TIA-102 CAED-2013 Project 25 Conformance Profiles for Advanced Trunked Operations.pdf

上传人:赵齐羽 文档编号:1059984 上传时间:2019-03-31 格式:PDF 页数:232 大小:1.45MB
下载 相关 举报
TIA-102 CAED-2013 Project 25 Conformance Profiles for Advanced Trunked Operations.pdf_第1页
第1页 / 共232页
TIA-102 CAED-2013 Project 25 Conformance Profiles for Advanced Trunked Operations.pdf_第2页
第2页 / 共232页
TIA-102 CAED-2013 Project 25 Conformance Profiles for Advanced Trunked Operations.pdf_第3页
第3页 / 共232页
TIA-102 CAED-2013 Project 25 Conformance Profiles for Advanced Trunked Operations.pdf_第4页
第4页 / 共232页
TIA-102 CAED-2013 Project 25 Conformance Profiles for Advanced Trunked Operations.pdf_第5页
第5页 / 共232页
点击查看更多>>
资源描述

1、 TIA-102.CAED November 2013Project 25 Conformance Profiles for Advanced Trunked Operations NOTICE TIA Engineering Standards and Publications are designed to serve the public interest through eliminating misunderstandings between manufacturers and purchasers, facilitating interchangeability and impro

2、vement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for their particular need. The existence of such Standards and Publications shall not in any respect preclude any member or non-member of TIA from manufacturing or selling products not co

3、nforming to such Standards and Publications. Neither shall the existence of such Standards and Publications preclude their voluntary use by Non-TIA members, either domestically or internationally. Standards and Publications are adopted by TIA in accordance with the American National Standards Instit

4、ute (ANSI) patent policy. By such action, TIA does not assume any liability to any patent owner, nor does it assume any obligation whatever to parties adopting the Standard or Publication. This Standard does not purport to address all safety problems associated with its use or all applicable regulat

5、ory requirements. It is the responsibility of the user of this Standard to establish appropriate safety and health practices and to determine the applicability of regulatory limitations before its use. (From Project No. TIA-PN-102.CAED, formulated under the cognizance of the TIA TR-8 Mobile and Pers

6、onal Private Radio TR-8.10 Subcommittee on Trunking and Conventional Control). Published by TELECOMMUNICATIONS INDUSTRY ASSOCIATION Technology (b) there is no assurance that the Document will be approved by any Committee of TIA or any other body in its present or any other form; (c) the Document may

7、 be amended, modified or changed in the standards development or any editing process. The use or practice of contents of this Document may involve the use of intellectual property rights (“IPR”), including pending or issued patents, or copyrights, owned by one or more parties. TIA makes no search or

8、 investigation for IPR. When IPR consisting of patents and published pending patent applications are claimed and called to TIAs attention, a statement from the holder thereof is requested, all in accordance with the Manual. TIA takes no position with reference to, and disclaims any obligation to inv

9、estigate or inquire into, the scope or validity of any claims of IPR. TIA will neither be a party to discussions of any licensing terms or conditions, which are instead left to the parties involved, nor will TIA opine or judge whether proposed licensing terms or conditions are reasonable or non-disc

10、riminatory. TIA does not warrant or represent that procedures or practices suggested or provided in the Manual have been complied with as respects the Document or its contents. If the Document contains one or more Normative References to a document published by another organization (“other SSO”) eng

11、aged in the formulation, development or publication of standards (whether designated as a standard, specification, recommendation or otherwise), whether such reference consists of mandatory, alternate or optional elements (as defined in the TIA Engineering Manual, 4thedition) then (i) TIA disclaims

12、any duty or obligation to search or investigate the records of any other SSO for IPR or letters of assurance relating to any such Normative Reference; (ii) TIAs policy of encouragement of voluntary disclosure (see Engineering Manual Section 6.5.1) of Essential Patent(s) and published pending patent

13、applications shall apply; and (iii) Information as to claims of IPR in the records or publications of the other SSO shall not constitute identification to TIA of a claim of Essential Patent(s) or published pending patent applications. TIA does not enforce or monitor compliance with the contents of t

14、he Document. TIA does not certify, inspect, test or otherwise investigate products, designs or services or any claims of compliance with the contents of the Document. ALL WARRANTIES, EXPRESS OR IMPLIED, ARE DISCLAIMED, INCLUDING WITHOUT LIMITATION, ANY AND ALL WARRANTIES CONCERNING THE ACCURACY OF T

