1、*USACE / NAVFAC / AFCESA / NASA UFGS-26 56 36.00 40 (February 2013)-Preparing Activity: NASA SupersedingUFGS-26 56 36.00 40 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2013*SECTION TABLE OF CONTENTSDIVISION 26 - ELECTRICALSECTION 26 56 36

2、.00 40FLOOD LIGHTING02/13PART 1 GENERAL1.1 REFERENCES1.2 DEFINITIONS1.3 ADMINISTRATIVE REQUIREMENTS1.3.1 Pre-Installation Meeting1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Drawing Requirements1.5.1.1 Luminaire Drawings1.5.2 Design Data for Luminaires1.5.3 Standard Products1.5.3.1 Alternative Qualifica

3、tions1.5.3.2 Material and Equipment Manufacturing Date1.6 SUSTAINABLE DESIGN REQUIREMENTS1.6.1 Local/Regional Materials1.6.2 Environmental Data1.6.3 Energy Efficiency1.7 SUPPORT SERVICEPART 2 PRODUCTS2.1 PRODUCT COORDINATION2.2 PRODUCT STANDARDS2.3 FLOODLIGHTING LUMINAIRES2.4 FLUORESCENT FLOODLIGHTS

4、, EXTERIOR2.5 HIGH-INTENSITY-DISCHARGE (HID) LUMINAIRES2.5.1 Mounting Devices2.5.2 Focusing, Fusing,and Connecting2.6 QUARTZ-IODINE LUMINAIRES, SPECIAL PURPOSE2.6.1 Housing, Reflectors, and Lamps2.7 SUBSTATION-YARD LIGHTING LUMINAIRES2.7.1 Pole Mounting2.7.2 Reflector Assembly2.7.3 Wiring2.8 LAMP BA

5、LLASTSSECTION 26 56 36.00 40 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.9 SERIES CIRCUIT TRANSFORMERS2.10 LAMPS2.10.1 HID Lamps2.10.2 Low-Pressure Sodium2.10.3 High-Pressure Sodium2.10.4 Metal Halide2.10.5 Incandescent Lamps2.11 EQUIPMEN

6、T IDENTIFICATION2.11.1 Manufacturers Nameplate2.11.2 Labels2.12 FACTORY APPLIED FINISHPART 3 EXECUTION3.1 INSTALLATION3.2 FIELD TESTING3.3 WARRANTY- End of Section Table of Contents -SECTION 26 56 36.00 40 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license fro

7、m IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-26 56 36.00 40 (February 2013)-Preparing Activity: NASA SupersedingUFGS-26 56 36.00 40 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2013*SECTION 26 56 36.00 40FLOOD LIGHTING02/13*NOTE: This gu

8、ide specification covers the requirements for floodlighting fixtures and energy efficient lamps.Show a three-dimensional detail of each fixture on the drawings, with letter designation keyed to the drawings and electrical symbols describing the type, style, class, kind, and size of fixture as follow

9、s:Floodlighting fixtures, including luminaries for NEMA Type 2, 3, 4, 5, 6, and 7 beam-spread distribution patterns.On all fixture drawings indicate the materials and finishes for reflectors, refractors, diffusers, and shielding; fixture mounting details; the number, size, and description of lamps;

10、and electrical characteristics of branch-circuit or feeder connections.Use Section 26 09 23.00 40 LIGHTING CONTROL DEVICES for control devices (includes tailoring for exterior lighting).Use Section 26 56 13.00 40 LIGHTING POLES AND STANDARDS for pole or standard, including mounting and base accessor

11、ies of exterior fixtures.Use Section 26 56 19.00 40 ROADWAY LIGHTING for roadway and street lighting.Use Section 26 56 23.00 40 AREA LIGHTING for general exterior lighting.Use Section 26 55 53.00 40 SECURITY LIGHTING for security and CCTV area lighting.Adhere to UFC 1-300-02 Unified Facilities Guide

12、 Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide SECTION 26 56 36.00 40 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-specification for project speci

13、fic requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this

14、 guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: TO DOWNLOAD UFGS GRAPHICSGo to http:/www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf.*NOTE: This section contains the following sketches (Graphics) and are available in metric (SI) and U.S. Customary (IP) syste

15、m dimensions. Sketch titles and style numbers are unchanged for both types. The metric values indicated are a conversion of U.S. Customary (IP) system dimensions.Do not include list of sketches, or sketches themselves, in project specifications. Use luminaire sketches as details on drawings whenever

16、 possible. If special features are required, do not modify sketches, but indicate these changes as notes in fixture schedule. The “XL“ style numbers and dates should remain on the drawing details.Sketch No. TitleXL-2 FloodlightXL-3 Floodlight and Sports LightXL-28 Luminaire Mounting BracketsNOTE: Do

17、 not include this index in project specification.*NOTE: Show the following information on the drawings or specify in the project specifications:a. Luminaire schedule and indicate pertinent information; i.e., mounting, lamps, ballasts, and voltage.1. Type of luminaire;2. Voltage, wattage, and frequen

18、cy rating required;3. Accessories required, such as photocell, time switches, and auxiliary lamps;SECTION 26 56 36.00 40 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4. Location of poles or standards;5. Referenced sketch; and6. Extent and lo

