UL 1767-2013 UL Standard for Safety Early-Suppression Fast-Response Sprinklers (Fourth Edition Reprint with Revisions Through and Including October 29 2015)《快速抑止快速喷水器》.pdf

上传人:rimleave225 文档编号:1067671 上传时间:2019-04-02 格式:PDF 页数:74 大小:2.87MB
下载 相关 举报
UL 1767-2013 UL Standard for Safety Early-Suppression Fast-Response Sprinklers (Fourth Edition Reprint with Revisions Through and Including October 29 2015)《快速抑止快速喷水器》.pdf_第1页
第1页 / 共74页
UL 1767-2013 UL Standard for Safety Early-Suppression Fast-Response Sprinklers (Fourth Edition Reprint with Revisions Through and Including October 29 2015)《快速抑止快速喷水器》.pdf_第2页
第2页 / 共74页
UL 1767-2013 UL Standard for Safety Early-Suppression Fast-Response Sprinklers (Fourth Edition Reprint with Revisions Through and Including October 29 2015)《快速抑止快速喷水器》.pdf_第3页
第3页 / 共74页
UL 1767-2013 UL Standard for Safety Early-Suppression Fast-Response Sprinklers (Fourth Edition Reprint with Revisions Through and Including October 29 2015)《快速抑止快速喷水器》.pdf_第4页
第4页 / 共74页
UL 1767-2013 UL Standard for Safety Early-Suppression Fast-Response Sprinklers (Fourth Edition Reprint with Revisions Through and Including October 29 2015)《快速抑止快速喷水器》.pdf_第5页
第5页 / 共74页
点击查看更多>>
资源描述

1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL UL 1767 Early-Suppression Fast-Response SprinklersUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM ULUL COPYRIGHTED MATERIAL NOT AUTHORIZE

2、D FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL UL Standard for Safety for Early-Suppression Fast-Response Sprinklers, UL 1767 Fourth Edition, Dated April 30, 2013 SUMMARY OF TOPICS These revisions to ANSI/UL 1767 include the following changes in requirements: Revisions to Clar

3、ify Requirements and Update Testing Details ESFR Sprinklers Having a RTI Greater Than 36 (ms) 1/2 Revised Heat Resistance Test Requirements Sprinkler Test Orientation for Salt Spray Exposure Text that has been changed in any manner or impacted by ULs electronic publishing system is marked with a ver

4、tical line in the margin. The new and revised requirements are substantially in accordance with Proposal(s) on this subject dated August 28, 2015. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form by any means, electronic, me

5、chanical photocopying, recording, or otherwise without prior permission of UL. UL provides this Standard as is without warranty of any kind, either expressed or implied, including but not limited to, the implied warranties of merchantability or tness for any purpose. In no event will UL be liable fo

6、r any special, incidental, consequential, indirect or similar damages, including loss of prots, lost savings, loss of data, or any other damages arising out of the use of or the inability to use this Standard, even if UL or an authorized UL representative has been advised of the possibility of such

7、damage. In no event shall ULs liability for any damage ever exceed the price paid for this Standard, regardless of the form of the claim. Users of the electronic versions of ULs Standards for Safety agree to defend, indemnify, and hold UL harmless from and against any loss, expense, liability, damag

8、e, claim, or judgment (including reasonable attorneys fees) resulting from any error or deviation introduced while purchaser is storing an electronic Standard on the purchasers computer system. The requirements in this Standard are now in effect, except for those paragraphs, sections, tables, gures,

9、 and/or other elements of the Standard having future effective dates as indicated in the note following the affected item. The prior text for requirements that have been revised and that have a future effective date are located after the Standard, and are preceded by a SUPERSEDED REQUIREMENTS notice

10、. OCTOBER 29, 2015 UL 1767 tr1UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL OCTOBER 29, 2015 UL 1767 tr2 No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL April 3

11、0, 2013 (Title Page Reprinted: October 29, 2015) 1 UL 1767 Standard for Early-Suppression Fast-Response Sprinklers First Edition February, 1990 Second Edition January, 1995 Third Edition January, 2005 Fourth Edition April 30, 2013 This ANSI/UL Standard for Safety consists of the Fourth Edition inclu

