REG NASA-LLIS-1138--2000 Lessons Learned Space Shuttle Program Facilities Test Equipment and Ground Support Equipment (GSE) Supportability.pdf

上传人:wealthynice100 文档编号:1018777 上传时间:2019-03-21 格式:PDF 页数:2 大小:13.31KB
下载 相关 举报
REG NASA-LLIS-1138--2000 Lessons Learned Space Shuttle Program Facilities Test Equipment and Ground Support Equipment (GSE) Supportability.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-1138--2000 Lessons Learned Space Shuttle Program Facilities Test Equipment and Ground Support Equipment (GSE) Supportability.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1138Lesson Info:a71 Lesson Number: 1138a71 Lesson Date: 2000-02-01a71 Submitting Organization: HQa71 Submitted by: David M. LengyelSubject: Space Shuttle Program/Facilities, Test Equipment, and Ground Support Equipment (GSE)/Supportability Description of Driving Event: Lack of

2、 Systematic Plan to Counter Obsolescence of Shuttle Facilities, Test Equipment, and Ground Support Equipment (GSE)Lesson(s) Learned: There is no systematic plan to counter obsolescence and assure the availability of adequate facilities, GSE, and specialized test-and-checkout equipment throughout the

3、 expected lifetime of the Space Shuttle.Recommendation(s): There is no systematic plan to counter obsolescence and assure the availability of adequate facilities, GSE, and specialized test-and-checkout equipment throughout the expected lifetime of the Space Shuttle.Evidence of Recurrence Control Eff

4、ectiveness: NASA concurs with the ASAP recommendation. A specific focus on SSP infrastructure has been established for FY 2000, identifying issues and concerns throughout the program. The SSP initiated an effort in November 1999 to develop a plan and identify the requirements and resource levels req

5、uired to address the infrastructure backlog and supportability needs for the SSP through FY 2012. This effort has incorporated all SSP elements and support functions at Office of Space Flight Centers and the Dryden Flight Research Center. The completed plan will define infrastructure project funding

6、 requirements for vital components that support or directly impact the SSP. The plan spans Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-across multiple years and will address the SSP short-term as well as long-range needs. Supporting SSP element i

7、nfrastructure long-range assessments/plans have been completed or are in the process of completion. Two examples of SSP element supporting efforts are the Ground Systems Survivability Assessment, which addresses obsolescence by providing a component level assessment of requirements to maintain or im

8、prove existing capabilities, and the External Tank Projects 15-year plan. The completion of the Infrastructure Plan is a major Space Shuttle initiative whose results will be included in the Program Operating Plan strategy. The SSP has assigned a lead at KSC to formulate the SSP infrastructures upgra

9、des requirements.Documents Related to Lesson: N/AMission Directorate(s): a71 Space Operationsa71 Exploration SystemsAdditional Key Phrase(s): a71 Aerospace Safety Advisory Panela71 Configuration Managementa71 Facilitiesa71 Ground Equipmenta71 Logisticsa71 Parts Materials & Processesa71 Policy & Planninga71 Spacecrafta71 Test FacilityAdditional Info: Approval Info: a71 Approval Date: 2002-02-25a71 Approval Name: Bill Loewya71 Approval Organization: HQa71 Approval Phone Number: 202-358-0528Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-