible Pipe (FIFTH EDITION) .pdf API RP 17B-2014 Recommended Practice for Flexible Pipe (FIFTH EDITION) .pdf
  • API RP 17G-2006 Recommended Practice for Completion Workover Risers (Second Edition)《完井 修井立管系统设计和操作的推荐作法.第2版.勘误 2005年》.pdf API RP 17G-2006 Recommended Practice for Completion Workover Risers (Second Edition)《完井 修井立管系统设计和操作的推荐作法.第2版.勘误 2005年》.pdf
  • API RP 17H-2013 Remotely Operated Vehicle Interfaces on Subsea Production Systems (SECOND EDITION Incorporates Errata January 2014)《水下生产系统的遥控操作装置(ROV)接口》.pdf API RP 17H-2013 Remotely Operated Vehicle Interfaces on Subsea Production Systems (SECOND EDITION Incorporates Errata January 2014)《水下生产系统的遥控操作装置(ROV)接口》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1