15、HE CONTENTS, ITS FITNESS OR APPROPRIATENESS FOR A PARTICULAR PURPOSE OR USE, ITS MERCHANTABILITY AND ITS NONINFRINGEMENT OF ANY THIRD PARTYS INTELLECTUAL PROPERTY RIGHTS. TIA EXPRESSLY DISCLAIMS ANY AND ALL RESPONSIBILITIES FOR THE ACCURACY OF THE CONTENTS AND MAKES NO REPRESENTATIONS OR WARRANTIES

16、REGARDING THE CONTENTS COMPLIANCE WITH ANY APPLICABLE STATUTE, RULE OR REGULATION, OR THE SAFETY OR HEALTH EFFECTS OF THE CONTENTS OR ANY PRODUCT OR SERVICE REFERRED TO IN THE DOCUMENT OR PRODUCED OR RENDERED TO COMPLY WITH THE CONTNTS. TIA SHALL NOT BE LIABLE FOR ANY AND ALL DAMAGES, DIRECT OR INDI

17、RECT, ARISING FROM OR RELATING TO ANY USE OF THE CONTENTS CONTAINED HEREIN, INCLUDING WITHOUT LIMITATION ANY AND ALL INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES (INCLUDING DAMAGES FOR LOSS OF BUSINESS, LOSS OF PROFITS, LITIGATION, OR THE LIKE), WHETHER BASED UPON BREACH OF CONTRACT, BREAC

18、H OF WARRANTY, TORT (INCLUDING NEGLIGENCE), PRODUCT LIABILITY OR OTHERWISE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. THE FOREGOING NEGATION OF DAMAGES IS A FUNDAMENTAL ELEMENT OF THE USE OF THE CONTENTS HEREOF, AND THESE CONTENTS WOULD NOT BE PUBLISHED BY TIA WITHOUT SUCH LIMITATIONS. TIA

19、-102.CAED i Foreword (This foreword is not part of this standard.) This document has been created in response to a request by the APCO/NASTD/FED Project 25 Steering Committee as provided for in a Memorandum of Understanding (MOU) dated April 1992 and amended December 1993. That MOU states APCO/NASTD

20、/FED shall devise a common system standard for digital public safety communications (the Standard) commonly referred to as Project 25 or P25, and that TIA, as agreed to by the membership of the appropriate TIA Engineering Committee, will provide technical assistance in the development of documentati

21、on for the Standard. The appearance of the symbol “P25” or the phrase “Project 25” on the cover sheet of this document when published indicates the APCO/NASTD/FED Project 25 Steering Committee has adopted this document as part of “the Standard.” The appearance of the abbreviation “P25” or the wordin

22、g “Project 25” on the cover sheet of this document or in the title of any document referenced herein should not be interpreted as limiting the applicability of the information contained in any document to “P25” or “Project 25” implementations exclusively. This document has been developed with inputs

23、 from the APIC Systems Task Group (STG) and the TIA Industry members. This document is being published to address the need for technical information on the emerging digital techniques for Land Mobile Radio Service. This document describes conformance profiles for advanced trunked operation utilizing

24、 the Common Air Interface. The information herein is designed to insure conformance of radio units and other equipment in a repeatable manner. As other documents describing the conventional and trunking protocols are developed, this document is subject to change. All reasonable efforts have been mad

25、e to ensure the accuracy of the information herein, but it must be noted that the conformance tests inferred in this document have not yet been developed or proven.TIA-102.CAED ii Table Of Contents 1 Introduction 1 2 Scope . 1 2.1 Definitions 1 2.2 Nomenclature . 1 2.3 Abbreviations . 2 2.4 Referenc

26、es . 3 2.5 Revision History . 4 3 Overview 5 3.1 Coverage . 5 3.2 Procedures . 5 3.3 Conformance Test Pass/Fail Criteria . 6 3.4 Conformance Test Roles . 6 3.5 Conformance Test Environment . 7 4 Parameter Values 9 4.1 Overview 9 4.2 NAC . 10 4.3 Network (WACN) ID . 10 4.4 System ID. 10 4.5 RFSS ID .

