1、Lessons Learned Entry: 0569Lesson Info:a71 Lesson Number: 0569a71 Lesson Date: 1997-10-09a71 Submitting Organization: JPLa71 Submitted by: D. OberhettingerSubject: Interface Control and Verification Abstract: Problems occurred during Mars Pathfinder spacecraft integration and test due to out-of-date

2、 or incomplete interface documentation. The problem of communicating design details and changes across interfaces is a common industry problem.Employ a dedicated ICD engineer, ensure proper notification of interface changes, and avoid maintaining separate in-house and vendor ICDs. Description of Dri

3、ving Event: The Mars Pathfinder (MPF) project operated under cost and schedule constraints. It employed new approaches for interface definition and control which produced both good and bad results.a71 In simplifying the expensive serial engineering change request (ECR) process, a dedicated JPL inter

4、face control drawing (ICD) coordinator was responsible for change control and for assuring that interface changes were approved by cognizant engineers. In addition, the Project Engineering Team met weekly to review all changes.Problems occurred during MPF spacecraft integration and test, however, du

5、e to out-of-date or incomplete interface documentation: a71 Electrical connector discrepancies were found between the MPF main wiring harness (delivered in July 1995) and 7 connectors on circuit boards in the Attitude and Information Management (AIM) subsystem. Investigation showed that the main wir

6、ing harness was built in accordance with MICDs which had not been updated after interfacing circuit board connectors were changed. This resulted in a connector mismatch-non-mating male-to-male Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-and femal

7、e-to-female connections. No power subsystem cabling was involved, and the discrepancies were corrected by retrofitting the cabling, or in some cases the boards, before any damage had occurred.a71 For some hardware items, it was discovered that JPL and vendors had each prepared MICDs independently.Ad

8、ditional Keyword(s): Electrical Interface Control Drawing (EICD), Mechanical Interface Control Drawing (MICD)Reference(s):a71 Muirhead, B., Mars Pathfinder Lessons Learned Presentations, April 17, 1997.a71 Mars Pathfinder Problem Log, IR 043306.a71 Mars Pathfinder ATLO Data Packagea71 JPL Common Thr

9、eads Workshop Summary Report, JPL D-13776, May 31, 1996.Lesson(s) Learned: 1. The problem of communicating design details and changes across interfaces-mechanical, electrical, and informational-is a pervasive common thread across JPL projects and throughout industry.2. Assignment of full responsibil

10、ity for interface control coordination to a single engineer, in conjunction with weekly Project Engineering Team reviews, results in an acceptable and cost effective engineering change control process.3. Mechanical Interface Control Drawings (MICDs) at all levels require periodic verification of acc

11、uracy and compatability, especially prior to any hardware fabrication.Recommendation(s): 1. Employ a dedicated engineer to assure that the hardware being built matches the ICDs.2. Ensure that cognizant engineers verify consistancy between their hardware and the MICDs/ assembly drawings, and provide

12、proper notification of interface changes.3. Use vendor ICDs where applicable, but do not maintain two sets.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Mission Direct

13、orate(s): N/AAdditional Key Phrase(s): N/AAdditional Info: Approval Info: a71 Approval Date: 1997-10-16a71 Approval Name: Carol Dumaina71 Approval Organization: 125-204a71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • EN 14265-2003 en Derivatives from coal pyrolysis Coal tar and pitch based binders and related products painting tar Characteristics and test methods《煤热解衍生物 煤焦油和沥青基粘结剂和相关产品 喷漆焦油 特性和.pdf EN 14265-2003 en Derivatives from coal pyrolysis Coal tar and pitch based binders and related products painting tar Characteristics and test methods《煤热解衍生物 煤焦油和沥青基粘结剂和相关产品 喷漆焦油 特性和.pdf
  • EN 14266-2003 en Derivatives from coal pyrolysis - Coal tar and pitch based binders and related products  coating tar - Characteristics and test methods《煤高温分解的衍生物 煤焦油和沥青基胶粘剂及相关产品 涂.pdf EN 14266-2003 en Derivatives from coal pyrolysis - Coal tar and pitch based binders and related products coating tar - Characteristics and test methods《煤高温分解的衍生物 煤焦油和沥青基胶粘剂及相关产品 涂.pdf
  • EN 14267-2004 en Irrigation techniques - Irrigation hydrants (Incorporating corrigendum October 2008)《灌溉技术 灌溉给水栓 合并勘误表-2008年10月》.pdf EN 14267-2004 en Irrigation techniques - Irrigation hydrants (Incorporating corrigendum October 2008)《灌溉技术 灌溉给水栓 合并勘误表-2008年10月》.pdf
  • EN 14268-2005 en Irrigation techniques - Meters for irrigation water《灌溉技术 灌溉水测量设备》.pdf EN 14268-2005 en Irrigation techniques - Meters for irrigation water《灌溉技术 灌溉水测量设备》.pdf
  • EN 14272-2011 en Plywood - Calculation method for some mechanical properties《胶合板 一些力学性能计算方法》.pdf EN 14272-2011 en Plywood - Calculation method for some mechanical properties《胶合板 一些力学性能计算方法》.pdf
  • EN 14276-1-2006 en Pressure equipment for refrigerating systems and heat pumps - Part 1 Vessels - General requirements (Incorporates Amendment A1 2011)《制冷系统和热泵用压力设备 第1部分 压力容器 一般要求》.pdf EN 14276-1-2006 en Pressure equipment for refrigerating systems and heat pumps - Part 1 Vessels - General requirements (Incorporates Amendment A1 2011)《制冷系统和热泵用压力设备 第1部分 压力容器 一般要求》.pdf
  • EN 14276-2-2007 en Pressure equipment for refrigerating systems and heat pumps - Part 2 Piping - General requirements (Incorporates Amendment A1 2011)《制冷系统和热泵用压力设备 第2部分 管道 一般要求》.pdf EN 14276-2-2007 en Pressure equipment for refrigerating systems and heat pumps - Part 2 Piping - General requirements (Incorporates Amendment A1 2011)《制冷系统和热泵用压力设备 第2部分 管道 一般要求》.pdf
  • EN 14277-2006 en Ventilation for buildings - Air terminal devices - Method for airflow measurement by calibrated sensors in or close to ATD plenum boxes《建筑物通风 空气终端装置 通过在或接近ATD 充气箱的.pdf EN 14277-2006 en Ventilation for buildings - Air terminal devices - Method for airflow measurement by calibrated sensors in or close to ATD plenum boxes《建筑物通风 空气终端装置 通过在或接近ATD 充气箱的.pdf
  • EN 14278-1-2004 en Textiles - Determination of cotton fibre stickiness - Part 1 Method using a manual thermodetection device《纺织品 棉纤维黏性的测定 第1部分 使用手工热检测设备的方法》.pdf EN 14278-1-2004 en Textiles - Determination of cotton fibre stickiness - Part 1 Method using a manual thermodetection device《纺织品 棉纤维黏性的测定 第1部分 使用手工热检测设备的方法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1