SANS 10120-5 AB-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section AB E.pdf

上传人:confusegate185 文档编号:1028588 上传时间:2019-03-24 格式:PDF 页数:4 大小:178.35KB
下载 相关 举报
SANS 10120-5 AB-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section AB E.pdf_第1页
第1页 / 共4页
SANS 10120-5 AB-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section AB E.pdf_第2页
第2页 / 共4页
SANS 10120-5 AB-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section AB E.pdf_第3页
第3页 / 共4页
SANS 10120-5 AB-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section AB E.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA

2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any

3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. snljs olru : tart 5 Section AR-198tr XII ieei- P; off i :F C l ause PART 5 : CONTRACT AIMINISTRATlON SECTION M CONTEXTS START Ult CONSTMICTION 1 General

4、1 IMMEDIATELY IWTEH TllE IIANUING OVER OY THE SlIE . 1 Nameboards 1 DURING CONSTIWCTION I. Mcthods of Const.ruction . 1 Care of ecpipelrt 1 Administration 1 Telephones . 1 Care of survey equipment . 1 Losses of office furnishings and laboratory and survey equipment . . . . . . . . . . . . . 1 QUALIT

5、Y CONTHOL AND OTllER CONSIDERATLONS 1 Second Revision March 1986 This section of the code supersedes SARS 01.20 : Part 5 : Section AB-l982 SABS 1200 AB : ENGINEERS OFFICE NOTE The clause number(s) glven at the begnnmg or after the heading of a clause Ware, unless otherwrse stated, the number(s) of t

6、he relevant clause(s) of SABS 1200 AB START OF CONSTRUCTION GENERAL. For the purposes of this part of the code, contract administration starts with instructions to the contractor to commence work as set out in Subclause 4.1 of the Introduction. IMMEDIATELY AFTER THE HANDING OVER OF THE SITE NAMEBOAR

7、DS The engineer should provide details for the wording that is to appear on nameboards (See also l 3 2(a) of Secaon AB of Part 3 of the code ) DURING CONSTRUCTION METHODS OF CONSTRUCTION Care of Eauipment. The contractor should ensure that construction methods are such that there is no risk of equip

8、ment being lost or damaged. (See also 3.2.2 and 3.2 3 below.) ADMINISTRATION Telephones Subclause 4 1 of SABS 1200 AB requires the contractor to apply to the Department of Posts and Telecommuncations for the installatron of telephones for hrmself and for the engrneer thus establshing that the contra

9、ctor is responsble for payment of accounts to the sad Department and for all dealngs wth that Department However he IS not required to bear the cost of renting the ergmeers telephone or of calls made by the engineer (see Subclause 5 4 of SABS 1200 AB) The engineer should therefore arrange for the em

10、ployer to refund direct to the contractor the cost of the engineers telephone calls and telephone rental The cost of the contractor S telephone calls and rental are under the control of and are the responsbility of the contractor Care of Survev Fwiprnent (See Subclause 3.2.4 (PSAB 3) of Section AB o

11、f Part 2 of the code). Although the contractor is required to insure survey instruments against loss or damage and is under an obligation to replace them when they are for any reason removed from the works, the engineer should take proper care of the Instruments, both because he will be inconvenienc

12、ed while damaged or lost rnstruments are being replaced and the damage or loss investigated, and because WE contract does not prevent the insurance company from suing the engineer for negligence. l osses of Office Furnishinas and laborato and Suwev Eauiment (Subclause 3.2, and Clauses PSAB 2 and 3 i

13、n Subclauses 3.2.3 and 3.2.4 of Section AB of Part 2 of the code). As the contractor is entitled to demand the replacement of or payment at replacement cost in respect of any items that are not returned to him when the works are completed, the engineer should obtain detaled receipts when the various ittsms are returned. QUALITY CONTROL AND OTHER CONSIDERATIONS The relevant recommendations of SABS 01 57 should be applied l) Quality management systems.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1