12、ding revisions through October 29, 2015. The most recent designation of ANSI/UL 1767 as an American National Standard (ANSI) occurred on October 28, 2015. ANSI approval for a standard does not include the Cover Page, Transmittal Pages, Title Page, or effective date information. Comments or proposals

13、 for revisions on any part of the Standard may be submitted to UL at any time. Proposals should be submitted via a Proposal Request in ULs On-Line Collaborative Standards Development System (CSDS) at http:/. ULs Standards for Safety are copyrighted by UL. Neither a printed nor electronic copy of a S

14、tandard should be altered in any way. All of ULs Standards and all copyrights, ownerships, and rights regarding those Standards shall remain the sole and exclusive property of UL. COPYRIGHT 2015 UNDERWRITERS LABORATORIES INC. ANSI/UL 1767-2015UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPROD

15、UCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL APRIL 30, 2013 EARLY-SUPPRESSION FAST-RESPONSE SPRINKLERS - UL 1767 2 No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL CONTENTS INTRODUCTION 1 Scope .6 2 Components .6 3 Un

16、it Of Measurement .6 4 Undated References 7 5 Glossary .7 CONSTRUCTION 6 General 9 7 Inlet Threads .9 8 Temperature Ratings .10 9 Pressure Rating .10 10 Nominal “K” Factors 10 11 Coatings and Platings 11 12 Protective Covers .11 PERFORMANCE GENERAL 13 General 11 14 Samples 12 PHYSICAL STRENGTH AND L

17、EAKAGE TESTS 15 Load on Heat Responsive Element Test .12 16 Strength of Heat Responsive Element Test .12 16.1 Fusible-alloy types .12 16.2 Glass-bulb types .13 17 Glass Bulb Thermal Shock Test 13 18 Strength of Frame Test 14 19 Impact Resistance Test 14 20 Impact Test for Protective Covers .16 21 Ro

18、ugh Usage Test 18 22 Flow Endurance Test 18 23 Leakage Test .19 24 Hydrostatic Strength Test .19 25 Dry Sprinkler Air Tightness Test 19 26 30-Day Leakage Test 21 27 Water Hammer Test .21 28 Vacuum Test .22 OPERATION TESTS 29 Operating Temperature (Bath) Test .22 30 Air Bath Test for Glass Bulb Sprin

19、klers .23 31 Sensitivity Test 23 32 Operation Lodgement Test 26 APRIL 30, 2013 EARLY-SUPPRESSION FAST-RESPONSE SPRINKLERS - UL 1767 3UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL EXPOSURE AND CORROSION TEST 33 High Temperature Exposure Tes

20、t (90-Day) .28 34 Heat Resistance Test 29 35 Elastomeric Parts Test .29 36 Vibration Test .30 37 Freezing Test .30 38 Evaporation Test for Wax Coatings 31 39 10-Day Corrosion Test 31 39.1 General .31 39.2 Salt spray exposure 32 39.3 Moist hydrogen sulde air mixture 32 39.4 Moist carbon dioxide-sulfu

21、r dioxide air mixture .32 40 30-Day Corrosion Test 32 41 90-Day Moist Air Test 33 42 Exposure Tests on Sprinklers Incorporating Polymeric Gaskets .33 42.1 General .33 42.2 Corrosive exposures 33 42.3 Temperature cycling exposure .33 42.4 Hydrocarbon exposure followed by moist air exposure 34 42.5 Hy

22、drocarbon exposure followed by water immersion exposure .34 42.6 Exposure to antifreeze solutions .34 43 Dry-Type Sprinkler Deposit Loading Test .35 44 Dezincication Test of Brass Parts 36 44.1 General .36 44.2 Reagent .36 44.3 Test Pieces 36 44.4 Method .36 45 Stress-Corrosion Cracking of Brass Spr

