1、Lessons Learned Entry: 0261Lesson Info:a71 Lesson Number: 0261a71 Lesson Date: 1994-01-20a71 Submitting Organization: LERCa71 Submitted by: S. PapellSubject: Working Under Suspended Loads Description of Driving Event: Occupational Safety and Health Administration (OSHA) requirements prohibit having
2、personnel work under suspended loads. Payload processing facilities will be implementing measures to assure strict compliance with OSHA requirements. It is recommended that these requirements be incorporated into present or future operational plans/designs of lifting and hoisting equipment to avoid
3、costly delays, redesign or modifications to operations.Lesson(s) Learned: When processing flight payloads, designs for lifting and hoisting equipment must follow strict procedures to avoid costly delays to operations.Recommendation(s): Design hoisting operations according to OSHA requirements that p
4、rohibit having personnel working under suspended loads.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHSMission Directorate(s): N/AAdditional Key Phrase(s): a71 Lifting DevicesAdditional Info: Approval Info: a71 Approval Date: 1994-06-15a71 Approval Name: Maria Havenhilla71 Approval Organization: LERC/EBASa71 Approval Phone Number: 216-977-1483Provided by IHSNot for Resale-,-,-