REG UFGS-23 34 23 00 40-2011 HVAC POWER VENTILATORS.pdf

上传人:赵齐羽 文档编号:1019647 上传时间:2019-03-21 格式:PDF 页数:13 大小:56.53KB
下载 相关 举报
REG UFGS-23 34 23 00 40-2011 HVAC POWER VENTILATORS.pdf_第1页
第1页 / 共13页
REG UFGS-23 34 23 00 40-2011 HVAC POWER VENTILATORS.pdf_第2页
第2页 / 共13页
REG UFGS-23 34 23 00 40-2011 HVAC POWER VENTILATORS.pdf_第3页
第3页 / 共13页
REG UFGS-23 34 23 00 40-2011 HVAC POWER VENTILATORS.pdf_第4页
第4页 / 共13页
REG UFGS-23 34 23 00 40-2011 HVAC POWER VENTILATORS.pdf_第5页
第5页 / 共13页
点击查看更多>>
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 34 23.00 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-23 34 23 (February 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR CO

2、NDITIONINGSECTION 23 34 23.00 40HVAC POWER VENTILATORS02/11PART 1 GENERAL1.1 SYSTEM DESCRIPTION1.2 REFERENCES1.3 SUBMITTALS1.4 PREDICTIVE TESTING AND INSPECTION TECHNOLOGY REQUIREMENTS1.5 GENERAL REQUIREMENTS1.6 QUALITY ASSURANCEPART 2 PRODUCTS2.1 DESIGN AND FABRICATION REQUIREMENTS2.2 HOUSING STYLE

3、(S)2.3 FAN TYPE(S)2.3.1 Type C-PRV Centrifugal, Direct Drive2.3.2 Type CB-PRV Centrifugal, V-Belt Drive2.3.3 Type P-PRV Propeller, Direct Drive2.3.4 Type PB-PRV Propeller, V-Belt Drive2.3.5 Type VA-PRV Vane Axial, Direct Drive2.3.6 Type VAB-PRV Vane Axial, V-Belt Drive2.3.7 Type TA-PRV Tube Axial, D

4、irect Drive2.3.8 Type TAV-PRV Tube Axial, V-Belt Drive2.4 MATERIALS2.4.1 Aluminum Alloy2.4.2 Zinc-Coated Steel2.4.3 Fibrous Glass2.5 FAN MOTOR2.6 BASES2.7 ROOF CURBS2.8 BACK-DRAFT DAMPERS2.9 SCREENS2.10 SOUND BAFFLESPART 3 EXECUTION3.1 INSTALLATIONSECTION 23 34 23.00 40 Page 1Provided by IHSNot for

5、ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2 TESTS3.2.1 Vibration Analyzer3.3 ACCEPTANCE3.4 LUBRICATION3.5 FINAL TEST REPORTS- End of Section Table of Contents -SECTION 23 34 23.00 40 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without

6、 license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 34 23.00 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-23 34 23 (February 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION 23 34 23.00 40HVAC POWER VENTILATORS02/11

7、*NOTE: This specification covers the requirements for power roof ventilators designed to exhaust air from a building by means of a motor-driven fan.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project spe

8、cification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not bracket

9、s are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Provide drawings that indicate and schedule the following:Unit numberLocationCubic meter feet per minute airStatic pre

10、ssure kilopascal inches of waterFan revolutions per minuteType of fanType of wheelSECTION 23 34 23.00 40 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Housing styleMaximum tip speedNoise level in sonesFan motor powerDrive typeControlsType of

11、damper(s)Type of screens*1.1 SYSTEM DESCRIPTIONProvide power roof ventilators system complete with all components and accessory equipment as specified in this section.*NOTE: If Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS is not included in the project specification, i

12、nsert applicable requirements therefrom and delete the first paragraph. If Section 26 60 13.00 40 LOW-VOLTAGE MOTORS is not included in the project specification, insert applicable requirements therefrom and delete the second paragraph.*Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXH

13、AUST SYSTEMS applies to work specified in this section.Section 26 60 13.00 40 LOW-VOLTAGE MOTORS applies to this section.Submit manufacturers catalog data, including equipment and performance datafor power roof ventilator(s). As a minimum, include the following data:*NOTE: Insert the appropriate age

