TIA EIA IS-826 6-2000 Wireless Intelligent Network Capabilities for Pre-Paid Charging Chapter 6 Modifications to TIA EIA-41 6-D Signaling Procedures《预付费业务无线智能网络功能 第6章 TIA EIA-41 6-.pdf

上传人:bowdiet140 文档编号:1059447 上传时间:2019-03-31 格式:PDF 页数:92 大小:3.61MB
下载 相关 举报
TIA EIA IS-826 6-2000 Wireless Intelligent Network Capabilities for Pre-Paid Charging Chapter 6 Modifications to TIA EIA-41 6-D Signaling Procedures《预付费业务无线智能网络功能 第6章 TIA EIA-41 6-.pdf_第1页
第1页 / 共92页
TIA EIA IS-826 6-2000 Wireless Intelligent Network Capabilities for Pre-Paid Charging Chapter 6 Modifications to TIA EIA-41 6-D Signaling Procedures《预付费业务无线智能网络功能 第6章 TIA EIA-41 6-.pdf_第2页
第2页 / 共92页
TIA EIA IS-826 6-2000 Wireless Intelligent Network Capabilities for Pre-Paid Charging Chapter 6 Modifications to TIA EIA-41 6-D Signaling Procedures《预付费业务无线智能网络功能 第6章 TIA EIA-41 6-.pdf_第3页
第3页 / 共92页
TIA EIA IS-826 6-2000 Wireless Intelligent Network Capabilities for Pre-Paid Charging Chapter 6 Modifications to TIA EIA-41 6-D Signaling Procedures《预付费业务无线智能网络功能 第6章 TIA EIA-41 6-.pdf_第4页
第4页 / 共92页
TIA EIA IS-826 6-2000 Wireless Intelligent Network Capabilities for Pre-Paid Charging Chapter 6 Modifications to TIA EIA-41 6-D Signaling Procedures《预付费业务无线智能网络功能 第6章 TIA EIA-41 6-.pdf_第5页
第5页 / 共92页
点击查看更多>>
资源描述

1、TIA/EIA INTERIM STANDARD Wireless Intelligent Network Capabilities for Pre-Paid Charging Chapter 6 Modifications to TIMEIA-41.6-D Signaling Procedures TIMEIMIS-826.6 AUGUST 2000 TELECOMMUNICATIONS INDUSTRY ASSOCIATION Representing the telecommunications indushy in association with the Electronic Ind

2、ustries Aiance Elsctrrrnr industrim Alliance NOTICE TIA/EIA Engineering Standards and Publications are designed to serve the public interest through eliminating misunderstandings between manufacturers and purchasers, facilitating interchangeability and improvement of products, and assisting the purc

3、haser in selecting and obtaining with minimum delay the proper product for his particular need. Existence of such Standards and Publications shall not in any respect preclude any member or nonmember of TIA/EIA from manufacturing or selling products not conforming to such Standards and Publications,

4、nor shall the existence of such Standards and Publications preclude their voluntary use by those other than TIA/EIA members, whether the standard is to be used either domestically or internationally. Standards and Publications are adopted by TIA/EIA in accordance with the American National Standards

5、 Institute (ANSI) patent policy. By such action, TIA/EIA does not assume any liability to any patent owner, nor does it assume any obligation whatever to parties adopting the Standard or Publication. TIA/EIA INTERIM STANDARDS TIA/EIA Interim Standards contain information deemed to be of technical va

6、lue to the industry, and are published at the request of the originating Committee without necessarily following the rigorous public review and resolution of comments which is a procedural part of the development of a TIA/EIA Standard. TIA/EIA Interim Standards should be reviewed on an annual basis

7、by the formulating Committee and a decision made on whether to proceed to develop a TIA/EIA Standard on this subject. TIA/EIA Interim Standards must be cancelled by the Committee and removed from the TIA/EIA Standards Catalog before the end of their third year of existence. Publication of this TIA/E

