REG NASA-LLIS-1721-2006 Lessons Learned - Emergency Pre-planning System.pdf

上传人:terrorscript155 文档编号:1019262 上传时间:2019-03-21 格式:PDF 页数:3 大小:14.79KB
下载 相关 举报
REG NASA-LLIS-1721-2006 Lessons Learned - Emergency Pre-planning System.pdf_第1页
第1页 / 共3页
REG NASA-LLIS-1721-2006 Lessons Learned - Emergency Pre-planning System.pdf_第2页
第2页 / 共3页
REG NASA-LLIS-1721-2006 Lessons Learned - Emergency Pre-planning System.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1721Lesson Info:a71 Lesson Number: 1721a71 Lesson Date: 2006-03-14a71 Submitting Organization: JSCa71 Submitted by: Ron MontagueSubject: Emergency Pre-planning System Abstract: A system of pre-start tasks ane emergency plannning ameliorated the effects of an arc blast to an em

2、ployee.Description of Driving Event: An electrician suffered burns from an electrical arc/blast when a pre-existing condition in a power distribution panel ultimately led to a ground fault in a 3-phase 480-volt power supply. The pre-existing condition was believed to be an access panel fastener that

3、 had penetrated conductor insulation. The response of local emergency resources to the mishap was exemplary, but would have been delayed if the injured worker had not just done his own safety task analysis just before the mishap. The safety task analysis included among other things locating fire ala

4、rm pull boxes and extinguishers; who to call in case of an emergency; what hazards were in place in the work area; etc. This safety task analysis is routinely performed before each task to ensure that risks are minimized prior to start of work. Because the worker pulled the alarm box within ten seco

5、nds after being injured, emergency response teams responded and were at the scene within 3 minutes of the event. Response was initiated before detectors triggered alarms at the Emergency Operations Center and the fire station. The employee was already showing signs of shock upon arrival of fire prot

6、ection specialists who administered first aid until the paramedics arrived a couple minutes later. The patient was transported to a downtown hospital?s burn unit and arrived within 40 minutes of the emergency. At the same time first aid was being administered, additional fire protection specialists

7、began to fight Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the small fire in the building. The fire was extinguished immediately with a dry chemical extinguisher and before the fire suppression system was triggered. Damage/loss of mission-critica

8、l equipment and facilities was averted. The reported community standard for emergency response is for resources to arrive at the scene within 30 minutes of notification. Without a working fire suppression system in place, total building involvement would have occurred. The presence of onsite resourc

9、es plus the pre-established response by the employee reduced response time to 3 minutes. Because everything was in place ? employee response, systems in place, and resources ready - the injured employee was stabilized rapidly and the damage incurred was restricted to the failed equipment.Lesson(s) L

10、earned: Conducting pre-start job safety analyses and job hazard assessments ensures success in emergency situationsRecommendation(s): 1. Consider benchmarking the distribution of emergency response resources at JSC as a ?best practice? for all NASA centers.Evidence of Recurrence Control Effectivenes

11、s: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Additional Categories.a71 Additional Categories.Emergency Preparednessa71 Additional Categories.Facilitiesa71 Additional Categories.Human Factorsa71 Additional Categories.Human Resources & Educationa71 Add

