REG NASA-LLIS-1291-2002 Lessons Learned - Use Industry Business Practices Where They Have Proven Successful Cost Effective and Conducive to Early Problem Resolution and Ultimate Pr.pdf

上传人:fatcommittee260 文档编号:1018930 上传时间:2019-03-21 格式:PDF 页数:3 大小:14.56KB
下载 相关 举报
REG NASA-LLIS-1291-2002 Lessons Learned - Use Industry Business Practices Where They Have Proven Successful Cost Effective and Conducive to Early Problem Resolution and Ultimate Pr.pdf_第1页
第1页 / 共3页
REG NASA-LLIS-1291-2002 Lessons Learned - Use Industry Business Practices Where They Have Proven Successful Cost Effective and Conducive to Early Problem Resolution and Ultimate Pr.pdf_第2页
第2页 / 共3页
REG NASA-LLIS-1291-2002 Lessons Learned - Use Industry Business Practices Where They Have Proven Successful Cost Effective and Conducive to Early Problem Resolution and Ultimate Pr.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1291Lesson Info:a71 Lesson Number: 1291a71 Lesson Date: 2002-01-01a71 Submitting Organization: ARCa71 Submitted by: DR Mendoza/ M. SumichSubject: Use Industry Business Practices Where They Have Proven Successful, Cost Effective, and Conducive to Early Problem Resolution and Ul

2、timate Project Success Description of Driving Event: The Projects contractor used an “Integrated Product Development“ (IPD) process to very successfully design and develop their deliverables. The IPDs, which used collocated, small and select teams to implement the processes, were able to perform rap

3、id prototype development and solve problems before they impacted the schedule and resulted in rework. The IPD design and development processes included participation by specialists and experts covering the full life-cycle of their deliverables including: design and engineering, maintenance, flight o

4、perations, software development and software/hardware integration. However, while the IPD process worked well in the design and manufacturing of the test vehicles, there was not a clear transition into the flight test phase. Lesson(s) Learned: The IPD process allowed the project to optimize the use

5、of its human resources and resulted in early problem resolution, less rework due to faulty or misunderstood design requirements, greater workforce motivation, and enhanced project tracking and control. The project would also have benefited by providing a greater degree of liaison between the develop

6、ment and flight test sites to understand and integrate the business practices and procedures peculiar to each. Recommendation(s): a71 Consider an “IPD-type“ design and development approach for projects that are collocated, Provided by IHSNot for ResaleNo reproduction or networking permitted without

7、license from IHS-,-,-small and human resource limited. These processes have been used repeatedly within competitive industry and honed to eliminate unnecessary or unworkable steps, while measuring progress and milestones to maintain critical path and real progress toward meeting the objectives. The

8、caveat is that the research team must understand and implement the processes rigorously and competently, requiring a knowledgeable design project leader.a71 If the project moves from one location to another during its life cycle, provide early and direct liaison with these other locales to integrate

9、 and understand their processes, procedures, and cultures to ensure an effective and efficient transition. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Space Operationsa71 Aeronautics ResearchAdditional

