VA 01 33 23-2012 SHOP DRAWINGS PRODUCT DATA AND SAMPLES.pdf

上传人:赵齐羽 文档编号:1074656 上传时间:2019-04-06 格式:PDF 页数:5 大小:22.33KB
下载 相关 举报
VA 01 33 23-2012 SHOP DRAWINGS PRODUCT DATA AND SAMPLES.pdf_第1页
第1页 / 共5页
VA 01 33 23-2012 SHOP DRAWINGS PRODUCT DATA AND SAMPLES.pdf_第2页
第2页 / 共5页
VA 01 33 23-2012 SHOP DRAWINGS PRODUCT DATA AND SAMPLES.pdf_第3页
第3页 / 共5页
VA 01 33 23-2012 SHOP DRAWINGS PRODUCT DATA AND SAMPLES.pdf_第4页
第4页 / 共5页
VA 01 33 23-2012 SHOP DRAWINGS PRODUCT DATA AND SAMPLES.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、03-01-12 01 33 23 - 1 SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SPEC WRITER NOTE: Delete between /- / if not applicable to project. Also delete any other item or paragraph not applicable in the sections and renumber the paragraphs. 1-1. Refer to Articles titled SPECIFICATIONS AND DRA

2、WINGS FOR CONSTRUCTION (FAR 52.236-21) and, SPECIAL NOTES (VAAR 852.236-91), in GENERAL CONDITIONS. 1-2. For the purposes of this contract, samples / (including laboratory samples to be tested) /, test reports, certificates, and manufacturers literature and data shall also be subject to the previous

3、ly referenced requirements. The following text refers to all items collectively as SUBMITTALS. 1-3. Submit for approval, all of the items specifically mentioned under the separate sections of the specification, with information sufficient to evidence full compliance with contract requirements. Mater

4、ials, fabricated articles and the like to be installed in permanent work shall equal those of approved submittals. After an item has been approved, no change in brand or make will be permitted unless: A. Satisfactory written evidence is presented to, and approved by Contracting Officer, that manufac

5、turer cannot make scheduled delivery of approved item or; B. Item delivered has been rejected and substitution of a suitable item is an urgent necessity or; C. Other conditions become apparent which indicates approval of such substitute item to be in best interest of the Government. 1-4. Forward sub

6、mittals in sufficient time to permit proper consideration and approval action by Government. Time submission to assure adequate lead time for procurement of contract - required items. Delays attributable to untimely and rejected submittals / (including any laboratory samples to be tested) / will not

7、 serve as a basis for extending contract time for completion. 1-5. Submittals will be reviewed for compliance with contract requirements by Architect-Engineer, and action thereon will be taken by Resident Engineer on behalf of the Contracting Officer. 1-6. Upon receipt of submittals, Architect-Engin

8、eer will assign a file number thereto. Contractor, in any subsequent correspondence, shall refer to Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-03-01-12 01 33 23 - 2 this file and identification number to expedite replies relative to previously a

9、pproved or disapproved submittals. 1-7. The Government reserves the right to require additional submittals, whether or not particularly mentioned in this contract. If additional submittals beyond those required by the contract are furnished pursuant to request therefor by Contracting Officer, adjust

10、ment in contract price and time will be made in accordance with Articles titled CHANGES (FAR 52.243-4) and CHANGES - SUPPLEMENT (VAAR 852.236-88) of the GENERAL CONDITIONS. 1-8. Schedules called for in specifications and shown on shop drawings shall be submitted for use and information of Department

11、 of Veterans Affairs and Architect-Engineer. However, the Contractor shall assume responsibility for coordinating and verifying schedules. The Contracting Officer and Architect- Engineer assumes no responsibility for checking schedules or layout drawings for exact sizes, exact numbers and detailed p

12、ositioning of items. 1-9. Submittals must be submitted by Contractor only and shipped prepaid. Contracting Officer assumes no responsibility for checking quantities or exact numbers included in such submittals. A. /Submit samples required by Section 09 06 00, SCHEDULE FOR FINISHES, in quadruplicate.

