SAE ARP 5614-2014 Guidelines for Harness Critical Clamp Locator Marker Installation on Electrical Cable Assemblies《在电缆组件上安装线束关键夹定位标记的指南》.pdf

上传人:confusegate185 文档编号:1023146 上传时间:2019-03-21 格式:PDF 页数:5 大小:35.08KB
下载 相关 举报
SAE ARP 5614-2014 Guidelines for Harness Critical Clamp Locator Marker Installation on Electrical Cable Assemblies《在电缆组件上安装线束关键夹定位标记的指南》.pdf_第1页
第1页 / 共5页
SAE ARP 5614-2014 Guidelines for Harness Critical Clamp Locator Marker Installation on Electrical Cable Assemblies《在电缆组件上安装线束关键夹定位标记的指南》.pdf_第2页
第2页 / 共5页
SAE ARP 5614-2014 Guidelines for Harness Critical Clamp Locator Marker Installation on Electrical Cable Assemblies《在电缆组件上安装线束关键夹定位标记的指南》.pdf_第3页
第3页 / 共5页
SAE ARP 5614-2014 Guidelines for Harness Critical Clamp Locator Marker Installation on Electrical Cable Assemblies《在电缆组件上安装线束关键夹定位标记的指南》.pdf_第4页
第4页 / 共5页
SAE ARP 5614-2014 Guidelines for Harness Critical Clamp Locator Marker Installation on Electrical Cable Assemblies《在电缆组件上安装线束关键夹定位标记的指南》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、_ SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising there

2、from, is the sole responsibility of the user.” SAE reviews each technical report at least every five years at which time it may be revised, reaffirmed, stabilized, or cancelled. SAE invites your written comments and suggestions. Copyright 2014 SAE International All rights reserved. No part of this p

3、ublication may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of SAE. TO PLACE A DOCUMENT ORDER: Tel: 877-606-7323 (inside USA and Canada) Tel: +1 724-776-497

4、0 (outside USA) Fax: 724-776-0790 Email: CustomerServicesae.org SAE WEB ADDRESS: http:/www.sae.org SAE values your input. To provide feedback on this Technical Report, please visit http:/www.sae.org/technical/standards/ARP5614AEROSPACERECOMMENDED PRACTICEARP5614 Issued 2014-08Guidelines for Harness

5、Critical Clamp Locator Marker Installation on Electrical Cable Assemblies RATIONALE This SAE Aerospace Recommended Practice (ARP) provides information to the user community on the use of Harness Critical Clamp Locator Markers where there is an installation requirement to reduce electrical wiring and

6、 harness movement, provide slack in critical locations and maintain adequate clearance and separation from aircraft equipment and structure. In addition, the Harness Critical Marker alerts the wiring installer and service personnel that harnesses in the area need specialattention.1. SCOPE This ARP s

7、pecifies the recommended methods of marking electrical wiring and harnesses to aid in the positioning/routing of electrical wiring, harnesses and cable assemblies. 1.1 Purpose The purpose of this ARP is to provide guidance on accepted methods for marking electrical wiring and harnesses when control

8、of routing is required for structural clearance, use of service loops, and/or harness movement during ground/flight operations. 1.2 General Primary support of aircraft wiring is provided by metal cushion clamps (such as AS21919 or AS23190) and spaced at intervals not to exceed 24 inches. Harness Cri

9、tical Clamp Locator Markers are used to install the harness in the metal cushioned clamps in specific locations.In areas of minimum clearance and separation aircraft requiring Harness Critical Clamp Locator Markers, electrical wiring and harnesses may require additional support and protection to pre

10、vent chafing, mechanical strain that could lead to arcing and/or damage/breakage to control cables, from associated moving equipment and structure. Preventing interference between electrical wiring, harnesses and equipment that slide or travel by design (shock and vibration mounted equipment or equi

11、pment required to be moved (slide) without being disconnected) is also required. Standard practice methods to prevent chafing are required in addition to primary support not in lieu of primary support. In addition to being supported in areas of minimum clearances and separation requiring Harness Cri

12、tical Clamp Locator Markers, electrical wiring and cable assemblies must also be protected. Shielded or metal braid harnesses may require protective non-metallic covering in the event of loosening or failure of the primary support. SAE INTERNATIONAL ARP5614 Page 2 of 5 2. REFERENCES The following pu

13、blications form a part of this document to the extent specified herein. The latest issue of SAE publications shall apply. The applicable issue of other publications shall be the issue in effect on the date of the purchase order. In the event of conflict between the text of this document and referenc

