1、Lessons Learned Entry: 0216Lesson Info:a71 Lesson Number: 0216a71 Lesson Date: 1993-06-15a71 Submitting Organization: LERCa71 Submitted by: S. PapellSubject: Altitude Tanks Vacuum Pumps Description of Driving Event: Before starting up vacuum pumps to lower the pressure in an altitude tank, the reser

2、voirs of the pumps were checked for proper oil level. The levels were found to be low and about 5 to 7 gallons of oil were added to the reservoirs of each pump. The pumps were then turned on to start pumping against their isolation valves. When the valves were opened to the tank to allow high gas fl

3、ow to the pump inlet, oil was discharged through the vent system to the roof of the building. Because of the pressure build up, an elbow in the vent line separated and spilled oil on the pump room roof and the parking lot next to the building.The investigating committee determined that a false readi

4、ng was obtained when the oil levels of the pumps were checked prior to starting them up. The missing oil was in the inlet cavities of the pumps and not in the reservoirs where the oil level is measured. When the pumps were started, the excess oil was forced from the inlet cavities to the pump reserv

5、oirs, thereby overfilling them.Lesson(s) Learned: Excessive oil consumption by vacuum pumps should be evaluated as a problem prior to adding oil to prevent overfilling the pump reservoirs.Recommendation(s): Check oil level in vacuum pumps only after the pumps are pulled through or run to assure that

6、 all oil is in the reserviors and not in the inlet cavity.Evidence of Recurrence Control Effectiveness: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Hardwa

7、rea71 Logisticsa71 Test FacilityAdditional Info: Approval Info: a71 Approval Date: 1994-04-19a71 Approval Name: Maria Havenhilla71 Approval Organization: LERC/EBASa71 Approval Phone Number: 216-977-1483Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DIN 25420-2 Bb 1-1989 Construction of concrete hot cells requirements of processing and storage cells examples of performance《混凝土热室的建造 加工室和贮藏库的要求 第2 Bb 1部分 性能示例》.pdf DIN 25420-2 Bb 1-1989 Construction of concrete hot cells requirements of processing and storage cells examples of performance《混凝土热室的建造 加工室和贮藏库的要求 第2 Bb 1部分 性能示例》.pdf
  • DIN 25420-2-2014 Construction of concrete hot cells - Part 2 Requirements for processing and storage cells《混凝土热室的建造 对操作室和储存室的要求》.pdf DIN 25420-2-2014 Construction of concrete hot cells - Part 2 Requirements for processing and storage cells《混凝土热室的建造 对操作室和储存室的要求》.pdf
  • DIN 25420-3 Bb 1-2014 Construction of concrete hot cells - Part 3 Requirements for shielding windows for concrete walls with different densities Supplement 1 Installation guideline.pdf DIN 25420-3 Bb 1-2014 Construction of concrete hot cells - Part 3 Requirements for shielding windows for concrete walls with different densities Supplement 1 Installation guideline.pdf
  • DIN 25420-3-2015 Construction of concrete hot cells - Part 3 Requirements of shielding windows for concrete walls with different densities《混凝土热室的建造 第3部分 对于不同密度混凝土墙上辐射防护窗的要求》.pdf DIN 25420-3-2015 Construction of concrete hot cells - Part 3 Requirements of shielding windows for concrete walls with different densities《混凝土热室的建造 第3部分 对于不同密度混凝土墙上辐射防护窗的要求》.pdf
  • DIN 25420-4-2015 Construction of concrete hot cells - Part 4 Requirements of shielding windows for concrete walls density 2 3 g cm3 with different thicknesses《混凝土热室的建造 第4部分 对密度为2 3.pdf DIN 25420-4-2015 Construction of concrete hot cells - Part 4 Requirements of shielding windows for concrete walls density 2 3 g cm3 with different thicknesses《混凝土热室的建造 第4部分 对密度为2 3.pdf
  • DIN 25422-2013 Storage and keeping of radioactive materials - Requirements on protection against radiation fire and theft to be met by storage facilities《放射性材料的存储和保管 存储设施能满足的防辐射、防火.pdf DIN 25422-2013 Storage and keeping of radioactive materials - Requirements on protection against radiation fire and theft to be met by storage facilities《放射性材料的存储和保管 存储设施能满足的防辐射、防火.pdf
  • DIN 25424-1-1981 Fault tree analysis Method and graphical symbols《失效树分析 方法和图形符号》.pdf DIN 25424-1-1981 Fault tree analysis Method and graphical symbols《失效树分析 方法和图形符号》.pdf
  • DIN 25424-2-1990 Fault tree analysis manual calculation procedures for the evaluation of a fault tree《故障树分析 评价故障树的手算方法》.pdf DIN 25424-2-1990 Fault tree analysis manual calculation procedures for the evaluation of a fault tree《故障树分析 评价故障树的手算方法》.pdf
  • DIN 25425-1 Bb 1-2016 Radioisotope laboratories - Part 1 Rules for design Supplement 1 Examples for application《放射性同位元素实验室 第1部分 设计规则 补充件1 应用实例》.pdf DIN 25425-1 Bb 1-2016 Radioisotope laboratories - Part 1 Rules for design Supplement 1 Examples for application《放射性同位元素实验室 第1部分 设计规则 补充件1 应用实例》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1