REG NASA-LLIS-1289-2002 Lessons Learned Managing Human Resources in Projects Where Each Individual is Multi-tasked Frequently Required to Work Overtime is One-deep in Skills and Spty C.pdf

上传人:fatcommittee260 文档编号:1018928 上传时间:2019-03-21 格式:PDF 页数:3 大小:14.46KB
下载 相关 举报
REG NASA-LLIS-1289-2002 Lessons Learned Managing Human Resources in Projects Where Each Individual is Multi-tasked Frequently Required to Work Overtime is One-deep in Skills and Spty C.pdf_第1页
第1页 / 共3页
REG NASA-LLIS-1289-2002 Lessons Learned Managing Human Resources in Projects Where Each Individual is Multi-tasked Frequently Required to Work Overtime is One-deep in Skills and Spty C.pdf_第2页
第2页 / 共3页
REG NASA-LLIS-1289-2002 Lessons Learned Managing Human Resources in Projects Where Each Individual is Multi-tasked Frequently Required to Work Overtime is One-deep in Skills and Spty C.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1289Lesson Info:a71 Lesson Number: 1289a71 Lesson Date: 2002-01-01a71 Submitting Organization: ARCa71 Submitted by: DR Mendoza/ M. SumichSubject: Managing Human Resources in Projects Where Each Individual is Multi-tasked, Frequently Required to Work Overtime, is One-deep in Sk

2、ills and Specialization, and is Required to Have a Security Clearance Description of Driving Event: The project had three significant challenges with respect to managing human resources, and the potential loss of any project member was a significant risk. First, the project was classified and used a

3、 small, select, and collocated team. When a project member left or transferred to other work, the delay in bringing in someone new could be significant and cause both a delay in schedule and overload on other team members. Second, the project was developing two identical flight vehicles, which split

4、 some project resources into teams dedicated to each vehicle. However, many of the project personnel were specialists devoted to both vehicles. The bulk of the schedule was sequential to make effective and efficient use of these people. However, at times parallel efforts were taking place that stret

5、ched certain project people to their limit. Third, once the first flight vehicle was completed, it was shipped to a distant location for flight, which further split the project personnel. The result was that many members devoted to one vehicle could not assist in the efforts of completing the other

6、vehicle. Lesson(s) Learned: When a project team is only “one deep“ in a highly structured, time driven and classified effort, the loss of a single key team member can cause significant delays and/or overburden the available workforce. Cross training can reduce the impact of this loss until the vacan

7、cy can be filled with an experienced replacement or a new team member can be trained.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Recommendation(s): Projects that have personnel “one deep“ in special knowledge areas that have to assume multiple ta

8、sk loads should have a plan that ensures the following:a71 cross traininga71 mentoringa71 pre-identified pool of specialists with appropriate security backgroundsa71 sequential and/or parallel product development schedules that allow the work force to concentrate their attention based on riska71 ade

9、quate budget for overtime Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 Administration/Organizationa71 Human Resources & Educationa71

10、 Risk Management/AssessmentAdditional Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Info: a71 Approval Date: 2002-10-10a71 Approval Name: Anthony Bricenoa71 Approval Organization: ARCa71 Approval Phone Number: 650-604-1012Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • EN 12697-16-2016 en Bituminous mixtures - Test methods - Part 16 Abrasion by studded tyres《沥青混合物-试验方法-第16部分 防滑钉胎的磨损》.pdf EN 12697-16-2016 en Bituminous mixtures - Test methods - Part 16 Abrasion by studded tyres《沥青混合物-试验方法-第16部分 防滑钉胎的磨损》.pdf
  • EN 12697-17-2004 2651 Bituminous mixtures Test methods for hot mix asphalt Part 17 Particle loss of porous asphalt specimen (Incorporates Amendment A1 2007)《沥青混合料 热混沥青的试验方法 第17部分 多.pdf EN 12697-17-2004 2651 Bituminous mixtures Test methods for hot mix asphalt Part 17 Particle loss of porous asphalt specimen (Incorporates Amendment A1 2007)《沥青混合料 热混沥青的试验方法 第17部分 多.pdf
  • EN 12697-17-2017 en Bituminous mixtures - Test methods - Part 17 Particle loss of porous asphalt specimens《沥青混合物-试验方法-第17部分 多孔沥青试样的颗粒损失》.pdf EN 12697-17-2017 en Bituminous mixtures - Test methods - Part 17 Particle loss of porous asphalt specimens《沥青混合物-试验方法-第17部分 多孔沥青试样的颗粒损失》.pdf
  • EN 12697-18-2004 en Bituminous mixtures - Test methods for hot mix asphalt - Part 18 Binder drainage《沥青混合物 热混合沥青的试验方法 第18部分 粘合剂排水》.pdf EN 12697-18-2004 en Bituminous mixtures - Test methods for hot mix asphalt - Part 18 Binder drainage《沥青混合物 热混合沥青的试验方法 第18部分 粘合剂排水》.pdf
  • EN 12697-18-2017 en Bituminous mixtures - Test methods - Part 18 Binder drainage.pdf EN 12697-18-2017 en Bituminous mixtures - Test methods - Part 18 Binder drainage.pdf
  • EN 12697-19-2004 en Bituminous mixtures - Test methods for hot mix asphalt - Part 19 Permeability of specimen《沥青混合物 热混沥青的试验方法 第19部分 试样的渗透性 包含修改件A1 7 2007》.pdf EN 12697-19-2004 en Bituminous mixtures - Test methods for hot mix asphalt - Part 19 Permeability of specimen《沥青混合物 热混沥青的试验方法 第19部分 试样的渗透性 包含修改件A1 7 2007》.pdf
  • EN 12697-19-2012 8750 Bituminous mixtures - Test methods for hot mix asphalt - Part 19 Permeability of specimen《沥青混合物 热混合沥青的试验方法 第19部分 试样的渗透性》.pdf EN 12697-19-2012 8750 Bituminous mixtures - Test methods for hot mix asphalt - Part 19 Permeability of specimen《沥青混合物 热混合沥青的试验方法 第19部分 试样的渗透性》.pdf
  • EN 12697-2-2015 en Bituminous mixtures - Test methods - Part 2 Determination of particle size distribution《沥青混合料 热拌沥青实验方法 第2部分 粒子分布的测定》.pdf EN 12697-2-2015 en Bituminous mixtures - Test methods - Part 2 Determination of particle size distribution《沥青混合料 热拌沥青实验方法 第2部分 粒子分布的测定》.pdf
  • EN 12697-20-2012 en Bituminous mixtures - Test methods for hot mix asphalt - Part 20 Indentation using cube or cylindrical specimens (CY)《沥青混合物 热混沥青用试验方法 第20部分 使用立方体或圆柱试块(CY)的压痕试验》.pdf EN 12697-20-2012 en Bituminous mixtures - Test methods for hot mix asphalt - Part 20 Indentation using cube or cylindrical specimens (CY)《沥青混合物 热混沥青用试验方法 第20部分 使用立方体或圆柱试块(CY)的压痕试验》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1