1、 TIA-41.000-E-4 E APPROVED: SEPTEMBER 14, 2007 REAFFIRMED: JUNE 21, 2012 TIA-41.000-E-4 E September 2007Introduction to Mobile Application Part (MAP) NOTICE TIA Engineering Standards and Publications are designed to serve the public interest through eliminating misunderstandings between manufacturer
2、s and purchasers, facilitating interchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for their particular need. The existence of such Standards and Publications shall not in any respect preclude any member or non-
3、member of TIA from manufacturing or selling products not conforming to such Standards and Publications. Neither shall the existence of such Standards and Publications preclude their voluntary use by Non-TIA members, either domestically or internationally. Standards and Publications are adopted by TI
4、A in accordance with the American National Standards Institute (ANSI) patent policy. By such action, TIA does not assume any liability to any patent owner, nor does it assume any obligation whatever to parties adopting the Standard or Publication. This Standard does not purport to address all safety
5、 problems associated with its use or all applicable regulatory requirements. It is the responsibility of the user of this Standard to establish appropriate safety and health practices and to determine the applicability of regulatory limitations before its use. (From Project No. 3-3590.000-AD4E, form
6、ulated under the cognizance of the TIA TR-45 Mobile (b) there is no assurance that the Document will be approved by any Committee of TIA or any other body in its present or any other form; (c) the Document may be amended, modified or changed in the standards development or any editing process. The u
7、se or practice of contents of this Document may involve the use of intellectual property rights (“IPR”), including pending or issued patents, or copyrights, owned by one or more parties. TIA makes no search or investigation for IPR. When IPR consisting of patents and published pending patent applica
8、tions are claimed and called to TIAs attention, a statement from the holder thereof is requested, all in accordance with the Manual. TIA takes no position with reference to, and disclaims any obligation to investigate or inquire into, the scope or validity of any claims of IPR. TIA will neither be a
9、 party to discussions of any licensing terms or conditions, which are instead left to the parties involved, nor will TIA opine or judge whether proposed licensing terms or conditions are reasonable or non-discriminatory. TIA does not warrant or represent that procedures or practices suggested or pro
10、vided in the Manual have been complied with as respects the Document or its contents. If the Document contains one or more Normative References to a document published by another organization (“other SSO”) engaged in the formulation, development or publication of standards (whether designated as a s
11、tandard, specification, recommendation or otherwise), whether such reference consists of mandatory, alternate or optional elements (as defined in the TIA Engineering Manual, 4thedition) then (i) TIA disclaims any duty or obligation to search or investigate the records of any other SSO for IPR or let
12、ters of assurance relating to any such Normative Reference; (ii) TIAs policy of encouragement of voluntary disclosure (see Engineering Manual Section 6.5.1) of Essential Patent(s) and published pending patent applications shall apply; and (iii) Information as to claims of IPR in the records or publi
13、cations of the other SSO shall not constitute identification to TIA of a claim of Essential Patent(s) or published pending patent applications. TIA does not enforce or monitor compliance with the contents of the Document. TIA does not certify, inspect, test or otherwise investigate products, designs