14、es cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 2.1 SAE Publications Available from SAE International, 400 Commonwealth Drive, Warrendale, PA 15096-0001, Tel: 877

15、-606-7323 (inside USA and Canada) or 724-776-4970 (outside USA), www.sae.org.AS4373 Test Methods for Insulated Electric Wire AS5942 Marking of Electrical Insulating Materials AS50881 Wiring, Aerospace Vehicle AMS-DTL-23053/4 Insulation Sleeving, Electrical, Heat Shrinkable, Polyolefin, Dual-Wall, Ou

16、ter Wall Crosslinked AMS-DTL-23053/5 Insulation Sleeving, Electrical, Heat Shrinkable, Polyolefin, Flexible, Crosslinked AMS-DTL-23053/18 Insulation Sleeving, Electrical, Heat Shrinkable, Modified Fluoropolymer, Crosslinked 2.2 Government Publications Available from DLA Document Services, Building 4

17、/D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Tel: 215-697-6396, http:/quicksearch.dla.mil/.MIL-HDBK-522 Guidelines for Inspection of Aircraft Electrical Wiring Interconnect Systems A-A-3165 Lacquer, Gloss, For Aircraft Use 2.3 FAA Publications Available from Federal Aviation Administration,

18、800 Independence Avenue, SW, Washington, DC 20591, Tel: 866-835-5322, www.faa.gov.AC 25.1701-1 Certification of Electrical Wiring Interconnection Systems on Transport Category AirplanesAC 43.13-1 Acceptable Methods, Techniques, and Practices - Aircraft Inspection and Repair 3. REQUIREMENTS 3.1 Prote

19、ction and Support Aircraft wiring should be supported to prevent chafing, mechanical strain or work hardening, arcing or overheating, interference between wiring and other components and movement in high vibration areas. Guidance for proper aircraft wiring and harness support can be found in AS50881

20、, MIL-HDBK-522, and FAA AC 25 series and 43.13. SAE INTERNATIONAL ARP5614 Page 3 of 5 3.2 Harness Critical Clamp Locator Marker Location Electrical wiring and harnesses should be permanently marked when there is an installation requirement to control the electrical wiring and cable assembly movement

21、 or slack in critical locations, and maintain specified adequate clearance and separation from equipment and structure. Harness Critical Clamp Locator Markers may be one to two inches wide. Color and location should be specified by the design organization and approved by the procuring activity. When

22、 the clamp is installed over the marker, the marker should be visible on both sides of the clamp, thus ensuring the required harness location in relation to the clamp. When required, clamp locator markers, as a minimum, should be placed at each harness endpoint (i.e., last clamp prior to termination

23、) and at the mid-point harness clamp locations. Additional Harness Critical Clamp Locator Markers should be added as necessary, for areas in close proximity to fluid carrying lines, tubes, hoses, moving parts and components. For harnesses that flex/move or connect with moving components or surfaces

24、that flex/move, Harness Critical Clamp Locator Markers should be located at the last clamp point prior to area of harness movement. When required at harness breakouts, Harness Critical Clamp Locator Markers should be located at the clamp position closest to the breakout point except for breakouts th

25、at occur within 18 inches of a previously established Harness Critical Clamp Locator Marker location. A harness with extra length for removal and maintenance of equipment maybe required. The service loop length depends on the needs of the equipment and the length is controlled by the use of Harness

26、Critical Clamp Locator Marker. 3.3 Materials3.3.1 Protected Harnesses A variety of types of marking methods can be used for marking electrical cable assemblies prior to installation. Note that these markings are permanent and if an error is made in Harness Critical Clamp Locator Marker location addi

27、tional maintenance or replacement of harness overbraid, tape wrap, etc., may be required. 3.3.1.1 Lacquer A-A-3165 or equivalent applied by brush or spray preceded by masking to limit area coverage. Remove masking after lacquer has dried. 3.3.1.2 Marker Pen OPCO Marker or equivalent. 3.3.2 Open/Prot

28、ected Harnesses 3.3.2.1 Heat Shrink AMS-DTL-23053/5 (Class 1 or 3) or /18 are recommended in lieu of AMS-DTL-23053/4 for open harness application. The maximum temperature ratings of AMS-DTL-23053/4 (Class 2 or 3), /5 (Class 1 or 3) and /18 (Class 2 and 3) are 110 C, 125/135 C and 150 C, respectively

