REG NASA-LLIS-1851--2009 Lessons Learned - KSC Checkout and Launch Control System (CLCS) - Project Systems SM&A.pdf

上传人:feelhesitate105 文档编号:1019320 上传时间:2019-03-21 格式:PDF 页数:3 大小:15.25KB
下载 相关 举报
REG NASA-LLIS-1851--2009 Lessons Learned - KSC Checkout and Launch Control System (CLCS) - Project Systems SM&A.pdf_第1页
第1页 / 共3页
REG NASA-LLIS-1851--2009 Lessons Learned - KSC Checkout and Launch Control System (CLCS) - Project Systems SM&A.pdf_第2页
第2页 / 共3页
REG NASA-LLIS-1851--2009 Lessons Learned - KSC Checkout and Launch Control System (CLCS) - Project Systems SM&A.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Lessons Learned Entry: 1851Lesson Info:a71 Lesson Number: 1851a71 Submitting Organization: KSCa71 Submitted by: Scott Estesa71 POC Name: Scott Estesa71 POC Email: Scott.Estes-1nasa.govSubject: KSC Checkout and Launch Control System (CLCS) - Project, Systems, SM&A Abstract: The CLCS project was initi

2、ated in FY 1997 to modernize the Launch Processing System (LPS) that was engineered and developed in the 1970s. The modernization was needed to ensure continued safe and dependable launch support for the Shuttle program. Per initial planning, CLCS was projected to reduce the costs for Shuttle operat

3、ions at KSC, in addition to being an architecture in place that would support future planning and new program activities to occur at KSC. The CLCS project experienced many significant challenges even from the project startup (i.e., time and resources that included both funding and manpower). This le

4、sson document covers project/program management, systems engineering, and safey and mission assurance.Description of Driving Event: N/ALesson(s) Learned: Project startup takes time. Its difficult for the agency to free up resources (people and $) to get a project started. While a relatively small pr

5、oject office can perform initial project planning, follow-on contracts and civil service support takes a significant amount of time and effort to get in place.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Recommendation(s): Project/Program Manageme

6、nt 1. Dont fall into the trap of success-oriented planning. While it sells well, it causes a lot of pain down the road when problems inevitably occur. If the customers/sponsors cant stand the truth upfront, negotiate something that they can stomach or cancel the project. Make sure that the early pro

7、ject milestones are readily achievable so that the project gets off to a good start. Overly aggressive Code T plans appear to be ripe for downstream, massively public scrutiny. 2. Establish reserves for both schedule and budget. Projects usually remember to include a budget reserve, but schedule res

8、erve is equally important. When schedules slip, expensive labor curves shift to the right. Its important for the project/program manager to have both types of contingency built into the plan. 3. Establish success criteria for the project. Its important that stakeholders have key cost, schedule, and

9、technical parameters that are agreed on up front. Measure progress against near term and long term milestones and criteria. Systems Engineering 1. Systems Engineers need design budgets. System designers need to have development and Life Cycle Cost budgets to constrain their designs. They also need t

10、o have clear finish points. System engineers will continue to design until they are turned off resulting in unnecessary system features and cost. 2. Systems Engineers need performance budgets. System designers need to breakdown system level performance requirements and establish lower level performa

11、nce budgets. For example, a software system needs to establish CSCI/CSC processing time budgets and spacecrafts need to establish subsystems weight budgets. Safety and Mission Assurance 1. Include Safety Engineers in the Systems Engineering effort. While good system designers can effectively design

12、in safety, its important that Safety Engineers are also involved upfront. Waiting until the end to get safety input increases the cost of fixing perceived problems.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: Provided by IHSNot for ResaleNo reproduction or networking

13、 permitted without license from IHS-,-,-Click here to download document. Mission Directorate(s): N/AAdditional Key Phrase(s): a71 Additional Categories.Launch Processa71 Additional Categories.Launch VehicleAdditional Info: Approval Info: a71 Approval Date: 2009-01-27a71 Approval Name: mbella71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ASD-STAN PREN 2591-C8-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part C8 - Sand and Dust (Issue P 1)《航空航天系列 电气和光学连接部件 试验方法 第C8部分 沙尘 第P1版》.pdf ASD-STAN PREN 2591-C8-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part C8 - Sand and Dust (Issue P 1)《航空航天系列 电气和光学连接部件 试验方法 第C8部分 沙尘 第P1版》.pdf
  • ASD-STAN PREN 2591-C9-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part C9 - Dry Heat (Issue P 1)《航空航天系列 电气和光学连接部件 试验方法 第C9部分 干热 第P1版》.pdf ASD-STAN PREN 2591-C9-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part C9 - Dry Heat (Issue P 1)《航空航天系列 电气和光学连接部件 试验方法 第C9部分 干热 第P1版》.pdf
  • ASD-STAN PREN 2591-D1-1991 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D1 - Acceleration Steady State (Edition 1)《航空航天系列 电气和光学连接部件 试验方法 第D1部分 加.pdf ASD-STAN PREN 2591-D1-1991 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D1 - Acceleration Steady State (Edition 1)《航空航天系列 电气和光学连接部件 试验方法 第D1部分 加.pdf
  • ASD-STAN PREN 2591-D10-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D10 - Insert Retention in Housing (Axial) (Issue P 1)《航空航天系列 电气和光学连接部件 .pdf ASD-STAN PREN 2591-D10-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D10 - Insert Retention in Housing (Axial) (Issue P 1)《航空航天系列 电气和光学连接部件 .pdf
  • ASD-STAN PREN 2591-D11-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D11 - Insert Retention in Housing (Torsional) (Issue P 1)《航空航天系列 电气和光学连.pdf ASD-STAN PREN 2591-D11-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D11 - Insert Retention in Housing (Torsional) (Issue P 1)《航空航天系列 电气和光学连.pdf
  • ASD-STAN PREN 2591-D12-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D12 - Contact Insertion and Extraction Forces (Issue P 1)《航空航天系列 电气和光学连.pdf ASD-STAN PREN 2591-D12-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D12 - Contact Insertion and Extraction Forces (Issue P 1)《航空航天系列 电气和光学连.pdf
  • ASD-STAN PREN 2591-D13-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D13 - Holding Force of Grounding Spring System (Issue P 1)《航空航天系列 电气和光学.pdf ASD-STAN PREN 2591-D13-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D13 - Holding Force of Grounding Spring System (Issue P 1)《航空航天系列 电气和光学.pdf
  • ASD-STAN PREN 2591-D14-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D14 - Unmating of Lanyard Release Connectors (Issue P 1)《航空航天系列 电气和光学连接.pdf ASD-STAN PREN 2591-D14-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D14 - Unmating of Lanyard Release Connectors (Issue P 1)《航空航天系列 电气和光学连接.pdf
  • ASD-STAN PREN 2591-D15-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D15 - Test Probe Damage (Female Contact) (Issue P 1)《航空航天系列 电气和光学连接部件 试.pdf ASD-STAN PREN 2591-D15-1992 Aerospace Series Elements of Electrical and Optical Connection Test Methods Part D15 - Test Probe Damage (Female Contact) (Issue P 1)《航空航天系列 电气和光学连接部件 试.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1