14、 or services or any claims of compliance with the contents of the Document. ALL WARRANTIES, EXPRESS OR IMPLIED, ARE DISCLAIMED, INCLUDING WITHOUT LIMITATION, ANY AND ALL WARRANTIES CONCERNING THE ACCURACY OF THE CONTENTS, ITS FITNESS OR APPROPRIATENESS FOR A PARTICULAR PURPOSE OR USE, ITS MERCHANTAB
15、ILITY AND ITS NONINFRINGEMENT OF ANY THIRD PARTYS INTELLECTUAL PROPERTY RIGHTS. TIA EXPRESSLY DISCLAIMS ANY AND ALL RESPONSIBILITIES FOR THE ACCURACY OF THE CONTENTS AND MAKES NO REPRESENTATIONS OR WARRANTIES REGARDING THE CONTENTS COMPLIANCE WITH ANY APPLICABLE STATUTE, RULE OR REGULATION, OR THE S
16、AFETY OR HEALTH EFFECTS OF THE CONTENTS OR ANY PRODUCT OR SERVICE REFERRED TO IN THE DOCUMENT OR PRODUCED OR RENDERED TO COMPLY WITH THE CONTENTS. TIA SHALL NOT BE LIABLE FOR ANY AND ALL DAMAGES, DIRECT OR INDIRECT, ARISING FROM OR RELATING TO ANY USE OF THE CONTENTS CONTAINED HEREIN, INCLUDING WITH
17、OUT LIMITATION ANY AND ALL INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES (INCLUDING DAMAGES FOR LOSS OF BUSINESS, LOSS OF PROFITS, LITIGATION, OR THE LIKE), WHETHER BASED UPON BREACH OF CONTRACT, BREACH OF WARRANTY, TORT (INCLUDING NEGLIGENCE), PRODUCT LIABILITY OR OTHERWISE, EVEN IF ADVISE
18、D OF THE POSSIBILITY OF SUCH DAMAGES. THE FOREGOING NEGATION OF DAMAGES IS A FUNDAMENTAL ELEMENT OF THE USE OF THE CONTENTS HEREOF, AND THESE CONTENTS WOULD NOT BE PUBLISHED BY TIA WITHOUT SUCH LIMITATIONS. TIA-41.000-E-4 EREVISION HISTORYCopyright Telecommunications Industry Association 2006. All r
19、ights reserved.This document is subject to change.Revision Date Remarks(IS-41) 0 February 1988 Initial publication.(IS-41) A January 1991(IS-41) B December 1991(IS-41) C February 1996TIA/EIA-41-D December 1997 Initial ANSI publication.TIA-41.000-ETIA-41.500 590-ETIA-41.700 790-EMarch 2004 Initial pu
20、blication with new part structure.TIA-41.000-E-1 E July 2005 Addendum 1.TIA-41.400-ETIA-41.600 691-EJuly 2005 Initial publication with new part structure.TIA-41.000-E-2 E October 2005 Addendum 2.TIA-41.691-E-1 E October 2005 Addition of Annex F: RECOVERY FROM SCCP SEGMENTATION FAILURE.TIA-41.000-E-3
21、 E May 2006 Addendum 3.TIA-41.200 and 290-E May 2006 Initial ANSI publication with new part structure.TIA-41.000-E-4 E January 2007 Addendum 4.TIA-41.321-E January 2007 Initial ANSI publication with new part structure.TIA-41.322-E January 2007 Initial ANSI publication with new part structure.TIA-41.
22、323-E January 2007 Initial ANSI publication with new part structure.TIA-41.324-E January 2007 Initial ANSI publication with new part structure.TIA-41.000-E-4 EiiThis page intentionally left blank.TIA-41.000-E-4 EiiiContentsRevision History . 0iiiList of Tables 0xxxviiiList of Figures 0xliiiPart 000
23、- INTRODUCTION TO MAP1 COMPARISON WITH N.S0005-0 v1.0/TIA/EIA-41-D .022 PART STRUCTURE 082.1 OBJECTIVE 0102.2 SCOPE. 0112.3 REFERENCES 0112.3.1 Normative References 0112.3.2 Informative References 0143 DEFINITIONS AND DOCUMENTATION CONVENTIONS 0153.1 DEFINITIONS 0154 SYMBOLS AND ABBREVIATIONS .0274.
24、1 DOCUMENTATION CONVENTIONS 0494.1.1 Scenario Diagram Conventions 0494.1.2 Scenario Description Conventions 0524.1.3 TCAP Package Type Diagram Conventions . 0545 NETWORK REFERENCE MODEL .0565.1 NETWORK ENTITY RELATIONSHIP DIAGRAM 0566 CELLULAR INTERSYSTEM SERVICES .0586.1 GENERAL BACKGROUND AND ASSU
25、MPTIONS 0596.2 OTA ASSUMPTIONS 0606.3 NETWORK TMSI ASSUMPTIONS 0606.4 WIRELESS INTELLIGENT NETWORK ASSUMPTIONS. 0616.5 SEGMENTATION AND REASSEMBLY ASSUMPTIONS 0616.6 PCS MULTI-BAND SUPPORT ASSUMPTIONS 0626.7 IMSI SUPPORT ASSUMPTIONS . 0626.8 WIRELESS NUMBER PORTABILITY ASSUMPTIONS . 0646.9 CALLING N