23、inkler Parts Test .37 46 Stress-Corrosion Cracking of Stainless Steel Parts Test 37 WATER FLOW AND DISTRIBUTION TESTS 47 Calibration Test .38 48 Distribution Tests for Pendent ESFR Sprinklers Having a Nominal K-factor of 14.0 or 16.8 .40 49 ThrustForceTestforforPendentESFRSprinklersHavingaNominalK-f

24、actorof14.0or16.8 .41 FIRE TESTS 50 Water Impingement Test 42 51 Large Scale Fire Tests for Pendent ESFR Sprinklers 43 52 Actual Delivered Density (ADD) Test for Pendent ESFR Sprinklers Having a Nominal K-factor of 14.0 or 16.8 .60 MANUFACTURING AND PRODUCTION TESTS 53 General 65 54 Production Leaka

25、ge Test .65 55 Glass Bulb Integrity Test .65 MARKINGS 56 General 65 APRIL 30, 2013 EARLY-SUPPRESSION FAST-RESPONSE SPRINKLERS - UL 1767 4UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL INSTALLATION INSTRUCTIONS 57 reserved .66 APPENDIX A Sta

26、ndards for ComponentsA1 APPENDIX B TOLERANCE LIMIT CALCULATION METHODS B1 General B1 APRIL 30, 2013 EARLY-SUPPRESSION FAST-RESPONSE SPRINKLERS - UL 1767 5UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL INTRODUCTION 1 Scope 1.1 These requirem

27、ents cover early suppression fast response (ESFR) sprinklers having nominal discharge coefficients and installation orientations as referenced in this standard for installation as part of sprinkler systems for re-protection service. Requirements for installation and use of ESFR sprinklers are includ

28、ed in the Standard for the Installation of Sprinkler Systems, NFPA 13, as well as other NFPA standards. 1.2 The requirements in this standard are not intended to restrict the application of representative re and other tests for special sprinklers, as referenced in the Standard for the Installation o

29、f Sprinkler Systems, NFPA 13, that are intended to provide protection for specic re hazards. 2 Components 2.1 Except as indicated in 2.2, a component of a product covered by this standard shall comply with the requirements for that component. 2.2 A component is not required to comply with a specic r

30、equirement that: a) Involves a feature or characteristic not required in the application of the component in the product covered by this standard, or b) Is superseded by a requirement in this standard. 2.3 A component shall be used in accordance with its rating established for the intended condition

31、s of use. 2.4 Specic components are incomplete in construction features or restricted in performance capabilities. Such components are intended for use only under limited conditions, such as certain temperatures not exceeding specied limits, and shall be used only under those specic conditions. 3 Un

32、it Of Measurement 3.1 Values stated without parentheses are the requirement. Values in parentheses are explanatory or approximate information. APRIL 30, 2013 EARLY-SUPPRESSION FAST-RESPONSE SPRINKLERS - UL 1767 6UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT

33、PERMISSION FROM UL 4 Undated References 4.1 Any undated reference to a code or standard appearing in the requirements of this standard shall be interpreted as referring to the latest edition of that code or standard. 5 Glossary 5.1 For the purpose of these requirements, the following denitions apply

34、. 5.2 ACTUAL DELIVERED DENSITY (ADD) The rate at which water, discharged from a sprinkler, is actually deposited onto the top of the protected horizontal surface under a re condition. 5.3 ASSEMBLY LOAD The extension force applied to the sprinkler frame by the assembly of its operating mechanism. 5.4

35、 DELIVERED DENSITY The rate at which water, discharged from a sprinkler, is actually deposited onto the top of the protected horizontal surface under a nonre condition. 5.5 DISCHARGE COEFFICIENT K Coefficient of discharge in the formula: in which: Q is the ow in gallons per minute; and p is the pres

36、sure in pounds per square inch gauge. In SI units: Q is the ow in liters per minute; and p is the pressure in bar 5.6 DRY-TYPE SPRINKLER A sprinkler secured in an extension nipple that has a seal at the inlet end to prevent water from entering the nipple until the sprinkler operates. Note: Dry-type