12、itional Categories.Industrial OperationsProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Additional Categories.Personal Protective Equipmenta71 Additional Categories.Policy & Planninga71 Additional Categories.Risk Management/Assessmenta71 Additional Categories.Safety & Mission AssuranceAdditional Info: a71 Project: N/AApproval Info: a71 Approval Date: 2006-06-30a71 Approval Name: tmasona71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • DIN EN ISO 4892-1-2016 Plastics - Methods of exposure to laboratory light sources - Part 1 General guidance (ISO 4892-1 2016) German version EN ISO 4892-1 2016《塑料 实验室光源暴露方法 第1部分 通用.pdf DIN EN ISO 4892-1-2016 Plastics - Methods of exposure to laboratory light sources - Part 1 General guidance (ISO 4892-1 2016) German version EN ISO 4892-1 2016《塑料 实验室光源暴露方法 第1部分 通用.pdf
  • DIN EN ISO 4892-2-2013 Plastics - Methods of exposure to laboratory light sources - Part 2 Xenon-arc lamps (ISO 4892-2 2013) German version EN ISO 4892-2 2013《塑料 实验室光源暴露方法 第2部分 氙弧灯.pdf DIN EN ISO 4892-2-2013 Plastics - Methods of exposure to laboratory light sources - Part 2 Xenon-arc lamps (ISO 4892-2 2013) German version EN ISO 4892-2 2013《塑料 实验室光源暴露方法 第2部分 氙弧灯.pdf
  • DIN EN ISO 4892-3-2016 Plastics - Methods of exposure to laboratory light sources - Part 3 Fluorescent UV lamps (ISO 4892-3 2016) German version EN ISO 4892-3 2016《塑料 实验室光源暴露法 第3部分.pdf DIN EN ISO 4892-3-2016 Plastics - Methods of exposure to laboratory light sources - Part 3 Fluorescent UV lamps (ISO 4892-3 2016) German version EN ISO 4892-3 2016《塑料 实验室光源暴露法 第3部分.pdf
  • DIN EN ISO 4894-2-1999 Plastics - Styrene acrylonitrile (SAN) moulding and extrusion materials - Part 2 Preparation of test specimens and determination of properties (ISO 4894-2 19.pdf DIN EN ISO 4894-2-1999 Plastics - Styrene acrylonitrile (SAN) moulding and extrusion materials - Part 2 Preparation of test specimens and determination of properties (ISO 4894-2 19.pdf
  • DIN EN ISO 4895-2014 Plastics - Liquid epoxy resins - Determination of tendency to crystallize (ISO 4895 2014) German version EN ISO 4895 2014《塑料 液态环氧树脂 结晶趋向的测定(ISO 4895-2014) 德文版本.pdf DIN EN ISO 4895-2014 Plastics - Liquid epoxy resins - Determination of tendency to crystallize (ISO 4895 2014) German version EN ISO 4895 2014《塑料 液态环氧树脂 结晶趋向的测定(ISO 4895-2014) 德文版本.pdf
  • DIN EN ISO 4920-2012 Textile fabrics - Determination of resistance to surface wetting (spray test) (ISO 4920 2012) German version EN ISO 4920 2012《纺织物 表面抗湿性测定 (喷雾试验) (ISO 4920-2012.pdf DIN EN ISO 4920-2012 Textile fabrics - Determination of resistance to surface wetting (spray test) (ISO 4920 2012) German version EN ISO 4920 2012《纺织物 表面抗湿性测定 (喷雾试验) (ISO 4920-2012.pdf
  • DIN EN ISO 4921-2002 Knitting - Basic concepts - Vocabulary (ISO 4921 2000) German version EN ISO 4921 2001《针织 基本概念 术语》.pdf DIN EN ISO 4921-2002 Knitting - Basic concepts - Vocabulary (ISO 4921 2000) German version EN ISO 4921 2001《针织 基本概念 术语》.pdf
  • DIN EN ISO 4934-2004 Steel and iron - Determination of sulfur content - Gravimetric method (ISO 4934 2003) German version EN ISO 4934 2003《钢和铁 硫含量的测定 重力法》.pdf DIN EN ISO 4934-2004 Steel and iron - Determination of sulfur content - Gravimetric method (ISO 4934 2003) German version EN ISO 4934 2003《钢和铁 硫含量的测定 重力法》.pdf
  • DIN EN ISO 4938-2016 Steel and iron - Determination of nickel content - Gravimetric or titrimetric method (ISO 4938 2016) German version EN ISO 4938 2016《钢和铁 镍含量的测定 重量法或容量法(ISO 493.pdf DIN EN ISO 4938-2016 Steel and iron - Determination of nickel content - Gravimetric or titrimetric method (ISO 4938 2016) German version EN ISO 4938 2016《钢和铁 镍含量的测定 重量法或容量法(ISO 493.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1