UL SUBJECT 199H-2014 UL Outline for Investigation for Fire Testing Of Specific Application Sprinklers For Use In Horizontal Concealed Spaces (Issue 1)《在水平隐蔽空间内使用的特定应用喷淋器火灾试验的UL调查大纲.pdf

上传人:wealthynice100 文档编号:1069211 上传时间:2019-04-02 格式:PDF 页数:18 大小:758.76KB
下载 相关 举报
UL SUBJECT 199H-2014 UL Outline for Investigation for Fire Testing Of Specific Application Sprinklers For Use In Horizontal Concealed Spaces (Issue 1)《在水平隐蔽空间内使用的特定应用喷淋器火灾试验的UL调查大纲.pdf_第1页
第1页 / 共18页
UL SUBJECT 199H-2014 UL Outline for Investigation for Fire Testing Of Specific Application Sprinklers For Use In Horizontal Concealed Spaces (Issue 1)《在水平隐蔽空间内使用的特定应用喷淋器火灾试验的UL调查大纲.pdf_第2页
第2页 / 共18页
UL SUBJECT 199H-2014 UL Outline for Investigation for Fire Testing Of Specific Application Sprinklers For Use In Horizontal Concealed Spaces (Issue 1)《在水平隐蔽空间内使用的特定应用喷淋器火灾试验的UL调查大纲.pdf_第3页
第3页 / 共18页
UL SUBJECT 199H-2014 UL Outline for Investigation for Fire Testing Of Specific Application Sprinklers For Use In Horizontal Concealed Spaces (Issue 1)《在水平隐蔽空间内使用的特定应用喷淋器火灾试验的UL调查大纲.pdf_第4页
第4页 / 共18页
UL SUBJECT 199H-2014 UL Outline for Investigation for Fire Testing Of Specific Application Sprinklers For Use In Horizontal Concealed Spaces (Issue 1)《在水平隐蔽空间内使用的特定应用喷淋器火灾试验的UL调查大纲.pdf_第5页
第5页 / 共18页
点击查看更多>>
资源描述

1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULFebruary 17, 20141UL 199HOutline of Investigation for Fire Testing Of Specific Application SprinklersFor Use In Horizontal Concealed SpacesIssue No. 1February 17, 2014Summary of TopicsThis First

2、Issue of the Outline of Investigation for Fire Testing of SpecificApplication Sprinklers for Use in Horizontal Concealed Spaces, UL 199H,is being issued to add requirements for sprinkler types not currentlycovered by UL 199.ULs Outlines of Investigation are copyrighted by UL. Neither a printed norel

3、ectronic copy of an Outline of Investigation should be altered in any way. All ofULs Outlines of Investigation and all copyrights, ownerships, and rights regardingthose Outlines of Investigation shall remain the sole and exclusive property of UL.COPYRIGHT 2014 UNDERWRITERS LABORATORIES INC.UL COPYRI

4、GHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULFEBRUARY 17, 2014UL 199H2No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULCONTENTSINTRODUCTION1 Scope .42 Components 43 Units of

5、 Measurement .44 Undated References 5PERFORMANCE5 Open Wood Truss Fire Tests 55.1 General .55.2 Test Arrangement 55.3 Test method 116 Solid Wood Joist Fire Tests 126.1 General 126.2 Test Arrangement .126.3 Test method 17FEBRUARY 17, 2014 UL 199H 3UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER RE

6、PRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULINTRODUCTION1 Scope1.1 These requirements cover the fire testing of specific application sprinklers for use in Light Hazardhorizontal concealed spaces formed by open wood trusses and solid wood joists when the sprinklers areinstalled in accordance

7、with the manufacturers instructions and the Standard for the Installation ofSprinkler Systems, NFPA 13.1.2 Sprinklers investigated in accordance with this Outline shall also comply with the applicablerequirements in the Standard for Automatic Sprinklers for Fire-Protection Service, UL 199, not inclu

8、dingthe fire and water distribution tests.2 Components2.1 Except as indicated in 2.2, a component of a product covered by this Outline shall comply with therequirements for that component.2.2 A component is not required to comply with a specific requirement that:a) Involves a feature or characterist

9、ic not required in the application of the component in theproduct covered by this Outline, orb) Is superseded by a requirement in this Outline.2.3 A component shall be used in accordance with its rating established for the intended conditions ofuse.2.4 Specific components are incomplete in construct

10、ion features or restricted in performance capabilities.Such components are intended for use only under limited conditions, such as temperatures not exceedingspecified limits, and shall be used only under those specific conditions.3 Units of Measurement3.1 Values stated without parentheses are the re

11、quirement. Values in parentheses are explanatory orapproximate information.FEBRUARY 17, 2014UL 199H4UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL4 Undated References4.1 Any undated reference to a code or standard appearing in the requiremen

