REG NASA-LLIS-4556-2012 Lessons Learned - Program vs Center Processes.pdf

上传人:sofeeling205 文档编号:1019453 上传时间:2019-03-21 格式:PDF 页数:2 大小:58.98KB
下载 相关 举报
REG NASA-LLIS-4556-2012 Lessons Learned - Program vs Center Processes.pdf_第1页
第1页 / 共2页
REG NASA-LLIS-4556-2012 Lessons Learned - Program vs Center Processes.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Public Lessons Learned Entry: 4556 Lesson Info: Lesson Number: 4556 Submitting Organization: KSC Submitted by: Jenni Palmer Subject: Program vs. Center Processes Abstract: The Constellation Program spanned many NASA Centers. NPR 1440.6 requires Center Directors to “Ensure implementation of effective

2、 records management programs at their Centers“, which new Programs that reside at the center are expected to follow. However, NPR 1440.6 also levies responsibilities on Program Management to “Ensure execution of NASA records management functions within their respective organizations through the impl

3、ementation of information and records management infrastructure and processes“. This overlap in responsibility was not addressed during Constellation Program formulation, leading to a mature Program with as many record management methodologies as participating centers When the Center has processes i

4、n place to perform the work, Programs executing work at the Center should use the available processes rather than creating redundant processes. Failure to use Center processes results in wasted resources. Description of Driving Event: Programs coming to a Center to execute projects should avoid rein

5、venting processes already in place at the Center. The Constellation Program (CxP) had the Ground Operations Project (GOP) at Kennedy Space Center. CxP invented its own process for business systems documentation in addition to the one the Center already had. This resulted in two different processes f

6、or records management: one for the Center and one for the CxP Business Records Template (BRT). Kennedy Space Center (KSC) is governed by NPR 1441.1D, NASA Records Retention Schedules, and KNPR_1440.6, KSC Records Management which requires a business records listing. The CxP developed a “catalog“ (i.

7、e. access database) with considerable additional attributes to be managed for Program records. This resulted in Projects having two requirements for records identification, which is an additional effort. Lesson(s) Learned: Programs should make use of Center processes where possible. The Agency shoul

8、d establish a uniform process and requirements for records management and other processes. In this case, KSC business records documentation (i.e., Kennedy Documented Processes (KDPs) vs. CxP documentation) was the issue. If the Center already has processes in place to perform the work, use the avail

9、able resources to achieve the work. Recommendation(s): 1. Programs doing business at multiple NASA Centers should utilize the processes already established at the Center, which is especially important to ensure integration and standardization. 2. Use established Agency-wide process for records manag

10、ement and implement it at the start of any new Program with continuous monitoring for any new additional requirements, and ultimately for Program closeout purposes and efficiency./li Evidence of Recurrence Control Effectiveness: N/A Documents Related to Lesson: NPR 1441.1D, NASA Records Retention KN

11、PR_1440.6 KSC Records Management Mission Directorate(s): Exploration Systems Additional Key Phrase(s): Program Management.Cross Agency Coordination Program Management.Configuration and Data Management Program Management.Business Processes Policy & Planning Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Additional Info: Project: Constellation Approval Info: Approval Date: 2012-10-17 Approval Name: mbell Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • GOST 20193-1974 Wachers for fastening type connection on external cone Construction and dimensions《外圆锥管路连接紧固用垫圈 结构及尺寸》.pdf GOST 20193-1974 Wachers for fastening type connection on external cone Construction and dimensions《外圆锥管路连接紧固用垫圈 结构及尺寸》.pdf
  • GOST 20194-1974 Screwed unions for metal packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带金属垫旋入式接头 结构及尺寸》.pdf GOST 20194-1974 Screwed unions for metal packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带金属垫旋入式接头 结构及尺寸》.pdf
  • GOST 20195-1974 Screwed unions for rubber packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带橡皮垫旋入式接头 结构及尺寸》.pdf GOST 20195-1974 Screwed unions for rubber packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带橡皮垫旋入式接头 结构及尺寸》.pdf
  • GOST 20196-1974 Screwed reduce-type unions for rubber packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带橡皮垫旋入式异径接头 结构及尺寸》.pdf GOST 20196-1974 Screwed reduce-type unions for rubber packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带橡皮垫旋入式异径接头 结构及尺寸》.pdf
  • GOST 20197-1974 Screwed union elbows for rubber packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带橡皮垫旋入式弯头 结构及尺寸》.pdf GOST 20197-1974 Screwed union elbows for rubber packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带橡皮垫旋入式弯头 结构及尺寸》.pdf
  • GOST 20198-1974 Screwed reduce-type union elbows for rubber packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带橡皮垫旋入式异径弯头 结构及尺寸》.pdf GOST 20198-1974 Screwed reduce-type union elbows for rubber packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带橡皮垫旋入式异径弯头 结构及尺寸》.pdf
  • GOST 20199-1974 Screwed union tees for rubber packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带橡皮垫旋入式三通 结构及尺寸》.pdf GOST 20199-1974 Screwed union tees for rubber packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带橡皮垫旋入式三通 结构及尺寸》.pdf
  • GOST 20200-1974 Screwed reduce-type union tees for rubber packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带橡皮垫旋入式异径三通 结构及尺寸》.pdf GOST 20200-1974 Screwed reduce-type union tees for rubber packer for tube connections on external cone Construction and dimensions《外圆锥管路连接用带橡皮垫旋入式异径三通 结构及尺寸》.pdf
  • GOST 20214-1974 Electrical conductive plastics Test method for determination of specific volume electrical resistance at d c voltage《导电塑料 直流电压体电阻测定法》.pdf GOST 20214-1974 Electrical conductive plastics Test method for determination of specific volume electrical resistance at d c voltage《导电塑料 直流电压体电阻测定法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1