REG NASA-LLIS-1240-2002 Lessons Learned - International Space Station Command& Data Handling System Stability and Control Methods.pdf

上传人:testyield361 文档编号:1018879 上传时间:2019-03-21 格式:PDF 页数:2 大小:13.07KB
下载 相关 举报
REG NASA-LLIS-1240-2002 Lessons Learned - International Space Station Command& Data Handling System Stability and Control Methods.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-1240-2002 Lessons Learned - International Space Station Command& Data Handling System Stability and Control Methods.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1240Lesson Info:a71 Lesson Number: 1240a71 Lesson Date: 2002-06-17a71 Submitting Organization: HQa71 Submitted by: David LengyelSubject: International Space Station/Command & Data Handling/System Stability and Control Methods Description of Driving Event: International Space S

2、tation Command & Control Computer crashes due to common cause failure mode.Lesson(s) Learned: The Command & Data Handling System (C&DH) system is vulnerable to instability under heavy load conditions. This problem is currently handled by procedurally controlling processing activities.Recommendation(

3、s): Process outstanding Problem Reports (PRs). Evaluate potential architectures that would improve system stability and robustness and ensure safe operations. Implement architecture improvements as soon as it is prudent to do so. Evidence of Recurrence Control Effectiveness: Believe this has already

4、 been accomplished as part of the standard design and development activities. Believe this has already been accomplished as part of the standard design and development activities. Due to the large amount of ISS SW code being developed and in use, there is an imposing amount of Problem Report traffic

5、 The backlog varies based on the amount of testing in progress at any one time. Considerable emphasis is being placed on reduction of the backlog and a dedicated team has been instituted as a part of the I&O contract to focus solely on PR resolution. Results to date indicate that even though the to

6、tal backlog varies up and down relative to current activities, the average age of the open PRs is decreasing. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Preliminary work has already been done to identify improvement areas. As Pre-Planned Product

7、 Improvement funding becomes available, we will move forward to implement any appropriate enhancements. Documents Related to Lesson: N/AMission Directorate(s): a71 Space Operationsa71 Exploration SystemsAdditional Key Phrase(s): a71 Aerospace Safety Advisory Panela71 Computersa71 Configuration Manag

8、ementa71 Flight Operationsa71 Research & Developmenta71 SoftwareAdditional Info: Approval Info: a71 Approval Date: 2002-06-27a71 Approval Name: Bill Loewya71 Approval Organization: HQa71 Approval Phone Number: 202-358-0528Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • KS B ISO 18431-2-2013 Mechanical vibration and shock-Signal processing-Part 2:Time domain windows for Fourier Transform analysis《机械振动和冲击 信号处理 第2部分 傅里叶变换分析用时域窗》.pdf KS B ISO 18431-2-2013 Mechanical vibration and shock-Signal processing-Part 2:Time domain windows for Fourier Transform analysis《机械振动和冲击 信号处理 第2部分 傅里叶变换分析用时域窗》.pdf
  • KS B ISO 18595-2008 Resistance welding-Spot welding of aluminium and aluminium alloys-Weldability welding and testing《电阻焊接 铝和铝合金的点焊 可焊接性、焊接和测试》.pdf KS B ISO 18595-2008 Resistance welding-Spot welding of aluminium and aluminium alloys-Weldability welding and testing《电阻焊接 铝和铝合金的点焊 可焊接性、焊接和测试》.pdf
  • KS B ISO 18629-1-2007 Industrial automation systems and integration-Process specification language-Part 1:Overview and basic principles《工业自动化系统和集成 工艺规范语言 第1部分 总览和基本原则》.pdf KS B ISO 18629-1-2007 Industrial automation systems and integration-Process specification language-Part 1:Overview and basic principles《工业自动化系统和集成 工艺规范语言 第1部分 总览和基本原则》.pdf
  • KS B ISO 18650-1-2011 Building construction machinery and equipment-Concrete mixers-Part 1:Vocabulary and general specifications《建筑施工机械和设备 混凝土搅拌机 第1部分 词汇和一般规范》.pdf KS B ISO 18650-1-2011 Building construction machinery and equipment-Concrete mixers-Part 1:Vocabulary and general specifications《建筑施工机械和设备 混凝土搅拌机 第1部分 词汇和一般规范》.pdf
  • KS B ISO 18650-2-2008 Building construction machinery and equipment-Concrete mixers-Part 2:Procedure for examination of mixing efficiency《建筑施工机械和设备 混凝土搅拌机 第2部分 搅拌功效检查程序》.pdf KS B ISO 18650-2-2008 Building construction machinery and equipment-Concrete mixers-Part 2:Procedure for examination of mixing efficiency《建筑施工机械和设备 混凝土搅拌机 第2部分 搅拌功效检查程序》.pdf
  • KS B ISO 18652-2011 Building construction machinery and equipment-External vibrators for concrete《房屋建筑机械和设备 混凝土用外部振捣器》.pdf KS B ISO 18652-2011 Building construction machinery and equipment-External vibrators for concrete《房屋建筑机械和设备 混凝土用外部振捣器》.pdf
  • KS B ISO 19452-2012 Building construction machinery and equipment-Pedestrian-controlled vibratory(percussion) rammers-Terminology and commercial specifications《建筑施工机械和设备 步行式震动(撞击)打.pdf KS B ISO 19452-2012 Building construction machinery and equipment-Pedestrian-controlled vibratory(percussion) rammers-Terminology and commercial specifications《建筑施工机械和设备 步行式震动(撞击)打.pdf
  • KS B ISO 20019-2007 Agricultural vehicles-Mechanical connections on towed vehicles-Dimensions for hitch rings《农业车辆 被牵引车辆的机械连接装置 挂接环尺寸》.pdf KS B ISO 20019-2007 Agricultural vehicles-Mechanical connections on towed vehicles-Dimensions for hitch rings《农业车辆 被牵引车辆的机械连接装置 挂接环尺寸》.pdf
  • KS B ISO 20421-2-2006 Cryogenic vessels-Large transportable vacuum-insulated vessels-Part 2:Operational requirements《低温容器 大型可移动真空隔热容器 第2部分 操作要求》.pdf KS B ISO 20421-2-2006 Cryogenic vessels-Large transportable vacuum-insulated vessels-Part 2:Operational requirements《低温容器 大型可移动真空隔热容器 第2部分 操作要求》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1