1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 86 26.07 40 (February 2012)-Preparing Activity: NASA SupersedingUFGS-01 86 26.07 40 (February 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2012*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTIO
2、N 01 86 26.07 40RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SYSTEMS02/12PART 1 GENERAL1.1 SYSTEM DESCRIPTION1.2 REFERENCES1.3 SUBMITTALS1.4 DESIGN DATA1.5 QUALITY ASSURANCE1.6 WARRANTYPART 2 PRODUCTS2.1 PRODUCT DATA2.1.1 Manufacturer Product Data2.1.2 Certification Data2.1.3 Specific Equipment Da
3、ta2.1.4 Extra MaterialsPART 3 EXECUTION3.1 INSTALLATION3.2 EXAMINATION3.3 FIELD QUALITY CONTROL AND ACCEPTANCE TESTING3.3.1 Predictive Testing and Inspection Tests3.3.2 Baseline Data from Verification Testing3.4 OPERATIONS AND MAINTENANCE3.5 ACCEPTANCE DOCUMENTATION- End of Section Table of Contents
4、 -SECTION 01 86 26.07 40 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-01 86 26.07 40 (February 2012)-Preparing Activity: NASA SupersedingUFGS-01 86 26.07 40 (February 2010)UNIFIED FACILITIES GUIDE SPECIFI
5、CATIONSReferences are in agreement with UMRL dated January 2012*SECTION 01 86 26.07 40RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SYSTEMS02/12*NOTE: This specification covers the AIR FORCE ARMY NASA NAVY requirements for Reliability Centered Building and Equipment Acceptance for Electrical System
6、s. The contents universally apply to electrical systems and may be utilized by other organizations, if deemed beneficial.Refer to Section 01 83 00.07 40 RELIABILITY CENTERED ACCEPTANCE FOR FACILITY SHELLS (foundations, structure, walls, openings, roofs, insulation and vapor barrier systems, etc.).Re
7、fer to Section 01 83 13.07 40 RELIABILITY CENTERED ACCEPTANCE FOR SUPERSTRUCTURE PERFORMANCE REQUIREMENTS for externally exposed structures such as communication towers, launch facilities; and partially open shelters such as those for fueling chemical storage, as well as underground special structur
8、es for explosives and ordinance.Refer to Section 01 86 12.07 40 RELIABILITY CENTERED ACCEPTANCE FOR MECHANICAL SYSTEMS.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit thi
9、s guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, sugge
10、stions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*SECTION 01 86 26.07 40 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 1 GENERAL1.1 SYSTEM DESCRIPTIONThis
11、specification establishes acceptance requirements to ensure building equipment and systems installed by the Contractor have been installed properly and contain no identifiable defects that will shorten the design life of the equipment. These requirements utilize Predictive Testing “DO“ for District
12、Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA
13、projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.information only. When used, a designation following the “G“ designation identif
14、ies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-01 Preconstruction SubmittalsQuality Control Plan; G; G, _Material, Equipment, and Fixture Lists; G; G, _SD-02 Shop DrawingsConnection Diagrams; G; G, _F
15、abrication Drawings; G; G, _Installation Drawings; G; G, _SD-03 Product DataManufacturers Catalog Data; G; G, _Equipment Foundation Data; G; G, _Specific Equipment Data; G; G, _Spare Parts List; G; G, _Warranty; G; G, _SD-05 Design DataSECTION 01 86 26.07 40 Page 4Provided by IHSNot for ResaleNo rep
16、roduction or networking permitted without license from IHS-,-,-Design Analysis and Calculations; G; G, _SD-06 Test ReportsSF6 Gas Test; G; G, _SF6 Gas Leakage Test; G; G, _Air Compressor Performance Test; G; G, _Automatic Transfer Test; G; G, _Battery Impedance Test; G; G, _Breaker Timing Test; G; G
17、, _Capacitor Bank Acceptance Test; G; G, _Capacitor Discharge Test; G; G, _Contact Resistance Test; G; G, _Continuity Test; G; G, _Fall of Potential Test; G; G, _General Battery Test; G; G, _General Charger Test; G; G, _High Voltage Test; G; G, _Infrared Thermography Test; G; G, _Insulation Oil Test
