1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. Clause SABS 0120 : Part 2 Section AH-1986 General (structural) PART 2 : PROJECT SPECIFlCATION SECTION A14 CONTENTS Page Number ESSENTIAL PROJECT SPECIFIC
4、ATION CLAUSES 1 ESSENTIAL DATA . 1 ADDITIONAL CLAIJSES . 1 General 1 Normal Projects 1 Contract for fabrication and delivery only . 1 Subeconomic a11d Labour-based Projects 2 I Second Revision March 1986 This section of the code supersedes I SN1S 0120 : Part l : Section AI*-1983 Approved by the COUN
5、CIL OP THE SOUTll AFRICAN BUREAU OF STANDARDS 1 SAAS 1200 Ail : GENERAL (STRUCTlJRAL) SAnS 0120 : Part 2 Sect.ion AII-1986 General (structural) NOTE a) Number Psli clauses in Portion 2 of the project specification in the sequence in which the clauses to which they relate appear in SABS 1200 All. b)
6、The clause number(s) given at the beginning or after the heading of a clause is/are, unless otherwise stated, the number(s) of the relevant. clause(s) of SARS 1200 All. ESSENTIN, PROJECT SPEClFlCATION CLAUSES Set out suitable clauses in Portion 2 of the project specificat.ion to provide essential in
7、formation as follows : a) (Subclause 8.1.3.1) Where an office and facilities are required for the engineer, set out the requirements in a suitable project specification clause. (See SABS 1200 AB) and Sections AB of Part 2 and Part 3 of the code. ) b) (Subclause 8.2.2) State the cont-ract pricc adjus
8、tment. formula that will be applicable if the formula and conditions given are not acceptable. (Sec also Subclause 1.2.1 of Section All of Part 3 of the code.) ESSENTIAL DATA The availability of certain essential data may affect the prices tendered. Except where such data have been given in the sche
9、dule or on the tender drawings, set out suitable clauses covering items such as the following in Portion 2 of the project specification: a) (Subclause 6.2) Set out the details where another degree of accuracy is required (if not shown on the drawings). b) (Subclause 8.1.1) If any item in the schedul
10、e is not measured in accordance with Civil Engineerin uantities2) and this is not stated elsewhere (e.g. in Clause 8 of an applicable standardized specifi:ation or the preamble to the schedule), include a clause to state how t.he item has been measured. C) (Subclauses 8.1.3 and 8.2.4) Where no preli
11、ndrmry and general items are scheduled and the engineer requires that the contractors rates for the work items scheduled are to cover all costs of a prelimiiiary and general nature in addition to the cost of the operations specified for such items in SABS 1200 H3), include in the project specificati
12、on d suitable PSAIi clause that states that the provisions of Suhclause 8.3 of SABS 1200 AH will not apply and refer to the relevant PSH subclause that sets out the engineers requirements in this regard. d) (Subclause 8.2.2) Except where the contract iicludcs a suitable appendix to the tender or a s
13、pecial condition of contract, include and complete the following as an appendix to the project specification: Excluded items R M shall be % L shall be 2 . LW shall be % . Lb shall be % e) (Subclause 8.4) See Subclauses 0.5-8.8 of SAnS 1200 n4), and Suhclauses 2. l (b) , (c) and (d) of Section A. AUD
14、ITIONAL CLAUSES GENEFAL. Where it is necessary to amplify or otherwise to vary the terms of SABS 1200 All to render them suitable for use in projects to be carried out in particular locations or under particular circumstances, include in Portion 2 oi the project specification clauses dealing wit.11
15、matters other than those covered by Clauses 1 and 2 above. NORMAL PROJECTS NOTE: To meet requirements imposed by various norms of economic development, projects are classified as normal, prestige, subeconomic and labour-based projects (see Clause 4 of the Introduction to Part 3 of the code . Contrac
16、t for Fahrication and Delivery only. (See also Subclause 3.1 of Section HE of Part 2 of the code.) Where the contract-or is not required to carry out any work on the site of the works, i.e. where the contract covers only shop details, fabrication, assembly and the delivery of an assembled structure
17、to site ready for erection by others, include clauses such as the following in the project. specification: PSAtl 1.1 Contractors Office, Stores and Services not Required (Subclauses 4.1 and 4.2). As the . is to be constructed in the Contmct.ors yard and delivered as a completed structare, Subclauses
18、 4.1 and 4.2 of SADS 1200 Ali are riot applicable. - I) Engineers office. ) The standard system of measurement of civil engineerirg quantities for South Africa and South West Africa, published by the South African Institution of Civil Enyineers and referred to as CEQ. 3) Structural steelwork. 4) Gen
19、eral. shUS 0120 : Part 2 Section AH-1986 General (structural) PSNI 1.2 Setting Gut of the works (Subclause 5.2). The terns of Subclause 5.2 are not applicable to the Contract. pSi1 1.3 Measuremcmt and Payment (Preliminary and General) (Subclauses 8.1.3, 8.2.4 and 8.3.1) a) AS the Contract covers the
20、 provision of a single item and covers goods that will be manufactured entirely in the suppliers works and will be complete when delivered, provision has not been made in the schedule for preliniinary and general charges and Subclauses 8.1.3, 8.2.4 and 8.3.1 of SABS l200 AH are not applicable. b) The provisions of Subclause 8.4 of SALE 1200 At1 are not applicable to the Contract 3.3 SUUECONOMIC Aliu LAnOUR-BASED PROJECTS. See Subclauses 3.4 and 3.5 of Section B.