1、 TIA-2001.4-E-4 (Addendum to TIA-2001.4-E) April 2014Interoperability Specification (IOS) for cdma2000Access Network Interfaces- Part 4 (A1, A1p, A2 and A5 Interfaces) NOTICE TIA Engineering Standards and Publications are designed to serve the public interest through eliminating misunderstandings be
2、tween manufacturers and purchasers, facilitating interchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for their particular need. The existence of such Standards and Publications shall not in any respect preclude
3、any member or non-member of TIA from manufacturing or selling products not conforming to such Standards and Publications. Neither shall the existence of such Standards and Publications preclude their voluntary use by Non-TIA members, either domestically or internationally. Standards and Publications
4、 are adopted by TIA in accordance with the American National Standards Institute (ANSI) patent policy. By such action, TIA does not assume any liability to any patent owner, nor does it assume any obligation whatever to parties adopting the Standard or Publication. This Standard does not purport to
5、address all safety problems associated with its use or all applicable regulatory requirements. It is the responsibility of the user of this Standard to establish appropriate safety and health practices and to determine the applicability of regulatory limitations before its use. Any use of trademarks
6、 in this document are for information purposes and do not constitute an endorsement by TIA or this committee of the products or services of the company. (From Project No. TIA-PN-2001.4-E-4, formulated under the cognizance of the TIA TR-45 Mobile (b) there is no assurance that the Document will be ap
7、proved by any Committee of TIA or any other body in its present or any other form; (c) the Document may be amended, modified or changed in the standards development or any editing process. The use or practice of contents of this Document may involve the use of intellectual property rights (“IPR”), i
8、ncluding pending or issued patents, or copyrights, owned by one or more parties. TIA makes no search or investigation for IPR. When IPR consisting of patents and published pending patent applications are claimed and called to TIAs attention, a statement from the holder thereof is requested, all in a
9、ccordance with the Manual. TIA takes no position with reference to, and disclaims any obligation to investigate or inquire into, the scope or validity of any claims of IPR. TIA will neither be a party to discussions of any licensing terms or conditions, which are instead left to the parties involved
10、, nor will TIA opine or judge whether proposed licensing terms or conditions are reasonable or non-discriminatory. TIA does not warrant or represent that procedures or practices suggested or provided in the Manual have been complied with as respects the Document or its contents. If the Document cont
11、ains one or more Normative References to a document published by another organization (“other SSO”) engaged in the formulation, development or publication of standards (whether designated as a standard, specification, recommendation or otherwise), whether such reference consists of mandatory, altern
12、ate or optional elements (as defined in the TIA Engineering Manual, 4thedition) then (i) TIA disclaims any duty or obligation to search or investigate the records of any other SSO for IPR or letters of assurance relating to any such Normative Reference; (ii) TIAs policy of encouragement of voluntary
13、 disclosure (see Engineering Manual Section 6.5.1) of Essential Patent(s) and published pending patent applications shall apply; and (iii) Information as to claims of IPR in the records or publications of the other SSO shall not constitute identification to TIA of a claim of Essential Patent(s) or p
14、ublished pending patent applications. TIA does not enforce or monitor compliance with the contents of the Document. TIA does not certify, inspect, test or otherwise investigate products, designs or services or any claims of compliance with the contents of the Document. ALL WARRANTIES, EXPRESS OR IMP