37、ESFR sprinklers are intended for use on wet systems only since ESFR sprinklers are not intended for use in dry systems as referenced in NFPA 13. 5.7 EARLY SUPPRESSION A characteristic of sprinkler performance whereby the rst few operating sprinklers are able to deliver sufficient water to the re to

38、promptly reduce the re growth and ultimately suppress the re as indicated in the Standard for the Installation of Sprinkler Systems, NFPA 13. 5.8 EARLY-SUPPRESSION FAST-RESPONSE (ESFR) SPRINKLER A quick responding sprinkler that automatically discharges water over a specied area to provide early sup

39、pression of a re. APRIL 30, 2013 EARLY-SUPPRESSION FAST-RESPONSE SPRINKLERS - UL 1767 7UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL 5.9 HEAT RESPONSIVE ELEMENT That portion of a sprinkler that breaks, melts, or otherwise functions to init

40、iate the automatic operation of the sprinkler when sufficient heat has been absorbed. 5.10 HEPTANE Commercial grade heptane having the following characteristics: a) Minimum Initial Boiling Point of 190F (88C); b) Maximum Dry Point of 212F (100C); and c) Specic Gravity (60F/60F) (15.6C/15.6C) of 0.68

41、 0.73. 5.11 OPERATING TEMPERATURE The temperature at which the heat responsive element of a sprinkler operates when immersed in a liquid bath under controlled rate of rise conditions. 5.12 ORIFICE The opening, usually circular, that controls the amount of water discharged from a sprinkler at a given

42、 pressure. 5.13 PENDENT SPRINKLER A sprinkler intended to be installed so that its deector is located below the orice and the water ows downward against the deector. 5.14 REQUIRED DELIVERED DENSITY (RDD) The minimum rate of water that must be discharged onto the top of a protected horizontal surface

43、 under a re condition to achieve early suppression. 5.15 RESPONSE TIME INDEX (RTI) A measure of the thermal sensitivity of the sprinklers heat responsive element. 5.16 STANDARD FIRE TEST COMMODITY CARTONED GROUP A PLASTICS (UNEXPANDED) Single wall corrugated cardboard cartons measuring a nominal 21

44、by 21 by 20.5 inches (0.53 by 0.53 by 0.52 m) high containing 125 crystalline polystyrene cups in separate compartments within the carton. Single wall corrugated cardboard sheets are used to separate the ve layers of cups and interlocking single wall corrugated cardboard vertical dividers are used t

45、o separate the 25 cups in each layer. Eight of the cartons are arranged ina2x2x2array with the open end of the cups facing down and placed on a nominal 42 by 42 by 5 inches (1.1 by 1.1 by 0.13 m) high two-way hardwood pallet. 5.17 STANDARD FIRE TEST COMMODITY - CLASS II Double tri-wall corrugated ca

46、rdboard cartons with ve-sided steel (open bottom) stiffeners inserted for stability. The cartons are to comply with the requirements for Class 2, Style E, AAA uting as specied in the Federal Specication for Boxes, Fiberboard, Corrugated, Tri-Wall, PPP-B-640D. The two cartons have a combined nominal

47、thickness of 1 inch (25.4 mm). The a nominal measurements for the outside carton are 42 by 42 by 42 inches (1.1 by 1.1 by 1.1 m) and the nominal measurements for the inside carton are 41 by 41 by 41 inches (1.0 by 1.0 by 1.0 m). The cartons are to be placed on a nominal 42 by 42 by 5 inches high (1.

48、1 by 1.1 by 0.13 m) two-way hardwood pallet. 5.18 UPRIGHT SPRINKLER A sprinkler intended to be installed so that its deector is located above the orice and the water ows upward against the deector. APRIL 30, 2013 EARLY-SUPPRESSION FAST-RESPONSE SPRINKLERS - UL 1767 8UL COPYRIGHTED MATERIAL NOT AUTHO

49、RIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL CONSTRUCTION 6 General 6.1 An ESFR sprinkler shall be constructed to remain closed for extended periods of time without leakage and to open as intended and release all operating parts as specied in this standard. The closure of the water seat shall not be achieved by the use of a dynamic O-ring or similar seal (an O-ring or similar seal that moves during opera

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1