13、 / Submit / other / samples in single units unless otherwise specified. Submit shop drawings, schedules, manufacturers literature and data, and certificates in quadruplicate, except where a greater number is specified. B. Submittals will receive consideration only when covered by a transmittal lette

14、r signed by Contractor. Letter shall be sent via first class mail /FAX / and shall contain the list of items, name of / Medical Center / Cemetery /, name of Contractor, contract number, applicable specification paragraph numbers, applicable drawing numbers (and other information required for exact i

15、dentification of location for each item), manufacturer and brand, ASTM or Federal Specification Number (if any) and such additional information as may be required by specifications for particular item being furnished. In addition, catalogs shall be marked to indicate specific items submitted for app

16、roval. 1. A copy of letter must be enclosed with items, and any items received without identification letter will be considered “unclaimed goods“ and held for a limited time only. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-03-01-12 01 33 23 - 3

17、2. Each sample, certificate, manufacturers literature and data shall be labeled to indicate the name and location of the / Medical Center / Cemetery /, name of Contractor, manufacturer, brand, contract number and ASTM or Federal Specification Number as applicable and location(s) on project. 3. Requi

18、red certificates shall be signed by an authorized representative of manufacturer or supplier of material, and by Contractor. SPEC WRITER NOTE: Omit following subparagraph “C“ if laboratory tests are not required. C. In addition to complying with the applicable requirements specified in preceding Art

19、icle 1.9, samples which are required to have Laboratory Tests (those preceded by symbol “LT“ under the separate sections of the specification shall be tested, at the expense of Contractor, in a commercial laboratory approved by Contracting Officer. 1. Laboratory shall furnish Contracting Officer wit

20、h a certificate stating that it is fully equipped and qualified to perform intended work, is fully acquainted with specification requirements and intended use of materials and is an independent establishment in no way connected with organization of Contractor or with manufacturer or supplier of mate

21、rials to be tested. 2. Certificates shall also set forth a list of comparable projects upon which laboratory has performed similar functions during past five years. 3. Samples and laboratory tests shall be sent directly to approved commercial testing laboratory. 4. Contractor shall send a copy of tr

22、ansmittal letter to both Resident Engineer and to Architect-Engineer simultaneously with submission of material to a commercial testing laboratory. /4. Contractor shall forward a copy of transmittal letter to Resident Engineer simultaneously with submission to a commercial testing laboratory /. 5. L

23、aboratory test reports shall be sent directly to Resident Engineer for appropriate action. 6. Laboratory reports shall list contract specification test requirements and a comparative list of the laboratory test results. When tests show that the material meets specification requirements, the laborato

24、ry shall so certify on test report. 7. Laboratory test reports shall also include a recommendation for approval or disapproval of tested item. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-03-01-12 01 33 23 - 4 D. If submittal samples have been dis

25、approved, resubmit new samples as soon as possible after notification of disapproval. Such new samples shall be marked “Resubmitted Sample“ in addition to containing other previously specified information required on label and in transmittal letter. E. Approved samples will be kept on file by the Re

26、sident Engineer at the site until completion of contract, at which time such samples will be delivered to Contractor as Contractors property. Where noted in technical sections of specifications, approved samples in good condition may be used in their proper locations in contract work. At completion

27、of contract, samples that are not approved will be returned to Contractor only upon request and at Contractors expense. Such request should be made prior to completion of the contract. Disapproved samples that are not requested for return by Contractor will be discarded after completion of contract.

28、 F. Submittal drawings (shop, erection or setting drawings) and schedules, required for work of various trades, shall be checked before submission by technically qualified employees of Contractor for accuracy, completeness and compliance with contract requirements. These drawings and schedules shall

29、 be stamped and signed by Contractor certifying to such check. 1. For each drawing required, submit one legible photographic paper or vellum reproducible. 2. Reproducible shall be full size. 3. Each drawing shall have marked thereon, proper descriptive title, including /Medical Center / Cemetery / l

30、ocation, project number, manufacturers number, reference to contract drawing number, detail Section Number, and Specification Section Number. 4. A space 120 mm by 125 mm (4-3/4 by 5 inches) shall be reserved on each drawing to accommodate approval or disapproval stamp. 5. Submit drawings, ROLLED WIT

31、HIN A MAILING TUBE, fully protected for shipment. 6. One reproducible print of approved or disapproved shop drawings will be forwarded to Contractor. 7. When work is directly related and involves more than one trade, shop drawings shall be submitted to Architect-Engineer under one cover. 1-10. Sampl

32、es / (except laboratory samples), / shop drawings, test reports, certificates and manufacturers literature and data, shall be submitted for approval to _ (Architect-Engineer) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-03-01-12 01 33 23 - 5 _ (A/

