REG NASA-LLIS-1289-2002 Lessons Learned Managing Human Resources in Projects Where Each Individual is Multi-tasked Frequently Required to Work Overtime is One-deep in Skills and Spty C.pdf

上传人:fatcommittee260 文档编号:1018928 上传时间:2019-03-21 格式:PDF 页数:3 大小:14.46KB
下载 相关 举报
REG NASA-LLIS-1289-2002 Lessons Learned Managing Human Resources in Projects Where Each Individual is Multi-tasked Frequently Required to Work Overtime is One-deep in Skills and Spty C.pdf_第1页
第1页 / 共3页
REG NASA-LLIS-1289-2002 Lessons Learned Managing Human Resources in Projects Where Each Individual is Multi-tasked Frequently Required to Work Overtime is One-deep in Skills and Spty C.pdf_第2页
第2页 / 共3页
REG NASA-LLIS-1289-2002 Lessons Learned Managing Human Resources in Projects Where Each Individual is Multi-tasked Frequently Required to Work Overtime is One-deep in Skills and Spty C.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1289Lesson Info:a71 Lesson Number: 1289a71 Lesson Date: 2002-01-01a71 Submitting Organization: ARCa71 Submitted by: DR Mendoza/ M. SumichSubject: Managing Human Resources in Projects Where Each Individual is Multi-tasked, Frequently Required to Work Overtime, is One-deep in Sk

2、ills and Specialization, and is Required to Have a Security Clearance Description of Driving Event: The project had three significant challenges with respect to managing human resources, and the potential loss of any project member was a significant risk. First, the project was classified and used a

3、 small, select, and collocated team. When a project member left or transferred to other work, the delay in bringing in someone new could be significant and cause both a delay in schedule and overload on other team members. Second, the project was developing two identical flight vehicles, which split

4、 some project resources into teams dedicated to each vehicle. However, many of the project personnel were specialists devoted to both vehicles. The bulk of the schedule was sequential to make effective and efficient use of these people. However, at times parallel efforts were taking place that stret

5、ched certain project people to their limit. Third, once the first flight vehicle was completed, it was shipped to a distant location for flight, which further split the project personnel. The result was that many members devoted to one vehicle could not assist in the efforts of completing the other

6、vehicle. Lesson(s) Learned: When a project team is only “one deep“ in a highly structured, time driven and classified effort, the loss of a single key team member can cause significant delays and/or overburden the available workforce. Cross training can reduce the impact of this loss until the vacan

7、cy can be filled with an experienced replacement or a new team member can be trained.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Recommendation(s): Projects that have personnel “one deep“ in special knowledge areas that have to assume multiple ta

8、sk loads should have a plan that ensures the following:a71 cross traininga71 mentoringa71 pre-identified pool of specialists with appropriate security backgroundsa71 sequential and/or parallel product development schedules that allow the work force to concentrate their attention based on riska71 ade

9、quate budget for overtime Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Administration/Organizationa71 Human Resources & Educationa71

10、 Risk Management/AssessmentAdditional Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Info: a71 Approval Date: 2002-10-10a71 Approval Name: Anthony Bricenoa71 Approval Organization: ARCa71 Approval Phone Number: 650-604-1012Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS 7211-2012 Electric cables Thermosetting insulated and thermoplastic sheathed cables for voltages up to and including 450 750 V for electric power and lighting and having low emi.pdf BS 7211-2012 Electric cables Thermosetting insulated and thermoplastic sheathed cables for voltages up to and including 450 750 V for electric power and lighting and having low emi.pdf
  • BS 7212-2016 Code of practice for the safe use of construction hoists《施工起重机的安全使用实施规则》.pdf BS 7212-2016 Code of practice for the safe use of construction hoists《施工起重机的安全使用实施规则》.pdf
  • BS 7216-1989 Classification and interpretation of new lighting products《新照明产品的分类和说明》.pdf BS 7216-1989 Classification and interpretation of new lighting products《新照明产品的分类和说明》.pdf
  • BS 7221-1989 Open systems interconnection specification for internal organization of the Network Layer《开放式系统互连 网络层内部机构规范》.pdf BS 7221-1989 Open systems interconnection specification for internal organization of the Network Layer《开放式系统互连 网络层内部机构规范》.pdf
  • BS 7227-1990 Procedures for the application of ISO 7812 to allocate UK Issuer Identification Numbers (UK IINs) for use on identification cards《应用ISO 7812为身份证卡使用分配英国颁发机构的身份证号程序》.pdf BS 7227-1990 Procedures for the application of ISO 7812 to allocate UK Issuer Identification Numbers (UK IINs) for use on identification cards《应用ISO 7812为身份证卡使用分配英国颁发机构的身份证号程序》.pdf
  • BS 7231-1-1990 Body measurements of boys and girls from birth up to 16 9 years - Information in the form of tables《从出生至16 9岁以下男孩和女孩的身体测量 第1部分 表格式资料》.pdf BS 7231-1-1990 Body measurements of boys and girls from birth up to 16 9 years - Information in the form of tables《从出生至16 9岁以下男孩和女孩的身体测量 第1部分 表格式资料》.pdf
  • BS 7231-2-1990 Body measurements of boys and girls from birth up to 16 9 years - Recommendations of body dimensions for children《从出生至16 9岁以下男孩和女孩的身体测量 第2部分 儿童身体尺寸推荐标准》.pdf BS 7231-2-1990 Body measurements of boys and girls from birth up to 16 9 years - Recommendations of body dimensions for children《从出生至16 9岁以下男孩和女孩的身体测量 第2部分 儿童身体尺寸推荐标准》.pdf
  • BS 7237-1990 Specification for binary floating point arithmetic for microprocessor systems《微处理器系统二进制浮点算法规范》.pdf BS 7237-1990 Specification for binary floating point arithmetic for microprocessor systems《微处理器系统二进制浮点算法规范》.pdf
  • BS 7238-1990 Glossary for terminology related to microprocessors《有关微处理器的术语词汇》.pdf BS 7238-1990 Glossary for terminology related to microprocessors《有关微处理器的术语词汇》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1