REG NASA-LLIS-1218-2002 Lessons Learned Substantial Benefits to Projects from the Use of a Blanket Purchase Agreement for Procurement.pdf

上传人:hopesteam270 文档编号:1018857 上传时间:2019-03-21 格式:PDF 页数:3 大小:14.82KB
下载 相关 举报
REG NASA-LLIS-1218-2002 Lessons Learned Substantial Benefits to Projects from the Use of a Blanket Purchase Agreement for Procurement.pdf_第1页
第1页 / 共3页
REG NASA-LLIS-1218-2002 Lessons Learned Substantial Benefits to Projects from the Use of a Blanket Purchase Agreement for Procurement.pdf_第2页
第2页 / 共3页
REG NASA-LLIS-1218-2002 Lessons Learned Substantial Benefits to Projects from the Use of a Blanket Purchase Agreement for Procurement.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1218Lesson Info:a71 Lesson Number: 1218a71 Lesson Date: 2002-06-17a71 Submitting Organization: KSCa71 Submitted by: Paul MoganSubject: Substantial Benefits to Projects from the Use of a Blanket Purchase Agreement for Procurement Description of Driving Event: A project required

2、 purchase of an indefinite quantity of hardware spread over several years. The hardware was procured for this project using a modified Blanket Purchase Agreement (BPA) which resulted in cost savings to the project, simplified procurement and good service from the vendor. In addition, the BPA set pri

3、ces for the hardware at the beginning of the contract and having this information allowed better planning for material purchases.Lesson(s) Learned: Investigation into procurement sources for the hardware to be purchased revealed that it was on GSA Schedule. Working with NASA procurement our project

4、was able to get a modified BPA in place that gave us: 1. Prices discounted below GSA Schedule prices2. An Indefinite Delivery date/Indefinite Quantity (IDIQ) contract which did not commit NASA to buying any particular amount at any particular time but fixed prices and delivery terms up front.3. Not

5、Separately Priced (NSP) services from the vendor that made them a valuable team player. Examples of NSP services include 3 site visits by knowledgeable engineers employed by the vendor after each purchase to resolve technical issues with purchased hardware; a spreadsheet maintained by the vendor lis

6、ting part number, serial number and warranty data for all items delivered; guaranteed delivery dates for purchased items; and paper and CD ROM copies of all specifications, databooks, users guides, engineering notes and so forth.All of these services were provided “free“, but their cost was included

7、 in the price of hardware Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-purchase. Another benefit of this contract is that all of the paperwork is done up front. After the initial order is made against the contract, subsequent orders require very m

8、inimal paperwork. In fact, after the first order is made using a standard NASA Purchase Request form, subsequent orders can be done using a simple electronic form sent directly to the procurement office. This resulted in a substantial benefit to the project and a good working relationship with the v

9、endor supplying the products. In addition, this kind of contract could be set up to support logistics after a system becomes operational. Recommendation(s): All projects requiring procurement of more than just a few items should have extensive discussions with NASA Procurement and look for innovativ

10、e ways to procure the things they need. The type of purchase agreement discussed here is one example of the benefits to be found when procurement methods are tailored specifically to the project at hand. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directo

11、rate(s): a71 Exploration Systemsa71 Sciencea71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Configuration Managementa71 Ground Equipmenta71 Hardwarea71 Logisticsa71 Parts Materials & ProcessesProvided by IHSNot for ResaleNo reproduction or networking permitted without licens