26、AME PRESENTATION ASSUMPTIONS . 0656.10 AUTHENTICATION ENHANCEMENT ASSUMPTIONS 0667 RESTRICTIONS .066Part 2001 Introduction2001TIA-41.000-E-4 Eiv1.1 OBJECTIVE 20011.2 SCOPE .20012 BASIC INTERSYSTEM HANDOFF SCENARIOS .20022.1 Successful Handoff-Forward 20032.2 Successful Handoff-Back 20052.3 Successfu
27、l Handoff-Back with Tandem viaFacilitiesDirective (Path Minimization is not supported) .20072.4 Successful Handoff-Back with Tandem viaFacilitiesDirective when HandoffToThird Fails .20092.5 Successful Handoff-Forward with Tandem 200122.6 Successful Handoff-Back with Tandem .200132.7 Successful Hando
28、ffToThird with Path Minimization .200142.8 Successful HandoffToThird with Tandem and Path Minimization 200162.9 Successful Handoff-Back with Tandem via HandoffToThird when the method of Handoff-ToThird with Tandem and Path Minimization is involved .200182.10 Successful Call Release by Served MS .200
29、212.11 Successful Call Release by Other Party 200222.12 Successful Handoff-Forward of an Originating MS Awaiting Answer 200242.13 Successful Handoff-Forward of a Terminating MS While Alerting .20026Part 290Annex A: Additional DMH Support for Intersystem Handoff in MAP (normative) .2901Part 3211 Call
30、 Delivery32111.1 CD Demand Activation or De-Activation .32111.2 CD Invocation to an Idle MS on Another MSC.32111.3 CD Invocation to an Idle, Local MS .32141.4 CD Invocation to a Busy MS 32151.5 CD Invocation with No Page Response or No Answer 32161.6 CD Invocation to an Inaccessible MS .32171.7 CD I
31、nvocation with Intersystem Paging .32181.8 CD Invocation with Unsolicited Page Response 321111.9 TLDN Call Arrival with Intersystem Paging 321131.10 TLDN Call Arrival with No Page Response to Intersystem Paging .321151.11 TLDN Call Arrival with No Answer After Intersystem Paging, Call Release Initia
32、ted by Serving MSC .321161.12 TLDN Call Arrival with No Answer After Intersystem Paging, Call Release Initiated by Border MSC 32119TIA-41.000-E-4 EvPart 3221 INTRODUCTION .32212 Call ForwardingBusy.32212.1 CFB Variable Registration or De-Registration . 32212.2 CFB Demand Activation with Courtesy Cal
33、l 32212.3 CFB Demand Activation (without Courtesy Call) or De-Activation 32212.4 CFB Invocation 32222.5 CFB Invocation with Call Collision . 32233 Call ForwardingDefault 32253.1 CFD Variable Registration or De-Registration 32253.2 CFD Demand Activation with Courtesy Call . 32253.3 CFD Demand Activat
34、ion (without Courtesy Call) or De-Activation 32253.4 CFD Invocation with Busy 32253.5 CFD Invocation with Call Collision 32253.6 CFD InvocationImmediate 32263.7 CFD Invocation with No Answer or No Response to Page 32274 Call ForwardingNo Answer 32294.1 CFNA Variable Registration or De-Registration 3
35、2294.2 CFNA Demand Activation with Courtesy Call. 32294.3 CFNA Demand Activation (without Courtesy Call) or De-Activation. 32294.4 CFNA InvocationImmediate . 32294.5 CFNA InvocationDelayed. 32295 Call ForwardingUnconditional .322115.1 CFU Variable Registration or De-Registration . 322115.2 CFU Deman
36、d Activation with Courtesy Call 322115.3 CFU Demand Activation (without Courtesy Call) or De-Activation 322115.4 CFU Invocation with Alert 32212Part 3231 INTRODUCTION .32312 Call Transfer 32313 Call Waiting.32313.1 CW Demand Activation or De-Activation 32313.2 CW Demand Cancellation with Call . 3232
37、3.3 CW Demand Cancellation (during call) 32333.4 CW Invocation 32353.5 CW Interaction after Handoff 3237TIA-41.000-E-4 EviPart 3241 INTRODUCTION .112 Calling Number Identification Presentation 112.1 CNIP Invocation to an Idle Subscriber 122.2 CNIP Interaction with CW 142.3 CNIP Interaction with CW A