14、ncy in items “d“ and “f“ below if applicable, ie. Army, Navy, etc. and delete NASA.*a. Fan Typeb. Fan Specifications, including:(1) Number of rotating fan blades/vanes(2) Number of stationary fan blades/vanes(3) Rotating Speed(s)(4) Number of belts (if belt driven)SECTION 23 34 23.00 40 Page 4Provid

15、ed by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(5) Belt Lengths- measured at the pitch line (if belt driven)(6) Diameter of the drive sheave at the drive pitch line (if belt driven)(7) Diameter of the driven sheave at the drive pitch line (if belt driven)

16、c. Location of Installationd. NASA _ Identification Numbere. Date of Installation (Required or Actual Acceptance Date)f. Applicable NASA _ reference drawing number(s)1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications ar

17、e referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article.

18、 Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text are automatically deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part o

19、f this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)ASCE 7-10 (2010; Change 2010; Change 2011) Minimum Design Loads for Buildings and Other StructuresASTM INTERNATIONAL (ASTM)ASTM A653

20、/A653M (2010) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip ProcessASTM B209 (2010) Standard Specification for Aluminum and Aluminum-Alloy Sheet and PlateSECTION 23 34 23.00 40 Page 5Provided by IHSNot for ResaleNo reproducti

21、on or networking permitted without license from IHS-,-,-ASTM B209M (2010) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate (Metric)ASTM B37 (2008) Standard Specification for Aluminum for Use in Iron and Steel ManufacturerNATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA)RCBEA

22、 GUIDE (2004) NASA Reliability Centered Building and Equipment Acceptance GuideUNDERWRITERS LABORATORIES (UL)UL 705 (2004; Reprint Apr 2011) Standard for Power Ventilators1.3 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the followin

23、g list to reflect only the submittals required for the project. Keep submittals to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G”

24、if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, use a code of up to three characters

25、within the submittal tags following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Are

26、a Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is

27、required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that reviews the submittal for the Government. Submit the following i

28、n accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SECTION 23 34 23.00 40 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-SD-02 Shop DrawingsSubmit Shop Drawings for power roof ventilator systemsSubmit Installation Drawings for power roof

29、ventilator systemsSubmit Record Drawings for power roof ventilators in accordance with paragraph entitled, “General Requirements,“ of this section.SD-03 Product DataSubmit Equipment and Performance DataSubmit Manufacturers Catalog DataHousingFanMotorBasesRoof CurbsDampersScreensSound BafflesSD-06 Te

30、st ReportsTests1.4 PREDICTIVE TESTING AND INSPECTION TECHNOLOGY REQUIREMENTS*NOTE: The Predictive Testing and Inspection (PT a minimum of 400 line resolution; a frequency response range of 5 Hz-10 KHz(300-600000 cpm); the capacity to perform ensemble averaging, the capability to use a Hanning window

31、; auto-ranging frequency amplitude; a minimum amplitude accuracy over the selected frequency range of plus or minus 20 percent or plus or minus 1.5 dB.Use either stud-mounted accelerometer or mount using a rare earth, low mass magnet and sound disk (or finished surface) with the FFT analyzer to coll

32、ect data. Provide accelerometer with mass and mounting that minimally influence the frequency response of the system over the selected measurement range.3.3 ACCEPTANCEPrior to final acceptance, use precision alignment devices to demonstrate that fan and motor are aligned as specified.Prior to final

33、acceptance, verify conformance to specifications with SECTION 23 34 23.00 40 Page 12Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-vibration analysis. Provide vibration levels that are not more than .075 in/sec at 1 times run speed and at fan/blade

34、frequency, and .04 in/sec at other multiples of run speed.3.4 LUBRICATIONProvide movable parts of dampers and related operating hardware that are lubricated in accordance with manufacturers printed instructions and that operate smoothly and quietly without binding.3.5 FINAL TEST REPORTSProvide final

35、 test reports to the Contracting Officer. Provide reports with a cover letter/sheet clearly marked with the System name, Date, and the words “Final Test Reports - Forward to the Systems Engineer/Condition Monitoring Office/Predictive Testing Group for inclusion in the Maintenance Database.“ - End of Section -SECTION 23 34 23.00 40 Page 13Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1