REG NASA-LLIS-3296-2010 Lessons Learned Verify Sound Suppression Piping Is Pre-Filled To Lowest Nozzles Prior To Tank Fill.pdf

上传人:ownview251 文档编号:1019418 上传时间:2019-03-21 格式:PDF 页数:3 大小:582.19KB
下载 相关 举报
REG NASA-LLIS-3296-2010 Lessons Learned Verify Sound Suppression Piping Is Pre-Filled To Lowest Nozzles Prior To Tank Fill.pdf_第1页
第1页 / 共3页
REG NASA-LLIS-3296-2010 Lessons Learned Verify Sound Suppression Piping Is Pre-Filled To Lowest Nozzles Prior To Tank Fill.pdf_第2页
第2页 / 共3页
REG NASA-LLIS-3296-2010 Lessons Learned Verify Sound Suppression Piping Is Pre-Filled To Lowest Nozzles Prior To Tank Fill.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 Public Lessons Learned Entry: 3296Lesson Info:a71 Lesson Number: 3296 a71 Lesson Date: 2010-06-10 a71 Submitting Organization: KSC a71 Submitted by: Annette Pitt Subject: Verify Sound Suppression Piping Is Pre-Filled To Lowest Nozzles Prior To Tank Fill Abstract: For the Space Shuttle Program, a So

2、und Suppression Water System was installed on the launch pads to protect the orbiter and its payloads from damage by acoustical energy and rocket exhaust reflected from the flame trench and Mobile Launcher Platform during launch. Filling the Sound Suppression Water Systems tank and riser, and prefil

3、ling its lines, can normally be done in less than 2 hours (not including time for relocation of technicians). However, if the piping were completely drained (e.g., for a valve inspection or inspection of the internal piping), filling the lines, tank, and riser would take about 8 hours. A launch can

4、be delayed if the schedule does not account for this extra time for filling. Description of Driving Event: During processing for a Shuttle launch in 2007, the Sound Suppression water piping was not prefilled before the launch countdown began. (The piping had been drained for an inspection.) Filling

5、the tank and riser took approximately 8 hours. This led to a delay in the launch schedule, because the technicians required extra time to do the filling. Lesson(s) Learned: To avoid launch delays, the water lines in the Sound Suppression Water System should be prefilled before the start of the count

6、down. Figure 1: Engineers observe water being pumped on the launch pad through the Sound Suppression System Figure 2: Sound Suppression Water System Schematic Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Figure 3: Water lines and 48“ Valves Recomm

7、endation(s): Add steps to the procedures for launch processing to verify the water lines in the Sound Suppression Water System are prefilled before the start of a launch countdown. Evidence of Recurrence Control Effectiveness: N/A Documents Related to Lesson: N/A Mission Directorate(s): a71 Space Op

8、erations a71 Exploration Systems Additional Key Phrase(s): a71 1.Launch support systems a71 1.Maintenance a71 1.Ground support systems Additional Info: a71 Project: Space Shuttle Program Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Info: a71 Approval Date: 2010-12-02 a71 Approval Name: mbell a71 Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • EN 60034-27-3-2016 en Rotating electrical machines - Part 27-3 Dielectric dissipation factor measurement on stator winding insulation of rotating electrical machines.pdf EN 60034-27-3-2016 en Rotating electrical machines - Part 27-3 Dielectric dissipation factor measurement on stator winding insulation of rotating electrical machines.pdf
  • EN 60034-28-2013 en Rotating electrical machines - Part 28 Test methods for determining quantities of equivalent circuit diagrams for three-phase low-voltage cage induction motors.pdf EN 60034-28-2013 en Rotating electrical machines - Part 28 Test methods for determining quantities of equivalent circuit diagrams for three-phase low-voltage cage induction motors.pdf
  • EN 60034-29-2008 en Rotating electrical machines - Part 29 Equivalent loading and superposition techniques - Indirect testing to determine temperature rise《旋转电机 第29部分 等效加载和迭加技术 测定温.pdf EN 60034-29-2008 en Rotating electrical machines - Part 29 Equivalent loading and superposition techniques - Indirect testing to determine temperature rise《旋转电机 第29部分 等效加载和迭加技术 测定温.pdf
  • EN 60034-3-2008 en Rotating electrical machines Part 3 Specific requirements for cylindrical rotor synchronous machines《旋转电机 第3部分 鼓形转子同步机的特殊要求》.pdf EN 60034-3-2008 en Rotating electrical machines Part 3 Specific requirements for cylindrical rotor synchronous machines《旋转电机 第3部分 鼓形转子同步机的特殊要求》.pdf
  • EN 60034-30-1-2014 en Rotating electrical machines - Part 30-1 Efficiency classes of line operated AC motors (IE code).pdf EN 60034-30-1-2014 en Rotating electrical machines - Part 30-1 Efficiency classes of line operated AC motors (IE code).pdf
  • EN 60034-4-2008 en Rotating electrical machines - Part 4 Methods for determining synchronous machine quantities from tests《旋转电机 第4部分 同步电机参数的试验测定方法》.pdf EN 60034-4-2008 en Rotating electrical machines - Part 4 Methods for determining synchronous machine quantities from tests《旋转电机 第4部分 同步电机参数的试验测定方法》.pdf
  • EN 60034-5-2001 en Rotating Electrical Machines Part 5 Degrees of Protection Provided by the Integral Design of Rotating Electrical Machines (IP Code) - Classification (Incorporate.pdf EN 60034-5-2001 en Rotating Electrical Machines Part 5 Degrees of Protection Provided by the Integral Design of Rotating Electrical Machines (IP Code) - Classification (Incorporate.pdf
  • EN 60034-6-1993 en Rotating Electrical Machines Part 6 Methods of Cooling (IC Code)《旋转电机 第6部分 冷却方法(IC代号)(IEC 34-6-1991)[替代 CENELEC HD 53 6 S1]》.pdf EN 60034-6-1993 en Rotating Electrical Machines Part 6 Methods of Cooling (IC Code)《旋转电机 第6部分 冷却方法(IC代号)(IEC 34-6-1991)[替代 CENELEC HD 53 6 S1]》.pdf
  • EN 60034-7-1993 en Rotating Electrical Machines - Part 7 Classification of Types of Construction Mounting Arrangements and Twerminal Box Position (IM Code) (Incorporates Amendment .pdf EN 60034-7-1993 en Rotating Electrical Machines - Part 7 Classification of Types of Construction Mounting Arrangements and Twerminal Box Position (IM Code) (Incorporates Amendment .pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1