REG NASA-LLIS-1452--2003 Lessons Learned - Accident Investigations Configuration Management (CM) Personnel Issues.pdf

上传人:孙刚 文档编号:1019090 上传时间:2019-03-21 格式:PDF 页数:2 大小:13.31KB
下载 相关 举报
REG NASA-LLIS-1452--2003 Lessons Learned - Accident Investigations Configuration Management (CM) Personnel Issues.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-1452--2003 Lessons Learned - Accident Investigations Configuration Management (CM) Personnel Issues.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1452Lesson Info:a71 Lesson Number: 1452a71 Lesson Date: 2003-08-31a71 Submitting Organization: JSCa71 Submitted by: David LengyelSubject: Accident Investigations/Configuration Management (CM)/Personnel Issues Abstract: Pre-planning to include set of draft processes for data an

2、d configuration management developed in advance and ready for implementation might improve accident investigation start-up efficiency.Description of Driving Event: For the Columbia accident investigation, personnel and processes were not in place to assist in startup. Although heroic efforts on the

3、part of key CM personnel minimized the number of individual problems, better planning might have improved startup efficiency.Lesson(s) Learned: Have a set of draft processes ready to implement for data management and configuration management.Recommendation(s): a71 Include CM processes defined for th

4、e Task Force as an initial reference in the NASA Contingency Action Plan (CAP). Revising a previous or pre-established process will be easier than starting from scratch and the Board will run more smoothly as well.a71 Ensure that adequate CM personnel resources are available at startup.a71 Use these

5、 guidelines for CM personnel requirements (EPs): a72 (1) Action Trackers (Start-up: 4, Peak: 8, Std Ops: 4)a72 (2) Data Entry and Librarian/Archivist: 5, Library function includes expertise on scanning and archiving. Bring in someone familiar with library science to assist with the document manageme

6、nt function. Create a library group.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a72 (3) IT Support/Processes (Start-up: 3 Database Administrators: 2 (Prime/Back-up): Individual should have knowledge of existing NASA action tracking AND document m

7、anagement databasesa72 (4) Meeting Coordinator/Minute Recorder: 3Evidence of Recurrence Control Effectiveness: TBD NASA ResponseDocuments Related to Lesson: Agency Contingency Action Plan for Space Flight OperationsMission Directorate(s): a71 Space Operationsa71 Exploration SystemsAdditional Key Phr

8、ase(s): a71 Accident Investigationa71 Administration/Organizationa71 Computersa71 Configuration Managementa71 Information Technology/Systemsa71 NASA Standardsa71 Policy & Planninga71 Safety & Mission AssuranceAdditional Info: Approval Info: a71 Approval Date: 2004-06-16a71 Approval Name: Ronald Montaguea71 Approval Organization: JSCa71 Approval Phone Number: 281-483-8576Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1