REG NASA-LLIS-0611-1999 Lessons Learned Evaluate Launch Vehicle and Services Requirements (1997).pdf

上传人:花仙子 文档编号:1018258 上传时间:2019-03-21 格式:PDF 页数:3 大小:14.58KB
下载 相关 举报
REG NASA-LLIS-0611-1999 Lessons Learned Evaluate Launch Vehicle and Services Requirements (1997).pdf_第1页
第1页 / 共3页
REG NASA-LLIS-0611-1999 Lessons Learned Evaluate Launch Vehicle and Services Requirements (1997).pdf_第2页
第2页 / 共3页
REG NASA-LLIS-0611-1999 Lessons Learned Evaluate Launch Vehicle and Services Requirements (1997).pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 0611Lesson Info:a71 Lesson Number: 0611a71 Lesson Date: 1999-02-19a71 Submitting Organization: JPLa71 Submitted by: R. Baisley/L. Shaw Jr./D. OberhettingerSubject: Evaluate Launch Vehicle and Services Requirements (1997) Abstract: Careful planning for the acquisition of launch

2、 services and interface definition and control is an important success factor for cost and schedule constrained flight projects. Tailor the launch services contract to meet project-specific needs, and consider other elements that historically accompany this type contract, prior to finalizing the agr

3、eement. Make minimal or no changes to the basic launch vehicle after the spacecraft interfaces with the launch vehicle have been established.Description of Driving Event: Careful planning for the acquisition of launch services and interface definition and control is an important success factor for c

4、ost and schedule constrained flight projects:1. Launch service contract stipulations are sometimes retained in a subsequent contract without adequate consideration of their suitability to the applicable flight project. “Unnecessary baggage“ is a likely consequence of a rush to arrange flight service

5、s. In contracting for launch services, the Cassini project accepted the launch service contractors standard arrangement. This contract retained launch service contractor responsibility for total launch vehicle/space vehicle (LV/SV) compatibility and performance. The level of contractor involvement w

6、ith the spacecraft side of the interface, with an absence of clear decision making authority, was perceived to result in a duplication of effort, negatively influencing project morale. Independently, NASA subsequently directed JPL flight project offices to lead all efforts to ensure mission success.

7、 2. Once the launch services contract is finalized, changes that affect the hardware configuration will likely result in increased program costs. For example, Cassini launch safety analyses Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-indicated th

8、e need for changes to LV/SV hardware and interfaces.Additional Keyword(s): Configuration Management, Configuration Control, Mechanical Interface, Control Drawing, MICD, Spacecraft IntegrationReference(s): Cassini Spacecraft Assembly, Test, and Launch Operations (ATLO) Final Report, Volume I, JPL Doc

9、ument D-15701, May 15, 1998, pages 153-4.Lesson(s) Learned: 1. Determine the need for all elements that historically accompany a launch services contract prior to finalizing the agreement. Tailor the launch services contract to meet project-specific needs.2. Make minimal or no changes to the basic l

10、aunch vehicle after the spacecraft interfaces with the launch vehicle have been established. Early analyses and identification of unique requirements may preclude significant cost growth.Recommendation(s): See lesson(s) learnedEvidence of Recurrence Control Effectiveness: N/ADocuments Related to Les

11、son: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Configuration Managementa71 Launch Vehiclea71 Procurement Small Business & Industrial Relationsa71 SpacecraftAdditional Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Info: a71 Approval Date: 1999-03-01a71 Approval Name: Carol Dumaina71 Approval Organization: 125-204a71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ASHRAE OR-05-1-1-2005 Design of Air-Cooled R-410A Microchannel Condensers《冷风的R-410A微尺度冷凝器设计》.pdf ASHRAE OR-05-1-1-2005 Design of Air-Cooled R-410A Microchannel Condensers《冷风的R-410A微尺度冷凝器设计》.pdf
  • ASHRAE OR-05-1-2-2005 Air-Side Thermal-Hlydraulic Performance of Louvered-Fin Flat-Tube Heat Exchangers with Sequential Frost-Growth Cycles《百叶窗翅式 扁管式换热器与顺序冰点增长周期的空气 侧热 水力学的表现》.pdf ASHRAE OR-05-1-2-2005 Air-Side Thermal-Hlydraulic Performance of Louvered-Fin Flat-Tube Heat Exchangers with Sequential Frost-Growth Cycles《百叶窗翅式 扁管式换热器与顺序冰点增长周期的空气 侧热 水力学的表现》.pdf
  • ASHRAE OR-05-1-3-2005 Impact of Fouling and Cleaning onn Plate Fin and Spine Fin Heat Exchangers Performance《污垢及清洗onn板翅式和脊椎翅式换热器性能的影响》.pdf ASHRAE OR-05-1-3-2005 Impact of Fouling and Cleaning onn Plate Fin and Spine Fin Heat Exchangers Performance《污垢及清洗onn板翅式和脊椎翅式换热器性能的影响》.pdf
  • ASHRAE OR-05-10-1-2005 Brazed Plate Heat Exchangers and Their Applications《钎焊板式换热器及其应用》.pdf ASHRAE OR-05-10-1-2005 Brazed Plate Heat Exchangers and Their Applications《钎焊板式换热器及其应用》.pdf
  • ASHRAE OR-05-10-2-2005 Thermal and Hydraulic Characteristics of Brazed Plate Heat Exchangers - Part I Review of Single-Phase and Two-Phase Adiabatic and Flow Boiling Characteristic.pdf ASHRAE OR-05-10-2-2005 Thermal and Hydraulic Characteristics of Brazed Plate Heat Exchangers - Part I Review of Single-Phase and Two-Phase Adiabatic and Flow Boiling Characteristic.pdf
  • ASHRAE OR-05-10-2005 Symposium on Advances in Brazed-Plate Heat Exchangers for HVAC&R Applications《在HVAC和R应用上的钎焊板式换热器的进步的研讨会》.pdf ASHRAE OR-05-10-2005 Symposium on Advances in Brazed-Plate Heat Exchangers for HVAC&R Applications《在HVAC和R应用上的钎焊板式换热器的进步的研讨会》.pdf
  • ASHRAE OR-05-10-3-2005 Thermal and Hydraulic Characteristics of Brazed Plate Heat Exchangers - Part II Current Research on Evaporators at KTH《钎焊板式换热器的热和水力特性-第2部分 目前的研究对蒸发器在KTH》.pdf ASHRAE OR-05-10-3-2005 Thermal and Hydraulic Characteristics of Brazed Plate Heat Exchangers - Part II Current Research on Evaporators at KTH《钎焊板式换热器的热和水力特性-第2部分 目前的研究对蒸发器在KTH》.pdf
  • ASHRAE OR-05-10-4-2005 CFD Simulation of Heat Transfer in Compact Brazed Plate Heat Exchangers《紧凑型钎焊板式换热器传热的CFD模拟》.pdf ASHRAE OR-05-10-4-2005 CFD Simulation of Heat Transfer in Compact Brazed Plate Heat Exchangers《紧凑型钎焊板式换热器传热的CFD模拟》.pdf
  • ASHRAE OR-05-11-1-2005 Cost-Effective Design of Duel Heat and Energy Recovery Exchangers for 100% Ventalation Air in HVAC Cabinet Units《完全通风HVAC内阁单位的热量和能量回收交换机的 成本效益的设计》.pdf ASHRAE OR-05-11-1-2005 Cost-Effective Design of Duel Heat and Energy Recovery Exchangers for 100% Ventalation Air in HVAC Cabinet Units《完全通风HVAC内阁单位的热量和能量回收交换机的 成本效益的设计》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1