1、Lessons Learned Entry: 0994Lesson Info:a71 Lesson Number: 0994a71 Lesson Date: 2001-01-01a71 Submitting Organization: MSFCa71 Submitted by: Charles ChesserSubject: Respiratory problems from the laying up of fiberglass operation Description of Driving Event: Employees inhaled small fiberglass fibers
2、from not using the vacuum system which was available and lack of adequate safety procedures.Lesson(s) Learned: Prior to conducting an operation which could generate particles, perform a particle count assessment to assure adequate ventilation/vacuum and filtering of air breathed. Also, train personn
3、el in the proper use of all facility safety devices prior to commencing the operation.Recommendation(s): Make assessments of all hazardous operations and adequately train personnel before conducting any hazardous operation. Minimize the exposure to airborne particles whenever possible.Evidence of Re
4、currence Control Effectiveness: None available; the operation was stopped and dismantled due to termination of the PROJECT.Documents Related to Lesson: N/AMission Directorate(s): Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-N/AAdditional Key Phras
5、e(s): a71 Facilitiesa71 Ground Operationsa71 Hazardous/Toxic Waste/Materialsa71 Independent Verification and Validationa71 Industrial Operationsa71 Occupational Healtha71 Personal Protective Equipmenta71 Safety & Mission Assurancea71 Training EquipmentAdditional Info: Approval Info: a71 Approval Date: 2001-10-23a71 Approval Name: Lisa Hedigera71 Approval Organization: MSFCa71 Approval Phone Number: 256-544-2544Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-