15、LIED, ARE DISCLAIMED, INCLUDING WITHOUT LIMITATION, ANY AND ALL WARRANTIES CONCERNING THE ACCURACY OF THE CONTENTS, ITS FITNESS OR APPROPRIATENESS FOR A PARTICULAR PURPOSE OR USE, ITS MERCHANTABILITY AND ITS NONINFRINGEMENT OF ANY THIRD PARTYS INTELLECTUAL PROPERTY RIGHTS. TIA EXPRESSLY DISCLAIMS AN
16、Y AND ALL RESPONSIBILITIES FOR THE ACCURACY OF THE CONTENTS AND MAKES NO REPRESENTATIONS OR WARRANTIES REGARDING THE CONTENTS COMPLIANCE WITH ANY APPLICABLE STATUTE, RULE OR REGULATION, OR THE SAFETY OR HEALTH EFFECTS OF THE CONTENTS OR ANY PRODUCT OR SERVICE REFERRED TO IN THE DOCUMENT OR PRODUCED
17、OR RENDERED TO COMPLY WITH THE CONTENTS. TIA SHALL NOT BE LIABLE FOR ANY AND ALL DAMAGES, DIRECT OR INDIRECT, ARISING FROM OR RELATING TO ANY USE OF THE CONTENTS CONTAINED HEREIN, INCLUDING WITHOUT LIMITATION ANY AND ALL INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES (INCLUDING DAMAGES FOR L
18、OSS OF BUSINESS, LOSS OF PROFITS, LITIGATION, OR THE LIKE), WHETHER BASED UPON BREACH OF CONTRACT, BREACH OF WARRANTY, TORT (INCLUDING NEGLIGENCE), PRODUCT LIABILITY OR OTHERWISE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. THE FOREGOING NEGATION OF DAMAGES IS A FUNDAMENTAL ELEMENT OF THE US
19、E OF THE CONTENTS HEREOF, AND THESE CONTENTS WOULD NOT BE PUBLISHED BY TIA WITHOUT SUCH LIMITATIONS. TIA-2001.4-E-4 Revision History Date Publication Description June 2007 A.S0014-D v1.0 For features supported, refer to the Overview 11, section 1.1. August 2009 A.S0014-D v2.0 Updates to support 1x a
20、ir interface enhancements, EVRC-WB on A2p, EVRC-NW on A2 and A2p and bug fixes. May 2011 A.S0014-D v3.0 Support for callback of an emergency call origination, EVRC-NW capacity operating point 0, and bug fixes. August 2012 A.S0014-D v4.0 Support for EVRC-B, EVRC-WB, EVRC-NW, EVRC-NW2K, USSD, MSC-BS i
21、ndication of Device Type and bug fix. March 2014 A.S0014-D v5.0 Support for USSD on common channel, M2M IOS and bug fix. TIA-2001.4-E-4 (This page intentionally left blank.) TIA-2001.4-E-4 Table of Contents 1 2 Foreword . xv 3 1.0 Introduction 1 4 1.1 Overview 1 5 1.1.1 Purpose . 1 6 1.1.2 Scope 1 7
22、 1.2 References 2 8 1.2.1 Normative References 2 9 1.2.2 Informative References 4 10 1.3 Terminology . 4 11 1.3.1 Acronyms . 4 12 1.3.2 Definitions 8 13 1.4 Message Body, Coding, and Ordering of Elements . 8 14 1.5 Forward Compatibility Guidelines . 10 15 1.6 Message Processing Guidelines . 10 16 1.
23、7 Message Definition Guidelines 11 17 1.8 Message Sending Guidelines . 12 18 1.9 MSC BS Functional Partitioning . 12 19 1.10 Documentation Conventions 13 20 2.0 Message Procedures . 15 21 2.1 Call Processing Message Procedures . 15 22 2.1.1 Complete Layer 3 Information . 15 23 2.1.1.1 Successful Ope
24、ration 15 24 2.1.1.2 Failure Operation 15 25 2.1.2 Connection Management (CM) Service Request . 15 26 2.1.2.1 Successful Operation 15 27 2.1.2.2 Failure Operation 16 28 2.1.2.3 Abnormal Operation . 16 29 2.1.3 Connection Management (CM) Service Request Continuation . 16 30 2.1.3.1 Successful Operati
25、on 16 31 2.1.3.2 Failure Operation 16 32 2.1.4 Paging Request . 17 33 2.1.4.1 Successful Operation 17 34 2.1.4.2 Failure Operation 17 35 2.1.5 Paging Response 17 36 2.1.5.1 Successful Operation 17 37 2.1.5.2 Failure Operation 18 38 2.1.5.3 Abnormal Operation . 18 39 2.1.6 Progress 18 40 2.1.6.1 Succ
26、essful Operation 18 41 2.1.6.2 Failure Operation 18 42 2.1.7 Assignment Request . 18 43 2.1.7.1 Successful Operation 19 44 2.1.7.2 Failure Operation 19 45 2.1.8 Assignment Complete 19 46 2.1.8.1 Successful Operation 19 47 2.1.8.2 Failure Operation 19 48 2.1.9 Assignment Failure 20 49 2.1.9.1 Success
27、ful Operation 20 50 2.1.9.2 Failure Operation 20 51 2.1.10 Connect 20 52 2.1.10.1 Successful Operation 20 53 2.1.10.2 Failure Operation 20 54 2.1.11 Service Release 20 55 i TIA-2001.4-E-4 2.1.11.1 Base Station Initiated 20 1 2.1.11.1.1 Successful Operation 20 2 2.1.11.1.2 Failure Operation 21 3 2.1.