27、 10 4.6 LRA ID . 10 4.7 Site ID 10 4.8 Subscriber Unit ID (SUID) 10 TIA-102.CAED iii 4.9 Working Unit ID (WUID) . 11 4.10 Subscriber Group ID (SGID) . 11 4.11 Working Group ID (WGID) 11 4.12 Announcement Group ID (AGID) 12 4.13 Service Options. 12 4.14 Encryption Parameters . 12 5 Scope and Conventi

28、ons of Signaling in Test Procedures 12 5.1 Overview 12 5.2 Reference Points and Equipment Under Test 13 5.3 Bandwidth and Modulation . 13 5.4 Frequencies and Channel Identifiers 13 5.5 Framesync . 14 5.6 Control Channel Signaling . 14 5.7 Voice Traffic Channel Signaling . 16 6 CP 1 - Registration Pr

29、ocedures 18 6.1 CP 1.1 Unit Registration Request Wide Area Procedure - Accept . 18 6.2 CP 1.2 Unit Registration with Challenge and Response Authentication . 22 6.3 CP 1.3 Wide Area Unit Registration with Challenge and Response Authentication 26 6.4 CP 1.4 Unit Registration with mutual Challenge and

30、Response Authentication30 6.5 CP 1.5 Wide Area Unit Registration with mutual Challenge and Response Authentication 35 6.6 CP 1.6 Group Affiliation Wide Area Procedure - Accept 40 6.7 CP 1.7 Deregistration . 43 TIA-102.CAED iv 7 CP 2 Voice Procedures . 46 7.1 CP2.1 Unit to Group Call Wide Area Setup

31、46 7.2 CP 2.2 Unit to Group Call - Alternative Procedure - Late Entry 46 7.3 CP 2.3 Unit to Group Call - Alternative Procedure - Late Entry - Explicit . 48 7.4 CP 2.4 - System Call Procedures . 51 7.5 CP 2.5 - Unit to Unit Call Availability Check Wide Area Setup Procedure 51 7.6 CP 2.6 - Unit to Uni

32、t Call Direct Wide Area Setup Procedure 58 7.7 CP 2.7 - Unit to Unit Wide Area Call Continuation Control Channel Wide Area Procedure 63 7.8 CP 2.8 - Unit to PSTN Call Setup . 67 7.9 CP 2.9 Unit to PSTN Call Termination 71 7.10 CP 2.10 - PSTN to Unit Call Setup . 71 7.11 CP 2.11 PSTN to Unit Call Ter

33、mination . 75 7.12 CP 2.12 - PSTN to Group Call Setup 76 7.13 CP 2.13 PSTN to Group Call Termination . 78 8 CP 3 - Supplementary Services Procedures 79 8.1 CP 3.1 Call Alert Request 79 8.2 CP 3.2 Call Alert Request - Alternative Procedure - Denied 81 8.3 CP 3.3 Call Alert Command . 84 8.4 CP 3.4 Cal

34、l Alert Response Alternative Procedure - Denied . 86 8.5 CP 3.5 Call Alert Wide Area Request . 89 8.6 CP 3.6 Call Alert Wide Area Command . 91 8.7 CP 3.7 - Short Message Request . 94 8.8 CP 3.8 Short Message - Alternative Procedure - Denied . 97 TIA-102.CAED v 8.9 CP 3.9 Short Message Command 99 8.1

35、0 CP 3.10 Short Message Response - Alternative Procedure - Denied . 102 8.11 CP 3.11 Short Message Wide Area Request 105 8.12 CP 3.12 Short Message Wide Area Command . 107 8.13 CP 3.13 - Status Update Request . 110 8.14 CP 3.14 Status Update - Alternative Procedure - Denied . 113 8.15 CP 3.15 Status

36、 Update Command 115 8.16 CP 3.16 Status Update Response Alternative Procedure - Denied . 118 8.17 CP 3.17 Status Update Wide Area Request . 121 8.18 CP 3.18 Status Update Wide Area Command 124 8.19 CP 3.19 - Status Query Request. 127 8.20 CP 3.20 Status Query - Alternative Procedure - Denied . 130 8

37、.21 CP 3.21 Status Query Command 132 8.22 CP 3.22 Status Query Response - Alternative Procedure - Denied 135 8.23 CP 3.23 Status Query Wide Area Request . 138 8.24 CP 3.24 Status Query Wide Area Command 141 8.25 CP 3.25 - Radio Unit Monitor (Basic) Request 144 8.26 CP 3.26 Radio Unit Monitor (Basic)

38、 - Alternative Procedure - Denied 147 8.27 CP 3.27 - Radio Unit Monitor (Basic) Wide Area Request 149 8.28 CP 3.28 Enhanced Radio Unit Monitor Request - Individual . 152 8.29 CP 3.29 Enhanced Radio Unit Monitor Wide Area Request - Individual . 155 8.30 CP 3.30 Enhanced Radio Unit Monitor Request - G

39、roup 158 8.31 CP 3.31 Enhanced Radio Unit Monitor Wide Area Request - Group 161 TIA-102.CAED vi 8.32 CP 3.32 Enhanced Radio Unit Monitor Request Alternative Procedure Denied . 164 8.33 CP 3.33 Radio Unit Monitor (Basic) Command . 166 8.34 CP 3.34 Radio Unit Monitor (Basic) Wide Area Command . 169 8.