8、IA Interim Standard for trial use and comment has been approved by the Telecommunications Industry Association. Distribution of this TIA/EIA Interim Standard for comment shall not continue beyond 36 months from the date of publication. It is expected that following this 36 month period, this TIA/EIA

9、 Interim Standard, revised as necessary, will be submitted to the American National Standards Institute for approval as an American National Standard. Suggestions for revision should be directed to: Standards , PLW d II * 9 1 1, N11, *NI!): dI p -r i- -e for #SP . I.I . . -22 (”11 4 3 11 tc - ?l _.,

10、I prxezz :33. -. - 9 - 9-1 - 9-1-1 9-1-1-1 - 9- 1-1-2 7112 Y 1FEtfffFthe first digit : IF there are at least two parties to the conference call: IF the T-Disconnect trigger is armed for this leg: 4-1-1 4-1-1-a 4- 1- 1-a- 1 4- 1- 1-a-2 4-1-1-a-3 Execute the “MSC Check of Serial Trigger Limit” task (s

11、ee 6.X). Set the TripgerType parameter to indicate T-Disconnect. Include the Releasecause parameter set to indicate Commanded Disconnect. Execute the “MSC Initiating a TDisconnect” task (see 4.X.1). 4- 1- 1-a-4 4-1-1-b 4- 1- 1-b- 1 4-1-1-b-2 4-1-1-b-3 ELSEIF the O-Disconnect trigger is armed for thi

12、s leg: Execute the “MSC Check of Serial Trigger Limit” task (see 6.X). Set the TripgerType parameter to indicate O-Disconnect. Include the Releasecause parameter set to indicate Commanded Disconnect. Execute the “MSC Initiating an ODisconnect” task (see 4.V.1). 4-1-1-b-4 4-1-1-c ENDIF. 4- 1- 1- 1 4-

13、1-2 ELSE: 4- 1-2- 1 4-1-3 ENDIF. Disconnect the conference party that has been connected for the shortest period of time. Disconnect the call by executing the “Commanded Disconnect” task (see 3.4.3). 4-2 ENDIF. 5 5-1 5-2 5-2-1 5-3 5-3-1 5-4 5-4- 1 5-5 5-5-1 5-5-2 Bridge leg(s) to conference call: Ex

14、tend the call leg with the routing instructions. IF Conference Calling is invoked (Le., a ConferenceCallingIndicator parameter is received indicating more than 2 parties): Add the leg to a conference circuit. ELSEIF call is only a two-way call AND IF a three-way calling circuit is available: Bridge

15、the leg to a three-way calling circuit. ELSEIF the call is only a one-way call: Connect the call leg to the calling subscriber. ELSE (an error condition has occurred): Drop the newly extended leg. Play an appropriate announcement or tone. 5-6 ENDIF. 6 6-1 Drop leg on busy or routing failure: Extend

16、the call leg with the routing instructions. TINEIA-41.6-D Modifications 6-15 3.2 Origination Call Tasks TINEINIS-826 6-2 Add the leg to a simultaneous alerting bridge and drop the leg automatically should the leg not be routable or should the leg reach a busy party or should another leg be answered

17、or should the call be abandoned. a a-1 Release leg and redirect subscriber: Release all call legs except the subscriber call leg by executing the “Commanded Disconnect” task (see 3.4.3). b Disconnect all call legs: b-1 Disconnect all call legs by executing the “Commanded Disconnect” task (see 3.4.3)

18、. 7 DEFAULT: 7-1 (ignore the action code.) 8 ENDCASE. 9 Return to the calling task. 3.3 TERMINATING CALL TASKS 3.3.1 Incoming Call Attempt (TINEINIS-771, page 6-13) When an MSC receives a call, it shall do the following: 1 1-1 Include TerminationAccessType parameter set to indicate a RemoteFeatureCo