18、; G; G, _Insulation Resistance Test; G; G, _Overpotential Test; G; G, _Point to Point Test; G; G, _Power Factor Test; G; G, _Turns Ratio Test; G; G, _Ultrasonic (Airborne)Test; G; G, _Vacuum Bottle Integrity Test; G; G, _Visual Inspection; G; G, _SD-07 CertificatesCertificates; G; G, _SD-08 Manufact
19、urers InstructionsSECTION 01 86 26.07 40 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Manufacturers Instructions; G; G, _SD-10 Operation and Maintenance DataOperations and Maintenance Manuals; G; G, _SD-11 Closeout SubmittalsAcceptance Docum
20、entation; G; G, _Record Drawings; G; G, _Baseline Data Report; G; G, _1.4 DESIGN DATASubmit applicable design analysis and calculations for the equipment listed below as instructed to by the project specification. a. Batteries (General)b. Batteries (Lead-Acid)c. Battery Chargersd. Breakers: (1) Gene
21、ral (2) Air Blast (3) Air Magnetic (4) Oil (5) SF6 Gas (6) Vacuume. Cables: (1) General (2) Low Voltage (600V Maximum) (3) Medium Voltage (600V-33,000V) (4 ) High Voltage (33,000V Minimum)f. Electrical, Capacitor Banksg. Capacitors, Dry-Typeh. Capacitors, Liquid Filledi. Electrical Automatic Transfe
22、r Switchesj. Electric BussSECTION 01 86 26.07 40 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-k. Electrical Control Panelsl. Electrical Distribution Panelsm. Electrical Grounding Gridn. Electrical Lightning Protectiono. Electrical Power Cent
23、ersp. Electrical Power Suppliesq. Electrical Rectifiersr. Electrical Relayss. Electrical Starterst. Electric Switches: (1) Cutouts (2) Low Voltage Air (3) Medium issued directly to the Government. Perform corrective action that becomes necessary because of defective materials and workmanship while s
24、ystem is under warranty 7_ days after notification, unless additional time is approved by the Contracting Officer. Failure to perform repairs within the specified period of time constitutes grounds for having the corrective action and repairs performed by others and the cost billed to the Contractor
25、. Provide a 1_ year minimum contractor installation warranty.PART 2 PRODUCTS2.1 PRODUCT DATASubmit material, equipment, and fixture lists for all equipment, materials, and fixtures planned for use to complete the job before commencing work. Include at a minimum, the items description, quantity, manu
26、facturers style or catalog numbers, and specification and drawing reference numbers. Provide a complete list of construction equipment to be used.2.1.1 Manufacturer Product DataSubmit fabrication drawings for equipment and specialties consisting of fabrication and assembly details to be performed in
27、 the factory. Show connection diagrams and assemblies in switchgear fabrication drawingsSubmit for all equipment listed. Include manufacturers standard catalog data, at least 5 weeks_ prior to the purchase or installation of a particular component, highlighted to show material, size, options, equipm
28、ent performance data charts and curves, etc. in adequate detail to demonstrate compliance with contract requirements. Include manufacturers recommended installation instructions and procedures. If vibration isolation is specified for a unit, include vibration isolator literature containing catalog c
29、uts and certification that the isolation characteristics of the isolators provided meet the manufacturers recommendations. Submit for each specified component.Submit manufacturers catalog data and equipment foundation data (as applicable) for the following equipment:Include plan dimensions of founda
30、tions and relative elevations, equipment weight and operating loads, horizontal and vertical loads, horizontal and vertical clearances for installation, and size and location of anchor bolts. a. Batteries (General)b. Batteries (Lead-Acid)c. Battery Chargersd. Breakers: (1) General (2) Air Blast (3)
31、Air Magnetic (4) OilSECTION 01 86 26.07 40 Page 8Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- (5) SF6 Gas (6) Vacuume. Cables: (1) General (2) Low Voltage (600V Maximum) (3) Medium Voltage (600V-33,000V) (4) High Voltage (33,000V Minimum)f. Elect
