REG NASA-LLIS-1011--1997 Lessons Learned - Space Shuttle Program SFOC Contract Logistics Functions Transition.pdf

上传人:unhappyhay135 文档编号:1018656 上传时间:2019-03-21 格式:PDF 页数:2 大小:12.80KB
下载 相关 举报
REG NASA-LLIS-1011--1997 Lessons Learned - Space Shuttle Program SFOC Contract Logistics Functions Transition.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-1011--1997 Lessons Learned - Space Shuttle Program SFOC Contract Logistics Functions Transition.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1011Lesson Info:a71 Lesson Number: 1011a71 Lesson Date: 1997-02-01a71 Submitting Organization: HQa71 Submitted by: David M. LengyelSubject: Space Shuttle Program/SFOC Contract/Logistics Functions Transition Description of Driving Event: Transition to USA Management of Logistic

2、s Functions Under Phase 1 of the SFOC ContractLesson(s) Learned: Transition of logistics functions under Phase 1 of the Space Flight Operations Contract (SFOC) appears to be taking place smoothly. Key personnel are maintaining continuity in management techniques and processes.Recommendation(s): Cont

3、inue adherence to established systems, and make maximum use of the inherent capability of the incumbent personnel in the logistics systems.Evidence of Recurrence Control Effectiveness: NASA concurs. The established NASA Logistics Operations continues to monitor the established logistics systems and

4、enhance others in order to maintain insight into the logistics activity. Both the SFOC contractor and NASA Logistics Organization have retained incumbent key personnel with critical logistics skills to minimize the transitional risks and continue to support the SSP. Currently, the SFOC contractor is

5、 studying the horizontal consolidation of like functions and processes. NASA Logistics Operations will monitor the contractors progress to assure that the logistics systems resulting from this consolidation will be capable, effective, efficient, and, above all, not adversely impacting the safety of

6、operations.Documents Related to Lesson: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-N/AMission Directorate(s): a71 Space Operationsa71 Exploration SystemsAdditional Key Phrase(s): a71 Administration/Organizationa71 Aerospace Safety Advisory Panela71 Ground Operationsa71 LogisticsAdditional Info: Approval Info: a71 Approval Date: 2001-11-20a71 Approval Name: Bill Loewya71 Approval Organization: QSa71 Approval Phone Number: 202-358-0528Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1