1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. Clause SABS 0120 : Part 5 Sect ion All-l Wh General (small dams) PART 5 : CONTRACT ADM1HlSTRATIOl4 SECTION AD CONTEerrS Page N&r . START OF CONSTRUCTION
4、1 General . 1 IMMEDIATELY AFTER THE HANDING OVER OF THE SITE l Access to Site l DURING CONSTRUCTION 1 Methods of Construction . 1 Administration 1 QUALITY CONTROL AND GTHER CCWSIDERATIONS 1 First Revision March 1986 This section of the code supersedes SABS OlZd : Part 5 : Sect-ion AD-1984 Approved b
5、y the COUNCIL OF THE soum AFRICAN BUREAU OF STANDARDS ISBN 0826-07627-0 SARS 0120 : Part 5 Section AD-1986 General (small dams) SABS l200 AD : GENERAL (SMALL D=) NOTE: The clause number(s) given at the beginning or after the heading of a clause is/are, unless otherwise stated, the n&r(s) of the rele
6、vant clause(s) of SABS 1200 AD. START OF COlPSTRUCTION GENERAL. For the purposes of this part of the code, contract administration starts with instructions to the contractor to coraoence work as set out in Subclause 4.1 of the Introduction. IMUEDIATELY AFTER THE HANDING OVER OF THE SITE ACCESS M SIT
7、E. Except where the contract documents have dealt adequately with all aspects of access to the sits required in term of Subclauses 1.1.1, 1.2.1 and 1.3.2 of Section AD of Part 3 of the code, the contractor should take steps to locate access to the site and establish the identity of the owner (S) or
8、the local authority or both, as applicable, and the occupier(s). The contractor should advise the owner(s) or the local authority or both, as applicable, and the occupier(s), of the program and of the loads that are expected to be moved along the roads. DURING CONSTRUtTION METHODS OF CONSTFzWTION. T
9、he engineer and the contractor should take the appropriate action recommended in Section A and applicable to the construction of a small dam. ADHINISTRATION. The engineer and the contractor sbuld take the appropriate action recommended in Section A and applicable to the construction of a mall dam. QUALITY CONTROL AND OTHER CONSIDERATIONS The relevant recornsrendations of SABS 0157) should be applied to the construction work and the administration of the contract. 1) Quality management systems.