38、fter Handoff 152.4 CNIP Interaction with CFU 172.5 CNIP Interaction with CFU after Handoff 192.6 CNIP Invocation to a Forwarded-To Subscriber 1103 Calling Number Identification Restriction .1123.1 CNIR Temporary Activation or De-Activation with Call .1123.2 CNIR Interaction with CFU 1143.3 CNIR Inte
39、raction with CFNA or CFD on MS No Answer1163.4 CNIR Interaction with CFB or CFD on MS Busy.1183.5 CNIR Interaction with CFB or CFD on Call Collision .120Part 4001 Operations, Administration and Maintenance (OA&M) .40011.1 SCOPE .40011.2 NETWORK FEATURES 40011.2.1 Automatic Repeat Attempt .40011.2.2
40、Blocking and Unblocking of Circuits .40011.2.3 Blocking States .40021.2.4 State Transitions40021.2.5 Other Actions on Receipt of a Blocking INVOKE.40051.2.6 State Transition Table.40061.3 ABNORMAL CONDITIONS 400111.3.1 Dual Seizure (glare) 400111.3.1.1 Unguarded Interval.400111.3.1.2 Detection of Du
41、al Seizure 400111.3.1.3 Preventative Action for Dual Seizure.400111.3.1.4 Action To Be Taken On Detection Of Dual Seizure400111.3.2 Reset of Circuits400121.3.2.1 Reset Circuit Signal400121.3.3 Failure in the Blocking and Unblocking Sequences.400131.3.4 Receipt Of Unreasonable Signaling Information40
42、0141.3.5 Loss of Messages in the Release Sequence 400151.3.5.1 Failure to Receive a FacilitiesRelease RETURN RESULT.400151.3.6 Other Failure Conditions.400151.3.6.1 Inability to Release in Response to a FacilitiesRelease INVOKE .40015TIA-41.000-E-4 Evii2 Inter-MSC TRUNK TESTING .400162.1 INTRODUCTIO
43、N. 400162.2 TEST PROCEDURES. 400162.2.1 Trunk Test Request 400162.2.2 Trunk Test Reply 400172.2.3 Trunk Test Disconnect Request . 400172.2.4 Trunk Test Disconnect Reply. 400172.3 OA&M TIMER VALUES FOR TRUNK TESTING . 40017Part 5001 MAP PROTOCOL ARCHITECTURE .5001Part 5101 X.25-BASED DATA TRANSFER SE
44、RVICES5101Part 5111 Message Transfer Part .51112 Signaling Connection Control Part .5112Part 5121 ITU-T SS7-BASED DATA TRANSFER SERVICES51211.1 MESSAGE TRANSFER PART 51211.2 SIGNALING CONNECTION CONTROL PART 5122Part 5201 APPLICATION SERVICES .52011.1 APPLICATION SERVICES ARCHITECTURE 52011.2 APPLIC
45、ATION LAYER STRUCTURE . 52021.3 TCAP FORMATS AND PROCEDURES . 52031.3.1 Transaction Portion 52031.3.2 Component Portion. 52031.3.2.1 TCAP INVOKE Component . 52041.3.2.2 TCAP RETURN RESULT Component. 52051.3.2.3 TCAP RETURN ERROR Component . 52061.3.3 TCAP REJECT Component 52010TIA-41.000-E-4 EviiiPa
46、rt 5401 MAP OPERATIONS.54011.1 General.54011.2 Operation Formats54011.2.1 Parameters cross references 54011.3 Operation Specifiers.54011.3.1 Mapping of Operations onto TCAP Package Types.54042 OPERATION DEFINITIONS 54062.1 AnalyzedInformation 54092.2 AuthenticationDirective 540132.3 AuthenticationDi
47、rectiveForward 540162.4 AuthenticationFailureReport .540182.5 AuthenticationRequest 540202.6 AuthenticationStatusReport 540242.7 BaseStationChallenge .540272.8 Blocking 540292.9 BulkDeregistration 540302.10 ChangeFacilities 540312.11 ChangeService 540332.12 ConnectionFailureReport 540362.13 ConnectR
48、esource 540372.14 CountRequest 540382.15 DisconnectResource 540392.16 FacilitiesDirective .540402.17 FacilitiesDirective2 .540422.18 FacilitiesRelease 540482.19 FacilitySelectedAndAvailable 540492.20 FeatureRequest 540522.21 FlashRequest .540562.22 HandoffBack .540582.23 HandoffBack2 .540602.24 Hand
49、offMeasurementRequest .540662.25 HandoffMeasurementRequest2 .540682.26 HandoffToThird 540702.27 HandoffToThird2 540722.28 InformationDirective .540772.29 InformationForward 540792.30 InstructionRequest 540812.31 InterSystemAnswer .540822.32 InterSystemPage 540832.33 InterSystemPage2 540872.34 InterSystemSetup 54091TIA-41.000-E-4 E12345678910