REG NASA-LLIS-1362-2003 Lessons Learned Program and Project Management Customer Relations.pdf

上传人:medalangle361 文档编号:1019001 上传时间:2019-03-21 格式:PDF 页数:2 大小:13.19KB
下载 相关 举报
REG NASA-LLIS-1362-2003 Lessons Learned Program and Project Management Customer Relations.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-1362-2003 Lessons Learned Program and Project Management Customer Relations.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1362Lesson Info:a71 Lesson Number: 1362a71 Lesson Date: 2003-01-01a71 Submitting Organization: ARCa71 Submitted by: Donald R. MendozaSubject: Program and Project Management: Customer Relations Abstract: In order to build and maintain a trusted and established relationship with

2、 its data sources and partners, projects must have an awareness and sensitivity to their partners environment.Description of Driving Event: The Project, whose main objective was to reduce human error caused incidents and accidents in aviation, was dependent on acquiring highly sensitive information

3、from several of its customers/stakeholders. This was made especially challenging by the increased demands for security and resources placed upon the airline industry by the 9/11/2001 terrorist attacks.Lesson(s) Learned: In order to build and maintain a trusted and established relationship with its d

4、ata sources and partners, the Project ensured awareness and sensitivity to their environment by: 1. Adjusting their information requests/requirements to be compatible with the providers schedule and resources.2. Hiring and consulting people with histories and background experience working with these

5、 sources.The result of these efforts not only maintained the Projects relationship with the industry but strengthened it as the airlines did their best to respond to the Projects original schedule of requests and recommended other sources of information to fill any gaps. Recommendation(s): Provided

6、by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Projects having dependencies on partners that may be extremely sensitive to social/economic/political events should consider: 1. Defining milestones, in a broad sense, such that their schedule can be adjusted to

7、 compliment that of their partners.2. Staffing the Project with personnel who have experience working with similar partners and in a similar volatile environment (personnel with direct work experience with the Projects partners may prove to be valuable assets to have).Evidence of Recurrence Control

8、Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Space Operationsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 External Relationsa71 Program and Project ManagementAdditional Info: Approval Info: a71 Approval Date: 2003-09-29a71 Approval Name: Andrew Hockera71 Approval Organization: ARCa71 Approval Phone Number: 650-604-4120Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ITU-T K 57 SPANISH-2003 Protection measures for radio base stations sited on power line towers《铁塔上的无线基站的送电线路的保护措施 系列K 干扰防护 5号研究组》.pdf ITU-T K 57 SPANISH-2003 Protection measures for radio base stations sited on power line towers《铁塔上的无线基站的送电线路的保护措施 系列K 干扰防护 5号研究组》.pdf
  • ITU-T K 57-2003 Protection measures for radio base stations sited on power line towers SERIES K PROTECTION AGAINST INTERFERENCE (Study Group 5)《输电线塔上的无线基站的保护措施 系列K 抗干扰防护(研究组5)》.pdf ITU-T K 57-2003 Protection measures for radio base stations sited on power line towers SERIES K PROTECTION AGAINST INTERFERENCE (Study Group 5)《输电线塔上的无线基站的保护措施 系列K 抗干扰防护(研究组5)》.pdf
  • ITU-T K 58-2014 EMC resistibility and safety requirements and guidance for determining responsibility under co-located information and communication technology installations (Study.pdf ITU-T K 58-2014 EMC resistibility and safety requirements and guidance for determining responsibility under co-located information and communication technology installations (Study.pdf
  • ITU-T K 59-2015 Electromagnetic compatibility resistibility and safety requirements and procedures for connection to unbundled cables (Study Group 5)《电磁兼容 性能和连接非捆绑电缆的安全要求和程序(研究组5)》.pdf ITU-T K 59-2015 Electromagnetic compatibility resistibility and safety requirements and procedures for connection to unbundled cables (Study Group 5)《电磁兼容 性能和连接非捆绑电缆的安全要求和程序(研究组5)》.pdf
  • ITU-T K 6 FRENCH-1988 PRECAUTIONS AT CROSSINGS《交越时的预防措施》.pdf ITU-T K 6 FRENCH-1988 PRECAUTIONS AT CROSSINGS《交越时的预防措施》.pdf
  • ITU-T K 6 SPANISH-1988 PRECAUTIONS AT CROSSINGS《交越时的预防措施》.pdf ITU-T K 6 SPANISH-1988 PRECAUTIONS AT CROSSINGS《交越时的预防措施》.pdf
  • ITU-T K 6-1988 PRECAUTIONS AT CROSSINGS《交越时的预防措施-抗干扰防护(研究组5)2页》.pdf ITU-T K 6-1988 PRECAUTIONS AT CROSSINGS《交越时的预防措施-抗干扰防护(研究组5)2页》.pdf
  • ITU-T K 60-2015 Emission levels and test methods for wireline telecommunication networks to minimize electromagnetic disturbance of radio services (Study Group 5)《有线电信网络电台服务减少电磁干扰发.pdf ITU-T K 60-2015 Emission levels and test methods for wireline telecommunication networks to minimize electromagnetic disturbance of radio services (Study Group 5)《有线电信网络电台服务减少电磁干扰发.pdf
  • ITU-T K 61-2008 Guidance on measurement and numerical prediction of electromagnetic fields for compliance with human exposure limits for telecommunication installations (Study Grou.pdf ITU-T K 61-2008 Guidance on measurement and numerical prediction of electromagnetic fields for compliance with human exposure limits for telecommunication installations (Study Grou.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1