12、ts of this Outline shall beinterpreted as referring to the latest edition of that code or standard.PERFORMANCE5 Open Wood Truss Fire Tests5.1 General5.1.1 When fire tested as described in 5.2.1 5.3.6, water discharged from the sprinklers shall becapable of controlling test fires originated in an ope

13、n truss concealed space such that compliance with thefollowing requirements is demonstrated:a) The sprinklers located beyond the draft curtains shall not operate.b) The sprinklers shall discharge water into the space in such a manner to prevent the loadedwood trusses from collapsing.5.1.2 The temper

14、ature rating of the sprinklers subjected to the tests specified in 5.2.1 5.3.6 shall berepresentative of the sprinkler temperature ratings referenced in the manufacturers installationinstructions.5.1.3 These sprinklers are intended to be installed within an area enclosed by draft currents notexceedi

15、ng 1000 sq. ft. which is to be referenced in the manufacturers installation instructions.5.2 Test Arrangement5.2.1 Test structure5.2.1.1 Fire tests shall be conducted using open wood trusses having the minimum and maximum depthreferenced in the manufacturers installation instructions, but no greater

16、 than 60 inches (1.5 m). Each teststructure shall be constructed to have nominal dimensions of 40 ft. (12.2 m) long by 24 ft. (7.3 m) wide tosimulate the maximum draft curtain area of 1000 sq. ft. referenced in the manufacturers installationinstructions. Each test structure shall be constructed usin

17、g a combination of 20 ft. (6.1 m) and 10 ft. (3 m)long trusses spaced a nominal 24 inches (610 mm) apart. Each truss shall be constructed of trade size 2by 4 inch (nominal 1.5 inch (3.8 cm) by 3.5 inch (8.9 mm) spruce, pine or fir lumber. Figure 5.1 illustratesthe typical wood trusses used to constr

18、uct the test structure. The distance between trusses shall bepermitted to be adjusted to provide the minimum obstruction distance to the sprinkler.This is generated text for figtxt.FEBRUARY 17, 2014 UL 199H 5UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMI

19、SSION FROM ULFigure 5.1Typical truss detailFEBRUARY 17, 2014UL 199H6UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL5.2.1.2 A draft curtain having a depth of 1/3 the height of the truss or 8 inches (204 mm), whichever isgreater, shall be insta

20、lled around the perimeter of the test structure. The draft curtain shall be constructedof nominal 1/4 inch (6.4 mm) thick plywood. Tongue and groove oriented strand board having a nominalthickness of 3/4 inch (19 mm) shall be installed onto the top of the trusses and nominal 1/2 inch (12.7 mm)thick

21、gypsum board shall be installed onto the bottom of the trusses. A noncombustible material such ascement board is to be installed on top of the orientated stand board in the location of the ignition to providefor the entrapment of hot gases in the event of a fire induced breach of the orientated stra

22、nd board. Thebottom plane of the test structure is to be located above the floor of the test room to provide foraccessibility to replace structure members between tests. See Figure 5.1 for an illustration of the typicaltest arrangement.5.2.1.3 To allow for the installation of sprinklers beyond the p

23、rimary test area surrounded by the draftcurtains, the upper plane of the structure is to be extended by 4 ft. (1.2 m) on each end. This extendedarea shall also be surrounded by draft curtains having the same depth as the draft curtains used for theprimary test area. See Figure 5.2 for additional det

24、ails regarding the location of the draft curtains.This is generated text for figtxt.FEBRUARY 17, 2014 UL 199H 7UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULFigure 5.2Open wood truss fire test arrangementFEBRUARY 17, 2014UL 199H8UL COPYRIGHT

25、ED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL5.2.1.4 The two trusses nearest the ignition location shall be subjected to a load correlating to themaximum truss design load specified by the truss manufacturer. See Figure 5.3 for an illustration of thety

26、pical loading arrangement.This is generated text for figtxt.FEBRUARY 17, 2014 UL 199H 9UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULFigure 5.3Typical loading truss arrangementFEBRUARY 17, 2014UL 199H10UL COPYRIGHTED MATERIAL NOT AUTHORIZED

27、FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL5.2.2 Ignition source5.2.2.1 For fire tests using the minimum depth trusses, a nominal 8 lb. (3.6 kg) wood crib consisting offive alternate layers of four trade size 2 by 2 inch kiln-dried spruce of fir lumber 12 inches (300 mm) longp

28、laced on top of 12 by 12 by 4 inch (300 by 300 by 102 mm) steel pan containing 8 ounces (0.24 L)heptane and 16 ounces (0.48 L) water is to be used. For fire tests using the maximum depth trusses, anominal 13 lb. (5.9 kg) wood crib consisting of eight alternate layers of four trade size 2 by 2 inch k