19、ntrolPort. 1-2 Execute the “MSC Initiating a Location Request” task (see 4.28.1) to set the PointOfReturn. 2 2-1 2-1-1 2-2 2-2- 1 2-2-2 Exit this task. IF call is an RFC port: ELSEIF call is to a potential TLDN: IF the call is to an assigned TLDN: ELSE (including the calls to an unassigned TLDN): GO

20、T0 “TLDN Call Amval” in the “Wait for TLDN Call” task (see 3.3.2). Execute “Apply Access Denial Treatment” task (see 3.4.5). 2-3 ENDIF. 3 W-Wc-11 i- 31 -: 32 Exec- . a Lx-zt” tick (gee 4.28.1) tc -et the 33 p Fkr i- =criF tepP;& 3311 PQllP- 33A w w. 33A 1 PQllP- lMS busy or call pending can be defin

21、ed as either a) actual calls in the MSC or b) a combination of actual calls in the MSC or TLDNs assigned. Choice b) uses less of the call redirection procedures and thereby routes calls faster. Choice a) handles abandoned calls more properly. TINEIA-41.6-D Modifications 6-23 3.3 Terminating Call Tas

22、ks TINEINIS-826 -. 2-2-a 2-2-a-1 2-2-a-2 IF the Terminatina Resource Available trigger has been armed for the MS: Execute the “MSC Check of Serial Trigger Limit” task see 6.X). Execute the “MSC Initiating a Facility Selected And Available” task see 4.E.1). 2-2-b ENDIF. 2-2-6 2-2-7 2-2-7-1 GOT0 Await

23、 Answer. 2-2-8 Busy MS Detected: T-Busy DP 2-2-8-1 Execute the “MSC CW Terminating Call Invocation” task (see 5.7.4). IF Call Waiting is accepted: ELSE (Call Waiting was not accepted, the MS is busy): IF a Trigger Address for the T Busv trigger has been received for the MS OR IF the MS has activated

24、 Call Forwarding-Busy or has the Busy TerminationTriggers parameter set to launch a RedirectionRequest or LTransferToNumberRequest or T Busy: 2-2-8-1-1 2-2-8- 1-2 Include the RedirectionReason parameter set to Busy. IF this call has requested the None Reachable termination trigger AND IF this is the

25、 last leg AND IF a Grouphformation parameter was received: 2-2-8- 1-2- 1 2-2-8-1-3 2-2-8- 1-3- 1 2-2-8- 1-4 ENDIF. 2-2-8- 1-5 2-2-8-1-5-1 2-2-8- 1-5-1-1 2-2-8- 1-5-2 ELSE: 2-2-8-1-5-2-1 Include the Grouphformation parameter. Include the LegInformation parameter. ELSEIF the LegInformation parameter w

26、as received: IF the call arrived via Call Delivery: IF the Originating MSC is provisioned for call redirection: Execute the “MSC Initiating a Redirection Request” task (see 4.36.1). IF the TriggerAddressList parameter includes a trigger address for the T Busv trigger: Execute the “MSC Check of Seria

27、l Trigger Limit” task see 6.X). Execute the “MSC Initiating a TBusy” task see 4.M.1). 2-2-8- 1-5-2- 1-1 2-2-8-1-5-2-1-2 2-2-8- 1-5-2-2 ELSE: 2-2-8- 1-5-2-2-1 Execute the “MSC Check of Serial Trigger Limit” task see 6.X). Execute the “MSC Initiating a Transfer-To-Number Reauest” task see 4.49.1). 2-2

28、-8- 1-5-2-2-2 2-2-8- 1-5-2-3 ENDIF. for Tn (”11 4.49.1). 2-2-8-1-5-3 ENDIF. 2-2- 8- 1 - 6 ELSE (call did not arrive via Call Delivery): 3 4 5 6 7 8 9 10 11 12 13 14 15 I 18 19 a 21 22 23 24 25 28 27 2% 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 56 56 57 58 58 60 3.3 Terminating Call Tasks 6-24 TINEIA-41.6-D Modifications

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1