28、11.2 MSC Initiated . 21 4 2.1.11.2.1 Successful Operation 21 5 2.1.11.2.2 Failure Operation 21 6 2.1.12 Service Release Complete 21 7 2.1.12.1 MSC Initiated . 21 8 2.1.12.1.1 Successful Operation 21 9 2.1.12.1.2 Failure Operation 22 10 2.1.12.2 BS Initiated . 22 11 2.1.12.2.1 Successful Operation 22
29、 12 2.1.12.2.2 Failure Operation 22 13 2.1.13 Clear Request . 22 14 2.1.13.1 Successful Operation 22 15 2.1.13.2 Failure Operation 22 16 2.1.14 Clear Command . 22 17 2.1.14.1 Successful Operation 23 18 2.1.14.2 Failure Operation 23 19 2.1.15 Clear Complete 23 20 2.1.15.1 Successful Operation 23 21 2
30、.1.15.2 Failure Operation 23 22 2.1.16 Alert With Information 24 23 2.1.16.1 Successful Operation 24 24 2.1.16.2 Failure Operation 24 25 2.1.17 BS Service Request 24 26 2.1.17.1 Successful Operation 24 27 2.1.17.2 Failure Operation 24 28 2.1.18 BS Service Response 24 29 2.1.18.1 Successful Operation
31、 25 30 2.1.18.2 Failure Operation 25 31 2.1.19 Additional Service Notification . 25 32 2.1.19.1 Successful Operation 25 33 2.1.19.2 Failure Operation 25 34 2.1.20 Additional Service Request 25 35 2.1.20.1 Successful Operation 25 36 2.1.20.2 Failure Operation 26 37 2.1.21 Bearer Update Request . 26 3
32、8 2.1.21.1 Successful Operation 26 39 2.1.21.2 Failure Operation 26 40 2.1.22 Bearer Update Response 26 41 2.1.22.1 Successful Operation 26 42 2.1.22.2 Failure Operation 26 43 2.1.23 Bearer Update Required . 26 44 2.1.23.1 Successful Operation 26 45 2.1.23.2 Failure Operation 27 46 2.2 Supplementary
33、 Services Message Procedures 27 47 2.2.1 Flash with Information . 27 48 2.2.1.1 Successful Operation 27 49 2.2.1.2 Failure Operation 27 50 2.2.2 Flash with Information Ack . 28 51 2.2.2.1 Successful Operation 28 52 2.2.2.2 Failure Operation 28 53 2.2.3 Feature Notification . 28 54 2.2.3.1 Successful
34、 Operation 28 55 2.2.3.2 Failure Operation 28 56 ii TIA-2001.4-E-4 2.2.4 Feature Notification Ack 28 1 2.2.4.1 Successful Operation 28 2 2.2.4.2 Failure Operation 29 3 2.2.5 PACA Command . 29 4 2.2.5.1 Successful Operation 29 5 2.2.5.2 Failure Operation 29 6 2.2.6 PACA Command Ack 29 7 2.2.6.1 Succe
35、ssful Operation 29 8 2.2.6.2 Failure Operation 29 9 2.2.7 PACA Update 29 10 2.2.7.1 Successful Operation 29 11 2.2.7.2 Failure Operation 30 12 2.2.8 PACA Update Ack . 30 13 2.2.8.1 Successful Operation 30 14 2.2.8.2 Failure Operation 30 15 2.2.9 Radio Measurements for Position Request 30 16 2.2.9.1
36、Successful Operation 31 17 2.2.9.2 Failure Operation 31 18 2.2.10 Radio Measurements for Position Response 31 19 2.2.10.1 Successful Operation 31 20 2.2.10.2 Failure Operation 31 21 2.3 Mobility Management Message Procedures 31 22 2.3.1 Authentication Request 31 23 2.3.1.1 Successful Operation 32 24
37、 2.3.1.2 Failure Operation 32 25 2.3.2 Authentication Response 32 26 2.3.2.1 Successful Operation 32 27 2.3.2.2 Failure Operation 32 28 2.3.3 SSD Update Request 32 29 2.3.3.1 Successful Operation 32 30 2.3.3.2 Failure Operation 33 31 2.3.4 SSD Update Response 33 32 2.3.4.1 Successful Operation 33 33
38、 2.3.4.2 Failure Operation 33 34 2.3.5 Base Station Challenge 33 35 2.3.5.1 Successful Operation 33 36 2.3.5.2 Failure Operation 34 37 2.3.6 Base Station Challenge Response 34 38 2.3.6.1 Successful Operation 34 39 2.3.6.2 Failure Operation 34 40 2.3.7 Location Updating Request 34 41 2.3.7.1 Successf