29、iln-driedspruce or fir lumber 12 inches (300 mm) long placed on top of 12 by 12 by 4 inch (300 by 300 by 102mm) steel pan containing 8 ounces (0.24 L) heptane and 16 ounces (0.48 L) water is to be used. For allcribs, the alternate layers are to be placed at right angles to the adjacent layers and th

30、e individual woodmembers in each layer are to be evenly spaced along the length of the previous layer of wood membersand stapled.5.2.3 Sprinkler installation5.2.3.1 Eight sprinklers are to be installed within the primary test area with the sprinklers nearest theignition location at the maximum spaci

31、ng referenced in the manufacturers installation instructions.Additional target sprinklers are to be installed within the extended areas of the test structure to determineif sprinklers located beyond the primary test area operate. See Figure 2 for additional informationregarding the location of the s

32、prinklers.5.2.3.2 The sprinklers located within the primary test area are to be installed onto a piping configurationhaving the sprinkler branch lines connected to a nominal 1-1/2 inch diameter or larger supply piping toprovide the required water flow to each sprinkler installed within the primary t

33、est area. The targetsprinklers at the ends of the test structure are not required to be connected to a water supply.5.2.3.3 All sprinklers are to be installed at the maximum distance below the upper deck referenced in themanufacturers installation instructions. Sprinklers nearest the ignition locati

34、on shall be installed at alocation that considers the obstruction limitations referenced in the manufacturers installation instructions.5.3 Test method5.3.1 Tests are to be conducted with an ignition location between two sprinklers and between foursprinklers. Representative fire tests are to be cond

35、ucted at (1) the minimum inlet pressure to the sprinklersreferenced in the manufacturers installation instructions when the sprinklers are installed at theirmaximum coverage area and (2) the minimum allowable inlet pressure to the sprinklers, but not less than7 psig (48kPa), when the sprinklers are

36、installed with a coverage area less than the maximum coveragearea referenced in the manufacturers installation instructions. In no case shall the sprinkler dischargedensity be less than 0.10 gpm/ft2(4 mm/min).5.3.2 If sprinkler protection is intended using both wet and dry sprinkler systems, fire te

37、sts shall beconducted using a simulated dry system. For the simulated dry system tests, the water delivery to thesprinklers shall be delayed 60 seconds after the first sprinkler operates.5.3.3 The moisture content of the trusses in the area of the fire involvement shall be within 6 to 12percent.FEBR

38、UARY 17, 2014 UL 199H 11UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL5.3.4 For the fire tests using the minimum truss height, an opening slightly larger than the area of the topof the wood crib is to be provided in the bottom of the test st

39、ructure to allow for the installation of theignition source. An adjustable platform is to be provided for the heptane pan so that the nominal 8 lb (3.6kg) wood crib, which is placed on the top of the pan, can be inserted through the opening and positionedso that the bottom of the crib is at the same

40、 elevation as the lower plane of the trusses. For the fire testsusing the maximum truss height, both the heptane pan and wood crib are to be placed inside the teststructure.5.3.5 To initiate each fire test, the heptane in the pan located beneath the crib is to be ignited.5.3.6 The fire test is to be

41、 conducted for 30 minutes after the first sprinkler operates unless all thecombustibles are extinguished prior to this time. The water pressure supplied to the sprinklers shall be inaccordance with 5.3.1.6 Solid Wood Joist Fire Tests6.1 General6.1.1 When fire tested as described in 6.2.1 6.3.6, wate

42、r discharged from the sprinklers shall becapable of controlling test fires originated in a space formed by solid wood joists such that the targetsprinklers located beyond the joist space blocking and draft curtains do not operate.6.1.2 The temperature rating of the sprinklers subjected to the tests

43、specified in 6.2.1 6.3.6 shall berepresentative of the sprinkler temperature ratings referenced in the manufacturers installationinstructions.6.2 Test Arrangement6.2.1 Test room6.2.1.1 Fire tests shall be conducted using solid wood joists having the minimum and maximum distancebetween the bottoms of

44、 the upper plane joists to the top of the lower plane joists referenced in themanufacturers installation instructions. The test structure shall be of 48 ft. (12.2 m) in length or longer ifneeded to accommodate the installation of 8 sprinklers within the primary test area. The total width of thearea

45、with joists installed at the upper and lower planes shall be 4 ft. (1.2 m) wider than the maximumsprinkler spacing referenced in the manufacturers installation instructions. The upper plane of the teststructure shall be constructed of nominal 2 by 12 inch solid wood joists spaced 16 inches (406 mm)

46、apartwith tongue and groove orientated strand board having a nominal thickness of 3/4 inch (19 mm) installedonto the top of the joists. The orientated strand board is to be extended beyond the sides of the upperplane joists so that the total width of the upper deck is 24 ft. (7.3 m). The lower plane