12、e from IHS-,-,-a71 Procurement Small Business & Industrial Relationsa71 Research & DevelopmentAdditional Info: Approval Info: a71 Approval Date: 2002-06-27a71 Approval Name: Gena Bakera71 Approval Organization: KSCa71 Approval Phone Number: 321-867-4261Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • GMW GMW16535-2011 Metallurgical and Mechanical Properties of Wheel Bolts and Studs Issue 1 English《轮毂螺栓和螺柱的冶金和机械性能 第1次出版(英文版本)》.pdf GMW GMW16535-2011 Metallurgical and Mechanical Properties of Wheel Bolts and Studs Issue 1 English《轮毂螺栓和螺柱的冶金和机械性能 第1次出版(英文版本)》.pdf
  • GMW GMW16536-2011 Pumpable Sealer Between Flanges of Welded Structures - Steel Acceptance Criteria and Repair Procedures Issue 1 English《焊接结构凸缘之间可泵送的密封层 钢验收标准和维修程序 第1次出版(英文版本)》.pdf GMW GMW16536-2011 Pumpable Sealer Between Flanges of Welded Structures - Steel Acceptance Criteria and Repair Procedures Issue 1 English《焊接结构凸缘之间可泵送的密封层 钢验收标准和维修程序 第1次出版(英文版本)》.pdf
  • GMW GMW16537-2012 Metal Bonding Structural Adhesive Acceptance Criteria and Repair Procedures - Welded Bonded Rivet Bonded and Bonded Structures Issue 2 English《焊接粘合 铆钉粘合和粘合结构的金属粘合.pdf GMW GMW16537-2012 Metal Bonding Structural Adhesive Acceptance Criteria and Repair Procedures - Welded Bonded Rivet Bonded and Bonded Structures Issue 2 English《焊接粘合 铆钉粘合和粘合结构的金属粘合.pdf
  • GMW GMW16546-2011 Effect of Metal Lubricants on Paint Pretreatment Issue 1 English《金属润滑剂对涂料预处理的影响 第1次出版(英文版本)》.pdf GMW GMW16546-2011 Effect of Metal Lubricants on Paint Pretreatment Issue 1 English《金属润滑剂对涂料预处理的影响 第1次出版(英文版本)》.pdf
  • GMW GMW16551-2013 Metric Screw Threads Issue 2 English.pdf GMW GMW16551-2013 Metric Screw Threads Issue 2 English.pdf
  • GMW GMW16554-2011 2K Urethane Monocoat for Chrome-Plate Issue 1 English [Replaced GMNA 9984305 GMNA 9984305 GMNA 9984305 GMNA GM9056P GMNA GM9056P]《铬涂层的2K尿烷单涂层 第1次出版(英文版本)[代替 GMNA .pdf GMW GMW16554-2011 2K Urethane Monocoat for Chrome-Plate Issue 1 English [Replaced GMNA 9984305 GMNA 9984305 GMNA 9984305 GMNA GM9056P GMNA GM9056P]《铬涂层的2K尿烷单涂层 第1次出版(英文版本)[代替 GMNA .pdf
  • GMW GMW16557-2011 PA66+PPE (Polyamide 66 + Polyphenylene Ether) - Heat Stabilized Conductive Issue 1 English《热稳定且导电的PA66+PPE(聚酰胺66和聚亚苯基) 第1次出版(英文版本)》.pdf GMW GMW16557-2011 PA66+PPE (Polyamide 66 + Polyphenylene Ether) - Heat Stabilized Conductive Issue 1 English《热稳定且导电的PA66+PPE(聚酰胺66和聚亚苯基) 第1次出版(英文版本)》.pdf
  • GMW GMW16558-2011 Polyamide 66 - Heat Stabilized Impact Modified UV Stabilized Issue 1 English《热稳定 冲击改良且紫外线稳定的聚酰胺66 第1次出版(英文版本)》.pdf GMW GMW16558-2011 Polyamide 66 - Heat Stabilized Impact Modified UV Stabilized Issue 1 English《热稳定 冲击改良且紫外线稳定的聚酰胺66 第1次出版(英文版本)》.pdf
  • GMW GMW16562-2011 30% Glass Fiber Reinforced Liquid Molded Composite Issue 1 English《30%玻璃纤维加强的液体模塑材料 第1次出版(英文版本)》.pdf GMW GMW16562-2011 30% Glass Fiber Reinforced Liquid Molded Composite Issue 1 English《30%玻璃纤维加强的液体模塑材料 第1次出版(英文版本)》.pdf