10、 Key Phrase(s): a71 Administration/Organizationa71 Independent Verification and Validationa71 Industrial Operationsa71 Policy & Planninga71 Risk Management/Assessmenta71 Safety & Mission AssuranceAdditional Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Info: a71 Approval Date: 2002-10-10a71 Approval Name: Anthony Bricenoa71 Approval Organization: ARCa71 Approval Phone Number: 650-604-1012Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ARMY MIL-T-62102 F-1990 TRUCK TRACTORS SEMITRAILER SPOTTER WITH HALF CAB DIESEL AND GASOLINE ENGINE DRIVEN 32 000 GVW 55 000 GCW AND 44 000 GVW 90 000 GCW 4X2 MODIFIED COMMERCIAL《G.pdf ARMY MIL-T-62102 F-1990 TRUCK TRACTORS SEMITRAILER SPOTTER WITH HALF CAB DIESEL AND GASOLINE ENGINE DRIVEN 32 000 GVW 55 000 GCW AND 44 000 GVW 90 000 GCW 4X2 MODIFIED COMMERCIAL《G.pdf
  • ARMY MIL-T-62109 C NOTICE 1-1996 TRAILERS LOWBED FORKLIFT TRANSPORTER 5450 AND 8150 KILOGRAM (6 AND 9 TON) MODIFIED COMMERCIAL《5450及 8150 千克(6及9 吨) 叉车转运车用 商用低车架挂车》.pdf ARMY MIL-T-62109 C NOTICE 1-1996 TRAILERS LOWBED FORKLIFT TRANSPORTER 5450 AND 8150 KILOGRAM (6 AND 9 TON) MODIFIED COMMERCIAL《5450及 8150 千克(6及9 吨) 叉车转运车用 商用低车架挂车》.pdf
  • ARMY MIL-T-62109 C-1993 TRAILERS LOWBED FORKLIFT TRANSPORTER 5450 AND 8150 KILOGRAM (6 AND 9 TON) MODIFIED COMMERCIAL《5450及 8150 千克(6及9 吨) 叉车转运车用 商用低车架挂车》.pdf ARMY MIL-T-62109 C-1993 TRAILERS LOWBED FORKLIFT TRANSPORTER 5450 AND 8150 KILOGRAM (6 AND 9 TON) MODIFIED COMMERCIAL《5450及 8150 千克(6及9 吨) 叉车转运车用 商用低车架挂车》.pdf
  • ARMY MIL-T-62110 G NOTICE 1-1995 TRUCKS MAINTENANCE WITH ROTATING HYDRAULIC DERRICK 32 000 TO 44 500 GVW 4X2 4X4 6X4 AND 6X6 COMMERCIAL《GVW为32 000 至 440 500磅 规格为4X2 4X4 6X4及6X6 装有旋.pdf ARMY MIL-T-62110 G NOTICE 1-1995 TRUCKS MAINTENANCE WITH ROTATING HYDRAULIC DERRICK 32 000 TO 44 500 GVW 4X2 4X4 6X4 AND 6X6 COMMERCIAL《GVW为32 000 至 440 500磅 规格为4X2 4X4 6X4及6X6 装有旋.pdf
  • ARMY MIL-T-62110 G-1990 TRUCKS MAINTENANCE WITH ROTATING HYDRAULIC DERRICK 32 000 TO 44 500 GVW 4X2 4X4 6X4 AND 6X6 COMMERCIAL《GVW为32 000 至 440 500磅 规格为4X2 4X4 6X4及6X6 装有旋转液压井架的维修车.pdf ARMY MIL-T-62110 G-1990 TRUCKS MAINTENANCE WITH ROTATING HYDRAULIC DERRICK 32 000 TO 44 500 GVW 4X2 4X4 6X4 AND 6X6 COMMERCIAL《GVW为32 000 至 440 500磅 规格为4X2 4X4 6X4及6X6 装有旋转液压井架的维修车.pdf
  • ARMY MIL-T-62126 C VALID NOTICE 2-2000 TRUCKS EQUIPMENT TRANSPORT TILT PLATFORM DIESEL AND GASOLINE ENGINE DRIVEN 24 000 GVW 4X2 AND 44 500 GVW 6X4 COMMERCIAL《24 000 GVW 4X2型及440 5.pdf ARMY MIL-T-62126 C VALID NOTICE 2-2000 TRUCKS EQUIPMENT TRANSPORT TILT PLATFORM DIESEL AND GASOLINE ENGINE DRIVEN 24 000 GVW 4X2 AND 44 500 GVW 6X4 COMMERCIAL《24 000 GVW 4X2型及440 5.pdf
  • ARMY MIL-T-62126 C-1988 TRUCKS EQUIPMENT TRANSPORT TILT PLATFORM DIESEL AND GASOLINE ENGINE DRIVEN 24 000 GVW 4X2 AND 44 500 GVW 6X4 COMMERCIAL《24 000 GVW 4X2型及440 500 GVW 6X4型 柴油及.pdf ARMY MIL-T-62126 C-1988 TRUCKS EQUIPMENT TRANSPORT TILT PLATFORM DIESEL AND GASOLINE ENGINE DRIVEN 24 000 GVW 4X2 AND 44 500 GVW 6X4 COMMERCIAL《24 000 GVW 4X2型及440 500 GVW 6X4型 柴油及.pdf
  • ARMY MIL-T-62145 E NOTICE 1-1995 TRUCKS ELEVATING BODY DIESEL AND GASOLINE ENGINE DRIVEN 21 000 TO 39 500 POUNDS GVW 4X2 AND 6X4 COMMERCIAL《21 000 至 390 500 磅 GVW 规格为4X2及6X4 柴油及汽油发.pdf ARMY MIL-T-62145 E NOTICE 1-1995 TRUCKS ELEVATING BODY DIESEL AND GASOLINE ENGINE DRIVEN 21 000 TO 39 500 POUNDS GVW 4X2 AND 6X4 COMMERCIAL《21 000 至 390 500 磅 GVW 规格为4X2及6X4 柴油及汽油发.pdf
  • ARMY MIL-T-62145 E-1990 TRUCKS ELEVATING BODY DIESEL AND GASOLINE ENGINE DRIVEN 21 000 TO 39 500 POUNDS GVW 4X2 AND 6X4 COMMERCIAL《21 000 至 390 500 磅 GVW 规格为4X2及6X4 柴油及汽油发动机驱动的 商用升.pdf ARMY MIL-T-62145 E-1990 TRUCKS ELEVATING BODY DIESEL AND GASOLINE ENGINE DRIVEN 21 000 TO 39 500 POUNDS GVW 4X2 AND 6X4 COMMERCIAL《21 000 至 390 500 磅 GVW 规格为4X2及6X4 柴油及汽油发动机驱动的 商用升.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1