REG NASA-LLIS-0318-1993 Lessons Learned - Mission Assignment of Experiments Which are in a Very Early Stage of Development (Concept Stage or Preliminary Requirements Stage).pdf

上传人:刘芸 文档编号:1017965 上传时间:2019-03-21 格式:PDF 页数:2 大小:12.76KB
下载 相关 举报
REG NASA-LLIS-0318-1993 Lessons Learned - Mission Assignment of Experiments Which are in a Very Early Stage of Development (Concept Stage or Preliminary Requirements Stage).pdf_第1页
第1页 / 共2页
REG NASA-LLIS-0318-1993 Lessons Learned - Mission Assignment of Experiments Which are in a Very Early Stage of Development (Concept Stage or Preliminary Requirements Stage).pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 0318Lesson Info:a71 Lesson Number: 0318a71 Lesson Date: 1993-05-24a71 Submitting Organization: MSFCa71 Submitted by: Little, RobertSubject: Mission Assignment of Experiments Which are in a Very Early Stage of Development (Concept Stage or Preliminary Requirements Stage) Descri

2、ption of Driving Event: From the inception of SL-3 until the flight, the experiment complement changed three or four times. These changes occurred during Payload integration and each time required the integration process to start over. This resulted in considerable manpower/money waste.Lesson(s) Lea

3、rned: Flight assignment of experiments without appropriate development maturity often results in severe impacts to the experiment and the integrated payload.Recommendation(s): Assignment of an experiment to a mission which is about to enter the payload analytical integration phase should be avoided

4、if the experiment has not reached as a minimum, the following milestones: 1) Experiment has completed the preliminary requirements review, including general requirements for integration, and is approaching the preliminary design review. 2) Funding for the completion of experiment development and man

5、ufacture has been committed. 3) The experiment schedule for preliminary design review, critical design review, and software review realistically supports the integrated payload reviews. That is, the experiment reviews should lead the ipl reviews by at least six months.Evidence of Recurrence Control

6、Effectiveness: Collective wisdom.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Documents Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Payloadsa71 Policy & PlanningAdditional Info: Approval Info: a71 Approval Date: 1994-08-17a71 Approval Name: Little, Roberta71 Approval Organization: ED02a71 Approval Phone Number: 205-544-2273Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-