32、rical, Capacitor Banksg. Capacitors, Dry-Typeh. Capacitors, Liquid Filledi. Electrical Automatic Transfer Switchesj. Electric Bussk. Electrical Control Panelsl. Electrical Distribution Panelsm. Electrical Grounding Gridn. Electrical Lightning Protectiono. Electrical Power Centersp. Electrical Power
33、Suppliesq. Electrical Rectifiersr. Electrical Relayss. Electrical Starterst. Electric Switches: (1) Cutouts (2) Low Voltage Air (3) Medium layout and installation details including support structures, conduit and related system components. Include on the drawings any information required to demonstr
34、ate that the system has been coordinated and will properly function within the electrical system, and show equipment relationship to other parts of the work, including clearances required for operation and maintenance.SECTION 01 86 26.07 40 Page 15Provided by IHSNot for ResaleNo reproduction or netw
35、orking permitted without license from IHS-,-,-Submit connection diagrams for electrical equipment, panels, conduit, and specialties indicating the relations and connections of devices and apparatus by showing the general physical layout of all controls, the interconnection of one system (or portion
36、of system) with another, and internal tubing, wiring, and other devices.Submit record drawings, at least 14_ days after completion of equipment installation and acceptance testing. Update electrical system drawings to reflect final record as-built conditions after all related work is completed.3.2 E
37、XAMINATIONPerform visual inspection on the equipment listed below. Correct all abnormalities or defects as directed by the Contracting Officer. a. Batteries (General)b. Batteries (Lead-Acid)c. Battery Chargersd. Breakers: (1) General (2 ) Air blast (3) Air magnetic (4) Oil (5) SF6 gas (6) Vacuume. C
38、ables: (1) General (2) Low voltage (600V Maximum) (3) Medium voltage (600V-33,000V) (4) High voltage (33,000V Minimum)f. Electrical, Capacitor Banksg. Capacitors, Dry-Typeh. Capacitors, Liquid Filledi. Electrical Automatic Transfer Switchesj. Electric Bussk. Electrical Control Panelsl. Electrical Di
39、stribution PanelsSECTION 01 86 26.07 40 Page 16Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-m. Electrical Grounding Gridn. Electrical Lightning Protectiono. Electrical Power Centersp. Electrical Power Suppliesq. Electrical Rectifiersr. Electrical
40、Relayss. Electrical Starterst. Electric Switches: (1) Cutouts (2) Low voltage air (3) Medium & high voltage air, open (4) Medium voltage air, metal enclosed (5) Medium voltage, oil (6) Medium voltage, SF6 (7) Medium voltage, vacuumu. Electrical Transformer Load Tap Changerv. Motor Control Centersw.
41、Switchgearx. Transformers3.3 FIELD QUALITY CONTROL AND ACCEPTANCE TESTING*NOTE: The acceptance criteria, as defined in this specification, may also be used to establish the required baselines for future maintenance.At the Governments option, Government may elect not to have the Contractor perform ac
42、ceptance testing, but instead the acceptance testing may be performed either by Government personnel or other designated third party personnel. This option can be exercised on a case-by-case basis. Regardless of who performs the acceptance testing, Contractor compliance with the requirements of acce
43、ptance is still mandatory.*Deliver equipment and services that meet the contract requirements and specifications. Ensure all equipment is free of latent manufacturing and installation defects, and acceptance criteria are met. Perform acceptance SECTION 01 86 26.07 40 Page 17Provided by IHSNot for Re
44、saleNo reproduction or networking permitted without license from IHS-,-,-testing as defined in this specification and the RCBEA GUIDE, using both traditional and PT&I technologies. The Government will observe and monitor the acceptance testing, analysis and documentation as part of the Governments Quality Assurance Program. Not until the requirements of acceptance are met will the equipment