REG NASA-LLIS-0304--1993 Lessons Learned SIR-C Low Noise Amplifier Recovery Time too Long.pdf

上传人:吴艺期 文档编号:1017951 上传时间:2019-03-21 格式:PDF 页数:2 大小:12.88KB
下载 相关 举报
REG NASA-LLIS-0304--1993 Lessons Learned SIR-C Low Noise Amplifier Recovery Time too Long.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-0304--1993 Lessons Learned SIR-C Low Noise Amplifier Recovery Time too Long.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 0304Lesson Info:a71 Lesson Number: 0304a71 Lesson Date: 1993-09-15a71 Submitting Organization: JPLa71 Submitted by: A. G. GussnerSubject: SIR-C Low Noise Amplifier Recovery Time too Long Abstract: Excessive Low Noise Amplifier (LNA) recovery time had not been detected because

2、testing had been done in transmit-only or receive-only modes. Hardware should be functionally end-to-end tested. Early module level functional tests should be performed to detect RF timing/leakage issues.Description of Driving Event: When the C-Band pulse from the transmitter was present in the ante

3、nna panel, the Low Noise Amplifier (LNA) in the receive chain had a long recovery time of up to 200 microseconds. The transmit/receive module of the antenna received transmit pulse leakage into the LNA which shifted the operating bias and caused the long recovery time before the LNA was enabled. All

4、 previous testing of the panel had been done in transmit-only or receive-only modes. Correction of the problem required extensive rework of the panels. Covers, harnesses, and printed wiring boards were removed to gain access to the transmit/receive modules. Then two resistors were replaced and five

5、capacitors were removed from each of twenty-eight modules in each of the nineteen panels.Additional Keyword(s): RF Performance VerificationReference(s): PFR #56187Lesson(s) Learned: Hardware should be functionally end-to-end tested.Recommendation(s): Provided by IHSNot for ResaleNo reproduction or n

6、etworking permitted without license from IHS-,-,-1. End-to-end system tests to simulate actual use must be performed as early as possible in the test sequence.2. Early module level functional tests should be performed to detect RF timing/leakage issues.Evidence of Recurrence Control Effectiveness: N

7、/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Test & VerificationAdditional Info: Approval Info: a71 Approval Date: 1993-09-02a71 Approval Name: Carol Dumaina71 Approval Organization: 125-204a71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ASTM B440-2012 Standard Specification for Cadmium 《金属镉标准规格》.pdf ASTM B440-2012 Standard Specification for Cadmium 《金属镉标准规格》.pdf
  • ASTM B440-2012(2017) Standard Specification for Cadmium《镉的标准规格》.pdf ASTM B440-2012(2017) Standard Specification for Cadmium《镉的标准规格》.pdf
  • ASTM B441-2004 Standard Specification for Copper-Cobalt-Beryllium Copper-Nickel-Beryllium and Copper-Nickel-Lead-Beryllium Rod and Bar (UNS Nos C17500 C17510 and C17465)《铜钴铍、铜镍铍和铜镍.pdf ASTM B441-2004 Standard Specification for Copper-Cobalt-Beryllium Copper-Nickel-Beryllium and Copper-Nickel-Lead-Beryllium Rod and Bar (UNS Nos C17500 C17510 and C17465)《铜钴铍、铜镍铍和铜镍.pdf
  • ASTM B441-2004(2010) Standard Specification for Copper-Cobalt-Beryllium Copper-Nickel-Beryllium and Copper-Nickel-Lead-Beryllium Rod and Bar (UNS Nos C17500 C17510 and C17465)《铜钴铍、.pdf ASTM B441-2004(2010) Standard Specification for Copper-Cobalt-Beryllium Copper-Nickel-Beryllium and Copper-Nickel-Lead-Beryllium Rod and Bar (UNS Nos C17500 C17510 and C17465)《铜钴铍、.pdf
  • ASTM B441-2016 Standard Specification for Copper-Cobalt-Beryllium Copper-Nickel-Beryllium and Copper-Nickel-Lead-Beryllium Rod and Bar (UNS Nos C17500 C17510 and C17465)《铜钴铍 铜镍铍 以及.pdf ASTM B441-2016 Standard Specification for Copper-Cobalt-Beryllium Copper-Nickel-Beryllium and Copper-Nickel-Lead-Beryllium Rod and Bar (UNS Nos C17500 C17510 and C17465)《铜钴铍 铜镍铍 以及.pdf
  • ASTM B443-2000(2005) Standard Specification for Nickel-Chromium-Molybdenum-Columbium Alloy (UNS N06625) and Nickel-Chromium-Molybdenum-Silicon Alloy (UNS N06219) Plate Sheet and St.pdf ASTM B443-2000(2005) Standard Specification for Nickel-Chromium-Molybdenum-Columbium Alloy (UNS N06625) and Nickel-Chromium-Molybdenum-Silicon Alloy (UNS N06219) Plate Sheet and St.pdf
  • ASTM B443-2000(2009) Standard Specification for Nickel-Chromium-Molybdenum-Columbium Alloy (UNS N06625) and Nickel-Chromium-Molybdenum-Silicon Alloy (UNS N06219) Plate Sheet and St.pdf ASTM B443-2000(2009) Standard Specification for Nickel-Chromium-Molybdenum-Columbium Alloy (UNS N06625) and Nickel-Chromium-Molybdenum-Silicon Alloy (UNS N06219) Plate Sheet and St.pdf
  • ASTM B443-2000(2014) Standard Specification for Nickel-Chromium-Molybdenum-Columbium Alloy&40 UNS N06625&41 and Nickel-Chromium-Molybdenum-SiliconAlloy &40 UNS N06219&41 Plate Shee.pdf ASTM B443-2000(2014) Standard Specification for Nickel-Chromium-Molybdenum-Columbium Alloy&40 UNS N06625&41 and Nickel-Chromium-Molybdenum-SiliconAlloy &40 UNS N06219&41 Plate Shee.pdf
  • ASTM B444-2006 Standard Specification for Nickel-Chromium-Molybdenum-Columbium Alloys (UNS N06625 and UNS N06852) and Nickel-Chromium-Molybdenum-Silicon Alloy (UNS N06219) Pipe and.pdf ASTM B444-2006 Standard Specification for Nickel-Chromium-Molybdenum-Columbium Alloys (UNS N06625 and UNS N06852) and Nickel-Chromium-Molybdenum-Silicon Alloy (UNS N06219) Pipe and.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1