1、Lessons Learned Entry: 0257Lesson Info:a71 Lesson Number: 0257a71 Lesson Date: 1994-01-20a71 Submitting Organization: LERCa71 Submitted by: S. PapellSubject: JP-4 Fuel Leak Description of Driving Event: Operations personnel, in an engine test facility, reported that JP-4 fuel was found leaking in th

2、e basement of the building. Emergency staff responding to the call discovered that the fuel had originated from the engine on the main floor and had leaked onto a power panel in the basement. The spill was located on and around a 480VAC motor control center that contained breakers and contactors to

3、power the pumps, blowers, and fans in the building.The building was evacuated due to a potential explosion hazard. The power was turned off and power to the control center terminated. Absorbent pads were placed around the fuel spill for containment and the area barricaded to prevent access.It was de

4、termined that the fuel spill originated from an open fuel return low point drain valve, recently added to the facility, that was not put on the facility drawings. Operations personnel performing a walk-through inspection of the facility did not observe the added drain and therefore were not aware of

5、 the presence and open valve position of the drain.Lesson(s) Learned: 1. Modifications made to plumbing systems of fuel tanks that are inadvertently left off the facility drawings can lead to unsafe engine operation.2. Fuel system low-point drains should not be placed in close proximity to, or above

6、 critical operating systems.Recommendation(s): 1. Correct facility drawings when modifications are made and notify line management Provided by IHSNot for Resale-,-,-responsible for the facility.2. Design facilities so that fuel drain lines and valves are not in a position to dump fuel on operating

7、electrical equipment.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Configuration Managementa71 Energetic Materials - Explosive/Propellant/Pyrotechnica71 Facilitiesa71 Hazardous/Toxic Waste/MaterialsAdditional Info: Approval Info: a71 Approval Date: 1994-06-15a71 Approval Name: Maria Havenhilla71 Approval Organization: LERC/EBASa71 Approval Phone Number: 216-977-1483Provided by IHSNot for Resale-,-,-

展开阅读全文
相关资源
猜你喜欢
  • NBN-EN 177-1992 1250 Dust-pressed ceramic tiles with a water absorption of 3% E 6% (Group Blla)《具有吸水率3 % E 6%的干压陶瓷砖(Blla组)》.pdf NBN-EN 177-1992 1250 Dust-pressed ceramic tiles with a water absorption of 3% E 6% (Group Blla)《具有吸水率3 % E 6%的干压陶瓷砖(Blla组)》.pdf
  • NBN-EN 178-1992 5000 Dust-pressed ceramic tiles with a water absorption of 6% E 10% (Group Bllb)《具有吸水率6 % E 10%的干压陶瓷砖(Bllb组)》.pdf NBN-EN 178-1992 5000 Dust-pressed ceramic tiles with a water absorption of 6% E 10% (Group Bllb)《具有吸水率6 % E 10%的干压陶瓷砖(Bllb组)》.pdf
  • NBN-EN 186-1-1992 6250 Ceramic tiles - Extruded ceramic tiles with a water absorption of 3 %  E 6% (Group Alia) - Part 1《瓷砖 具有吸水率3% E 6%的挤压成型的瓷砖(Alia组)第1部分》.pdf NBN-EN 186-1-1992 6250 Ceramic tiles - Extruded ceramic tiles with a water absorption of 3 % E 6% (Group Alia) - Part 1《瓷砖 具有吸水率3% E 6%的挤压成型的瓷砖(Alia组)第1部分》.pdf
  • NBN-EN 186-2-1992 6250 Ceramic tiles - Extruded ceramic tiles with a water absorption of 3 %  E 6 % (Group Alia) - Part 2《瓷砖 具有吸水率3% E 6%的挤压成型的瓷砖(Alia组)第2部分》.pdf NBN-EN 186-2-1992 6250 Ceramic tiles - Extruded ceramic tiles with a water absorption of 3 % E 6 % (Group Alia) - Part 2《瓷砖 具有吸水率3% E 6%的挤压成型的瓷砖(Alia组)第2部分》.pdf
  • NBN-EN 187-1-1992 6250 Ceramic tiles - Extruded ceramic tiles with a water absorption of 6 %  E  10 % (Group Allb) - Part 1《瓷砖 具有吸水率6% E 10%的挤压成型的瓷砖(Allb组)第1部分》.pdf NBN-EN 187-1-1992 6250 Ceramic tiles - Extruded ceramic tiles with a water absorption of 6 % E 10 % (Group Allb) - Part 1《瓷砖 具有吸水率6% E 10%的挤压成型的瓷砖(Allb组)第1部分》.pdf
  • NBN-EN 187-2-1992 7500 Ceramic tiles - Extruded ceramic tiles with a water absorption of 6 %  E 10 % (Group Allb) - Part 2《瓷砖 具有吸水率6 % E 10%的挤压成型的瓷砖(Allb组) 第2部分》.pdf NBN-EN 187-2-1992 7500 Ceramic tiles - Extruded ceramic tiles with a water absorption of 6 % E 10 % (Group Allb) - Part 2《瓷砖 具有吸水率6 % E 10%的挤压成型的瓷砖(Allb组) 第2部分》.pdf
  • NBN-EN 188-1992 0625 Ceramic tiles - Extruded ceramic tiles with a water absorption of E  10 % (Group Alll)《瓷砖 具有吸水率E 10%的挤压成型的瓷砖(Alll组)》.pdf NBN-EN 188-1992 0625 Ceramic tiles - Extruded ceramic tiles with a water absorption of E 10 % (Group Alll)《瓷砖 具有吸水率E 10%的挤压成型的瓷砖(Alll组)》.pdf
  • NBN-EN 19-1993 4375 Marking of general purpose industrial valves《通用工业阀门的标识》.pdf NBN-EN 19-1993 4375 Marking of general purpose industrial valves《通用工业阀门的标识》.pdf
  • NBN-EN 196-1-1991 1875 Methods of testing cement - Determination of strength《水泥试验方法 强度的测定》.pdf NBN-EN 196-1-1991 1875 Methods of testing cement - Determination of strength《水泥试验方法 强度的测定》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1