29、. In addition, cross-linked fluoropolymer heat shrink or equivalent is also suitable and has a maximum temperature rating of 225 C. AMS-DTL-23053 heat shrink with hot-melt adhesive of a contrasting color may be used as a Harness Critical Clamp Locator Marker. AMS-DTL-23053/4 heat shrink is not recom

30、mended on an open harness or under a clamp. The adhesive of the AMS-DTL-23053/4 heat shrink may flow throughout the open harness, and result in damage to the harness during repair of individual wire and stiffening of the harness, preventing a smooth radius under the clamp. SAE INTERNATIONAL ARP5614

31、Page 4 of 5 3.3.2.2 Tape/Wrap Around Marker The following tape/wrap around markers are considered suitable for use as Harness Critical Clamp Locator Markers: a. Polyvinyl fluoride - Maximum temperature rating 130 C. b. Cross-linked polyolefin - Maximum temperature rating 175 C. c. Top coated polyvin

32、yl fluoride - Maximum temperature rating 135 C. d. Polyurethane - Maximum temperature rating 121 C. e. Polyimide - Maximum temperature rating 180 C. 3.3.3 Material Selection When selecting heat shrink or tape/wrap markers for a particular application, maximum operating temperature, AS5942 marking re

33、quirements and AS4373 (Test Method 711) durability and legibility testing should be considered. In addition, adhesive material used in the heat shrink or tape/wrap markers should be considered in regards its minimum/maximum operating temperature, adhesion to the harness to prevent movement of the ma

34、rker, stiffening of the harness and penetration of the adhesive material into the harness which may affect maintenance or repair of the harness. 3.4 Maintenance Periodic maintenance inspections of the visibility and legibility and cleanliness of Harness Critical Clamp Locator Markers should be perfo

35、rmed. These inspections should be scheduled as part of already required wiring inspections or other required maintenance inspections to avoid a separate standalone inspection. On aircraft undergoing maintenance, marker placement outside the clamp may be required to eliminate localized chafing since

36、every aircraft wiring installation has unique aspects. Adjustments to the Harness Critical Clamp Locator Marker locations must be approved by the aircraft cognizant engineering authority. Care needs to be taken to ensure overall wire harness installation requirements are not compromised when adjusti

37、ng the Harness Critical Clamp Locator Marker position in relation to the clamp location. 4. NOTES 4.1 Definitions 4.1.1 Chafing Chafing is the repeated relative motion between electrical wiring and harnesses or between a wiring system component and structure, equipment or moving mechanical parts. Th

38、is repeated relative movement may result in a rubbing action that causes degradation of the wiring insulation and cause mechanical or electrical failure during the aerospace vehicles specified service life. Caution, care and attention to detail during the installation of electrical wiring and cable

39、assembliesshould be taken to prevent chafing. 4.1.2 Clamp Primary support of wiring shall be provided by metal cushion clamps and plastic clamps in accordance with AS23190, AS21919, spaced at intervals not to exceed 24 inches. AS23190/4 is the preferred wiring support clamp.4.1.3 Harness An assembly

40、 of any number of wires, electrical/optical cables and/or groups and their terminations which is designed and fabricated so as to allow for installation and removal as a unit. A harness may be an open harness or a protected harness. SAE INTERNATIONAL ARP5614 Page 5 of 5 4.1.3.1 Open Harness Any comb

41、ination of electrical wiring and cable assemblies without an outer protective cover. 4.1.3.2 Protected HarnessA harness that employs some overall outer covering to provide additional mechanical protection for the wires and/or electrical/optical cables contained therein. The added protection may cons

42、ist of an overbraid, tape wrap, conduit or some other form of protection. 4.1.4 Harness Critical Clamp Locator Markers Markers are used to identify specific clamping or structural reference locations. Markers are permanent or semi-permanent. Markers can be paint, tape or sleeving attached to electri

43、cal wires, harnesses, and cable bundles. 4.2 A change bar (l) located in the left margin is for the convenience of the user in locating areas where technical revisions,not editorial changes, have been made to the previous issue of this document. An (R) symbol to the left of the document title indica

44、tes a complete revision of the document, including technical revisions. Change bars and (R) are not used in original publications, nor in documents that contain editorial changes only. PREPARED BY SAE COMMITTEE AE-8A, ELECTRICAL WIRING & FIBER OPTIC INTERCONNECT SYSTEMS INSTALLATION OF COMMITTEE AE-8, AEROSPACE ELECTRICAL/ELECTRONIC DISTRIBUTION SYSTEMS

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1