33、E P.O. Address) _ (City, State and Zip Code) 1-11. At the time of transmittal to the Architect-Engineer, the Contractor shall also send a copy of the complete submittal directly to the Resident Engineer. SPEC WRITER NOTE: Include following paragraph only if samples are to be sent to project site. If

34、 so, delete reference to samples in Paragraph 1-10. 1-12. Samples / (except laboratory samples) / for approval shall be sent to Architect-Engineer, in care of Resident Engineer, VA Medical Center, _ (P.O. Address) _ (City, State and Zip Code) - - - E N D - - - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS ISO 14085-1-2015 Aerospace series Hydraulic filter elements Test methods Test sequence《航空航天系列 液压过滤器滤芯 试验方法 试验顺序》.pdf BS ISO 14085-1-2015 Aerospace series Hydraulic filter elements Test methods Test sequence《航空航天系列 液压过滤器滤芯 试验方法 试验顺序》.pdf
  • BS ISO 14085-2-2015 Aerospace series Hydraulic filter elements Test methods Conditioning《航空航天系列 液压过滤器滤芯 试验方法 调节》.pdf BS ISO 14085-2-2015 Aerospace series Hydraulic filter elements Test methods Conditioning《航空航天系列 液压过滤器滤芯 试验方法 调节》.pdf
  • BS ISO 14085-3-2015 Aerospace series Hydraulic filter elements Test methods Filtration efficiency and retention capacity《航空航天系列 液压过滤器滤芯 试验方法 过滤效率和保持能力》.pdf BS ISO 14085-3-2015 Aerospace series Hydraulic filter elements Test methods Filtration efficiency and retention capacity《航空航天系列 液压过滤器滤芯 试验方法 过滤效率和保持能力》.pdf
  • BS ISO 14085-4-2015 Aerospace series Hydraulic filter elements Test methods Verification of collapse burst pressure rating《航空航天系列 液压过滤器滤芯 试验方法 塌陷 破裂额定压力的检验》.pdf BS ISO 14085-4-2015 Aerospace series Hydraulic filter elements Test methods Verification of collapse burst pressure rating《航空航天系列 液压过滤器滤芯 试验方法 塌陷 破裂额定压力的检验》.pdf
  • BS ISO 14085-5-2015 Aerospace series Hydraulic filter elements Test methods Resistance to flow fatigue《航空航天系列 液压过滤器滤芯 试验方法 抗流动疲劳性》.pdf BS ISO 14085-5-2015 Aerospace series Hydraulic filter elements Test methods Resistance to flow fatigue《航空航天系列 液压过滤器滤芯 试验方法 抗流动疲劳性》.pdf
  • BS ISO 14085-6-2015 Aerospace series Hydraulic filter elements Test methods Initial cleanliness level《航空航天系列 液压过滤器滤芯 试验方法 初始清洁水平》.pdf BS ISO 14085-6-2015 Aerospace series Hydraulic filter elements Test methods Initial cleanliness level《航空航天系列 液压过滤器滤芯 试验方法 初始清洁水平》.pdf
  • BS ISO 1409-2007 Plastics rubber - Polymer dispersions and rubber latices (natural and synthetic) Determination of surface tension by the ring method《塑料 橡胶 聚合物分散体和橡胶胶乳(天然的和合成的) 用环形.pdf BS ISO 1409-2007 Plastics rubber - Polymer dispersions and rubber latices (natural and synthetic) Determination of surface tension by the ring method《塑料 橡胶 聚合物分散体和橡胶胶乳(天然的和合成的) 用环形.pdf
  • BS ISO 14104-2017 Gears Surface temper etch inspection after grinding chemical method《齿轮 磨削后表面回火腐蚀检验 化学方法》.pdf BS ISO 14104-2017 Gears Surface temper etch inspection after grinding chemical method《齿轮 磨削后表面回火腐蚀检验 化学方法》.pdf
  • BS ISO 14117-2013 Active implantable medical devices Electromagnetic compatibility EMC test protocols for implantable cardiac pacemakers implantable cardioverter defibrillators and.pdf BS ISO 14117-2013 Active implantable medical devices Electromagnetic compatibility EMC test protocols for implantable cardiac pacemakers implantable cardioverter defibrillators and.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1