40、35 CP 3.35 Radio Unit Monitor (Basic) Response Alternative Procedure Denied . 172 8.36 CP 3.36 Enhanced Radio Unit Monitor Command - Individual . 175 8.37 CP 3.37 Enhanced Radio Unit Monitor Wide Area Command - Individual 178 8.38 CP 3.38 Enhanced Radio Unit Monitor Wide Area Command - Individual De

41、nied . 181 8.39 CP 3.39 Enhanced Radio Unit Monitor Command - Group . 184 8.40 CP 3.40 Enhanced Radio Unit Monitor Wide Area Command - Group . 187 8.41 CP 3.41 Enhanced Radio Unit Monitor Response Alternative Procedure Denied . 190 8.42 CP 3.42 - Radio Check . 193 8.43 CP 3.43 Radio Check Wide Area

42、195 8.44 CP 3.44 - Radio Inhibit 198 8.45 CP 3.45 Radio Inhibit Wide Area 200 8.46 CP 3.46 - Radio Uninhibit . 203 8.47 CP 3.47 Radio Uninhibit Wide Area 206 8.48 CP 3.48 - Radio Detach 209 8.49 CP 3.49 Radio Detach Wide Area. 211 TIA-102.CAED vii List Of Tables Table 1: Trunking Conformance Test Ro

43、les 7 Table 2: Pre-conditions - Unit Registration Wide Area - Accept 20 Table 3: Post-conditions - Unit Registration Wide Area - Accept 20 Table 4: Pre-conditions - Unit Registration with Challenge and Response Authentication23 Table 5: Post-conditions - Unit Registration with Challenge and Response

44、 Authentication . 23 Table 6: Pre-conditions Wide Area Unit Registration with Challenge and Response Authentication . 27 Table 7: Post-conditions Wide Area Unit Registration with Challenge and Response Authentication . 27 Table 8: Pre-conditions - Unit Registration with mutual Challenge and Response

45、 Authentication . 31 Table 9: Post-conditions - Unit Registration with mutual Challenge and Response Authentication . 32 Table 10: Pre-conditions Wide Area Unit Registration with mutual Challenge and Response Authentication 36 Table 11: Post-conditions Wide Area Unit Registration with mutual Challen

46、ge and Response Authentication 36 Table 12: Pre-conditions - Group Affiliation Wide Area - Accept . 41 Table 13: Post-conditions - Group Affiliation Wide Area - Accept . 41 Table 14: Pre-conditions - Deregistration 44 Table 15: Pre-conditions - Group Call Setup - Late Entry . 47 Table 16: Post-condi

47、tions - Group Call Setup - Late Entry 47 Table 17: Pre-conditions - Group Call Setup - Late Entry - Explicit . 50 Table 18: Post-conditions - Group Call Setup - Late Entry - Explicit . 50 TIA-102.CAED viii Table 19: Pre-conditions - Unit to Unit Call Availability Check Wide Area Setup 53 Table 20: P

48、ost-conditions - Unit to Unit Call Availability Check Wide Area Setup . 53 Table 21: Pre-conditions - Unit to Unit Call Direct Wide Area Setup . 60 Table 22: Post-conditions - Unit to Unit Direct Call Wide Area Setup . 60 Table 23: Pre-conditions - Unit to Unit Wide Area Call Continuation - Control

49、Channel 64 Table 24: Post-conditions - Unit to Unit Wide Area Call Continuation - Control Channel64 Table 25: Pre-conditions - Unit to PSTN Call Setup 68 Table 26: Post-conditions - Unit to PSTN Setup . 69 Table 27: Pre-conditions - PSTN to Unit Call Setup 72 Table 28: Post-conditions PSTN to Unit Setup . 73 Table 29: Pre-conditions PSTN to Group Call Setup 77 Table 30: Post-conditions - PSTN to Group Setup 77 Table 31: Pre-conditions - Call Alert Request . 80 Table 32: Pre-conditions - Call Alert - Denied . 82 Table 33: Pre-conditions - Call Alert

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1