47、 of the test structureshall be constructed of nominal 2 by 6 inch solid wood joists spaced 16 inches (406 mm) apart withnominal 1/2-inch (12.7-mm) thick orientated strand board installed onto the bottom of the joists. The solidwood joists shall be made of spruce, pine or fir.6.2.1.2 For the upper pl

48、ane of the test structure, each joist channel shall be provided with blocking within2 ft. (0.61 m) beyond the last row of sprinklers on each end of the primary test area. Sections of the woodjoists are to be used to construct the blocking and are to span the entire width and depth of the joistchanne

49、l. Draft curtains extending 1/3 of the distance between upper and lower joists or 6 inches (153mm), whichever is greater, below the bottom of the upper joists is to be installed around the perimeter ofthe test structure. The draft curtains shall be constructed of nominal 1/4 inch (6.4 mm) thick plywood. Anoncombustible material such as cement board is to be installed onto the top of the orientated strandboard in the location of the ignition to provide for the entrapment of hot gases in the event of a fire inducedbreach of the orientated strand board. See Fi

展开阅读全文
相关资源
猜你喜欢
  • ASTM B163-2008 Standard Specification for Seamless Nickel and Nickel Alloy Condenser and Heat-Exchanger Tubes《冷凝器及热交换器用无缝镍和镍合金管的标准规范》.pdf ASTM B163-2008 Standard Specification for Seamless Nickel and Nickel Alloy Condenser and Heat-Exchanger Tubes《冷凝器及热交换器用无缝镍和镍合金管的标准规范》.pdf
  • ASTM B163-2011 Standard Specification for Seamless Nickel and Nickel Alloy (UNS N06845) Condenser and Heat-Exchanger Tubes《无缝镍和镍合金(UNS N06845)冷凝器和换热器管的标准规格》.pdf ASTM B163-2011 Standard Specification for Seamless Nickel and Nickel Alloy (UNS N06845) Condenser and Heat-Exchanger Tubes《无缝镍和镍合金(UNS N06845)冷凝器和换热器管的标准规格》.pdf
  • ASTM B163-2011(2017) Standard Specification for Seamless Nickel and Nickel Alloy Condenser and Heat-Exchanger Tubes《冷凝器和热交换器用无缝镍和镍合金管的标准规格》.pdf ASTM B163-2011(2017) Standard Specification for Seamless Nickel and Nickel Alloy Condenser and Heat-Exchanger Tubes《冷凝器和热交换器用无缝镍和镍合金管的标准规格》.pdf
  • ASTM B163-2011e1 Standard Specification for Seamless Nickel and Nickel Alloy Condenser and Heat-Exchanger Tubes《无缝镍及镍合金冷凝器和换热器管的标准规格》.pdf ASTM B163-2011e1 Standard Specification for Seamless Nickel and Nickel Alloy Condenser and Heat-Exchanger Tubes《无缝镍及镍合金冷凝器和换热器管的标准规格》.pdf
  • ASTM B163-2011e2 Standard Specification for Seamless Nickel and Nickel Alloy Condenser and Heat-Exchanger Tubes《冷凝器及热交换器用无缝镍和镍合金管的标准规格》.pdf ASTM B163-2011e2 Standard Specification for Seamless Nickel and Nickel Alloy Condenser and Heat-Exchanger Tubes《冷凝器及热交换器用无缝镍和镍合金管的标准规格》.pdf
  • ASTM B164-2003 Standard Specification for Nickel-Copper Alloy Rod Bar and Wire《镍铜合金杆材、棒材和线材标准规范》.pdf ASTM B164-2003 Standard Specification for Nickel-Copper Alloy Rod Bar and Wire《镍铜合金杆材、棒材和线材标准规范》.pdf
  • ASTM B164-2003(2008) Standard Specification for Nickel-Copper Alloy Rod Bar and Wire《镍铜合金条材、棒材和线材的标准规范》.pdf ASTM B164-2003(2008) Standard Specification for Nickel-Copper Alloy Rod Bar and Wire《镍铜合金条材、棒材和线材的标准规范》.pdf
  • ASTM B164-2003(2014) Standard Specification for Nickel-Copper Alloy Rod Bar and Wire《镍铜合金杆材 棒材和线材的标准规格》.pdf ASTM B164-2003(2014) Standard Specification for Nickel-Copper Alloy Rod Bar and Wire《镍铜合金杆材 棒材和线材的标准规格》.pdf
  • ASTM B165-2005 Standard Specification for Nickel-Copper Alloy (UNS N04400) Seamless Pipe and Tube《无缝镍铜合金管标准规范(UNS N04400)》.pdf ASTM B165-2005 Standard Specification for Nickel-Copper Alloy (UNS N04400) Seamless Pipe and Tube《无缝镍铜合金管标准规范(UNS N04400)》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1