39、ul Operation 34 42 2.3.7.2 Failure Operation 34 43 2.3.8 Location Updating Accept . 35 44 2.3.8.1 Successful Operation 35 45 2.3.8.2 Failure Operation 35 46 2.3.9 Location Updating Reject. 35 47 2.3.9.1 Successful Operation 35 48 2.3.9.2 Failure Operation 35 49 2.3.10 Parameter Update Request . 35 5
40、0 2.3.10.1 Successful Operation 35 51 2.3.10.2 Failure Operation 35 52 2.3.11 Parameter Update Confirm . 36 53 2.3.11.1 Successful Operation 36 54 2.3.11.2 Failure Operation 36 55 2.3.12 Privacy Mode Command 36 56 iii TIA-2001.4-E-4 2.3.12.1 Successful Operation 36 1 2.3.12.2 Failure Operation 36 2
41、2.3.13 Privacy Mode Complete . 37 3 2.3.13.1 Successful Operation 37 4 2.3.13.2 Failure Operation 37 5 2.3.14 Status Request 37 6 2.3.14.1 Successful Operation 37 7 2.3.14.2 Failure Operation 37 8 2.3.15 Status Response 37 9 2.3.15.1 Successful Operation 38 10 2.3.15.2 Failure Operation 38 11 2.3.16
42、 User Zone Update Request . 38 12 2.3.16.1 Successful Operation 38 13 2.3.16.2 Failure Operation 38 14 2.3.17 User Zone Update 38 15 2.3.17.1 Successful Operation 38 16 2.3.17.2 Failure Operation 38 17 2.3.18 User Zone Reject 38 18 2.3.18.1 Successful Operation 38 19 2.3.18.2 Failure Operation 39 20
43、 2.3.19 Registration Request 39 21 2.3.19.1 Successful Operation 39 22 2.3.19.2 Failure Operation 39 23 2.3.20 Mobile Station Registered Notification 39 24 2.3.20.1 Successful Operation 39 25 2.3.20.2 Failure Operation 39 26 2.3.21 BS Authentication Request 39 27 2.3.21.1 Successful Operation 39 28
44、2.3.21.2 Failure Operation 39 29 2.3.22 BS Authentication Request Ack . 40 30 2.3.22.1 Successful Operation 40 31 2.3.22.1 Failure Operation 40 32 2.3.23 BS Security Mode Request 40 33 2.3.23.1 Successful Operation 40 34 2.3.23.2 Failure Operation 40 35 2.3.24 Security Mode Request 40 36 2.3.24.1 Su
45、ccessful Operation 40 37 2.3.24.2 Failure Operation 41 38 2.3.25 Security Mode Response 41 39 2.3.25.1 Successful Operation 41 40 2.3.25.2 Failure Operation 41 41 2.3.26 Authentication Report 41 42 2.3.26.1 Successful Operation 41 43 2.3.26.2 Failure Operation 41 44 2.3.27 Authentication Report Resp
46、onse 41 45 2.3.27.1 Successful Operation 42 46 2.3.27.2 Failure Operation 42 47 2.3.28 Event Notification 42 48 2.3.28.1 Successful Operation 42 49 2.3.28.2 Failure Operation 42 50 2.3.29 Event Notification Ack 42 51 2.3.29.1 Successful Operation 42 52 2.3.29.2 Failure Operation 42 53 2.4 Handoff Me
47、ssage Procedures . 43 54 2.4.1 Handoff Required . 43 55 2.4.1.1 Successful Operation 43 56 iv TIA-2001.4-E-4 2.4.1.2 Failure Operation 43 1 2.4.2 Handoff Request. 43 2 2.4.2.1 Successful Operation 43 3 2.4.2.2 Failure Operation 44 4 2.4.3 Handoff Request Acknowledge . 44 5 2.4.3.1 Successful Operati
48、on 44 6 2.4.3.2 Failure Operation 45 7 2.4.4 Handoff Command . 45 8 2.4.4.1 Successful Operation 45 9 2.4.4.2 Failure Operation 45 10 2.4.5 Handoff Commenced . 46 11 2.4.5.1 Successful Operation 46 12 2.4.5.2 Failure Operation 46 13 2.4.6 Handoff Complete 47 14 2.4.6.1 Successful Operation 47 15 2.4
49、.6.2 Failure Operation 47 16 2.4.7 Handoff Required Reject 47 17 2.4.7.1 Successful Operation 47 18 2.4.7.2 Failure Operation 47 19 2.4.8 Handoff Failure 48 20 2.4.8.1 Successful Operation 48 21 2.4.8.2 Failure Operation 48 22 2.4.9 Handoff Performed . 48 23 2.4.9.1 Successful Operation 48 24 2.4.9.2 Failure Operation 48 25 2.5 Facility Management Message Procedures 49 26 2.5.1 Block 49 27 2.5.1.1 Successful Operation 49 28 2.5.1.2 Failure Operation 49 29 2.5.2 Block Acknowledge . 49 30 2.5.2.1 Successful Operation 49 31 2.5.2.2 Failure Operation 50 32 2.5.3 Unblock 50 33 2.5.3.1 Succ