19、cation of the work to be accomplished and wiring and equipment necessary for a complete installation.*NOTE: Demolition work that involves disposal of fluorescent and HID lamps and ballasts will require the use of Section 02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs AND MERCURY.*P

20、ART 1 GENERAL*NOTE: Including building energy performance language within this specification signals a commitment to design, build, and operate a building with superior energy performance-one whose energy use, greenhouse gas emissions, and costs-to-operate are lower than 75 percent of comparable bui

21、ldings nationwide.Designers are encouraged to include the latest EPA/DOE “Energy Star“ applicable lighting fixtures and lamps in the design, for both existing and new facilities.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The pu

22、blications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Refer

23、ence Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed be

24、low form a part of this specification to the extent referenced. The publications are referred to within the text by the SECTION 26 56 36.00 40 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-basic designation only.ASTM INTERNATIONAL (ASTM)ASTM

25、E2129 (2010) Standard Practice for Data Collection for Sustainability Assessment of Building ProductsILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IES)IES HB-10 (2011) IES Lighting HandbookINSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)IEEE C2 (2012; Errata 2012; INT 1 2012; INT 2 2012

26、; INT 3 2012) National Electrical Safety CodeIEEE Stds Dictionary (2009) IEEE Standards Dictionary: Glossary of Terms R 2009) American National Standard for Electric Lamps - High Intensity Discharge (HID) - Methods of Measuring CharacteristicsANSI C82.4 (2002) American National Standard for Ballasts

27、 for High-Intensity-Discharge and Low-Pressure Sodium (LPS) Lamps (Multiple-Supply Type)ANSI C82.9 (2010) American National Standard for High-Intensity Discharge and Low-Pressure Sodium Lamps, Ballasts and Transformers - DefinitionsANSI NEMA ANSLG C78.390 (2006) Method of Designation for Electric La

28、mps, -Miniature and Sealed-Beam Incandescent LampsNEMA 250 (2008) Enclosures for Electrical Equipment (1000 Volts Maximum)NEMA ICS 6 (1993; R 2011) EnclosuresNEMA LSD 25 (2008) Best Practices for Metal Halide Lighting Systems, Plus Questions and SECTION 26 56 36.00 40 Page 6Provided by IHSNot for Re

29、saleNo reproduction or networking permitted without license from IHS-,-,-Answers about Lamp Ruptures in Metal Halide Lighting SystemsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 70 (2011; Errata 2 2012) National Electrical CodeU.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)Energy Star (1992; R 2006) E

30、nergy Star Energy Efficiency Labeling SystemU.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)21 CFR 1040 Performance Standards for Light-Emitting ProductsUNDERWRITERS LABORATORIES (UL)UL 1029 (1994; Reprint Sep 2012) High-Intensity-Discharge Lamp BallastsUL 1598 (2008; Reprint Oct 2012) Lumin

31、aires1.2 DEFINITIONSa. Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, are as defined in IEEE Stds Dictionary.b. Average life is the time after which 50 percent will have failed and 50 percent will have survived under norma

32、l conditions.1.3 ADMINISTRATIVE REQUIREMENTS*NOTE: If Section 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS is not included in the project specification, applicable requirements there from should be inserted and the following paragraph deleted.*Section 26 00 00.00 20 BASIC ELECTRICAL MATERIA

33、LS AND METHODS applies to work specified in this section.1.3.1 Pre-Installation MeetingNo later than 30 _ days after Contract Award, the Contracting Officer will schedule a pre-installation meeting. Prior to the meeting, submit the following for review and approval:a. Submit certificates of complian

34、ce showing compliance with the following requirements:(1) Lighting-distribution curves for each type of fixture in accordance with the Illuminating Engineering Society and ANSI C78.379.SECTION 26 56 36.00 40 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license f

35、rom IHS-,-,-(2) Certification that floodlighting fixtures conform to structural, electrical, and photometric requirements.b. Submit equipment and performance data for floodlighting systems consisting of life cycle, testing, system functional flows, safety features, mechanical automated details, auto

36、matic interlocks, and such features as electrical system protective device ratings. Concurrently submit:(1) Energy Efficiency documentation(2) Environmental Datac. Submit documentation indicating distance between manufacturing facility and the project site. Indicate distance of raw material origin f

37、rom the project site. Indicate relative dollar value of local/regional materials to total dollar value of products included in project.d. Submit manufacturers catalog data for the following:(1) Floodlighting Fixtures(2) Floodlighting Luminaires(3) Fluorescent Floodlights, Exterior(4) High-Intensity-

38、Discharge (HID) Luminaires(5) Quartz-Iodine Luminaires(6) Substation-Yard Lighting Luminaires(7) Series Circuit Transformers(8) Lamp Ballasts(9) Sample Warrantye. Luminaires - Submit one sample of each luminaire type, complete with lamp and ballast. Submit one sample for each item other than luminai

39、res. Sample will be returned to the Contractor for installation in the project work.1.4 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project.The Guide Specification

40、technical editors have designated those items that require Government approval, due to their complexity or criticality, with a “G.“ Generally, other submittal items can be reviewed by the Contractors Quality Control System. Only add a “G” to an item, if the submittal is sufficiently important or com

41、plex in context of SECTION 26 56 36.00 40 Page 8Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used followin

42、g the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office

43、; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contrac