1、07-11 02 82 13.13 - i SECTION 02 82 13.13 GLOVEBAG ASBESTOS ABATEMENT TABLE OF CONTENTS PART 1 - GENERAL 1 1.1 SUMMARY OF THE WORK . 1 1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS . 1 1.1.2 EXTENT OF WORK 2 1.1.3 RELATED WORK 2 1.1.4 TASKS . 3 1.1.5 ABATEMENT CONTRACTOR USE OF PREMISES 3 1.2 VA

2、RIATIONS IN QUANTITY 3 1.3 STOP ASBESTOS REMOVAL . 4 1.4 DEFINITIONS . 4 1.4.1 GENERAL . 4 1.4.2 GLOSSARY 4 1.4.3 REFERENCED STANDARDS ORGANIZATIONS . 11 1.5 APPLICABLE CODES AND REGULATIONS . 12 1.5.1 GENERAL APPLICABILITY OF CODES, REGULATIONS, AND STANDARDS . 12 1.5.2 Asbestos Abatement CONTRACTO

3、R RESPONSIBILITY . 12 1.5.3 FEDERAL REQUIREMENTS . 13 1.5.4 STATE REQUIREMENTS: 13 1.5.5 LOCAL REQUIREMENTS . 13 1.5.6 STANDARDS 13 1.5.7 EPA GUIDANCE DOCUMENTS . 14 1.5.8 NOTICES 14 1.5.9 PERMITS/LICENSES . 14 1.5.10 POSTING AND FILING OF REGULATIONS . 14 1.5.11 VA RESPONSIBILITIES . 14 1.5.12 EMER

4、GENCY ACTION PLAN AND ARRANGEMENTS 15 1.5.14 PRE-Construction MEETING 15 1.6 PROJECT COORDINATION . 16 1.6.1 PERSONNEL 16 1.7 RESPIRATORY PROTECTION . 17 1.7.1 GENERAL - RESPIRATORY PROTECTION PROGRAM . 17 1.7.2 RESPIRATORY PROTECTION PROGRAM COORDINATOR . 18 1.7.3 SELECTION AND USE OF RESPIRATORS .

5、 18 1.7.4 MINIMUM RESPIRATORY PROTECTION . 18 Copyright International Organization for Standardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 13.13 - ii 1.7.5 MEDICAL WRITTEN OPINION 18 1.7.6 RESPIRATOR FI

6、T TEST 18 1.7.7 RESPIRATOR FIT CHECK . 18 1.7.8 MAINTENANCE AND CARE OF RESPIRATORS 18 1.8 WORKER PROTECTION 19 1.8.1 TRAINING OF ABATEMENT PERSONNEL 19 1.8.2 MEDICAL EXAMINATIONS . 19 1.8.3 personal PROTECTIVE EQUIPMENT 19 1.8.4 REGULATED AREA ENTRY PROCEDURE . 19 1.8.5 DECONTAMINATION PROCEDURE 19

7、 1.8.6 REGULATED AREA REQUIREMENTS 20 1.9 DECONTAMINATION FACILITIES . 20 1.9.1 DESCRIPTION 20 1.9.2 GENERAL REQUIREMENTS . 20 1.9.3 TEMPORARY FACILITIES TO THE PDF and w/EDF 21 1.9.4 PERSONNEL DECONTAMINATION FACILITY (PDF) . 21 1.9.5 waste/EQUIPMENT DECONTAMINATION FACILITY (w/EDF) . 22 1.9.6 wast

8、e/EQUIPMENT DECONTAMINATION PROCEDURES . 23 PART 2 - PRODUCTS, MATERIALS AND EQUIPMENT . 24 2.1 MATERIALS AND EQUIPMENT 24 2.1.1 GENERAL REQUIREMENTS (all abatement projects) 24 2.2 CONTAINMENT BARRIERS AND COVERINGS IN THE REGULATED AREA . 25 2.2.1 GENERAL 25 2.2.2 PREPARATION PRIOR TO SEALING THE

9、REGULATED AREA 25 2.2.3 CONTROLLING ACCESS TO THE REGULATED AREA . 25 2.2.4 CRITICAL BARRIERS 25 2.2.5 SECONDARY BARRIERS . 26 2.2.6 EXTENSION OF THE REGULATED AREA 26 2.2.7 FIRESTOPPING . 26 2.3 MONITORING, INSPECTION AND TESTING . 26 2.3.1 GENERAL 26 2.3.2 SCOPE OF SERVICES OF THE VPIH/cih CONSULT

10、ANT . 27 2.3.3 MONITORING, INSPECTION AND TESTING BY ABATEMENT CONTRACTOR CPIH/CIH . 28 2.4 Asbestos hazard abatement plan . 29 2.5 SUBMITTALS . 29 2.5.1 PRE-start MEETING SUBMITTALS . 29 2.5.2 SUBMITTALS DURING ABATEMENT 31 Copyright International Organization for Standardization Provided by IHS un

11、der license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 13.13 - iii 2.5.3 SUBMITTALS AT COMPLETION OF ABATEMENT 31 2.6 ENCAPSULANTS . 31 2.6.1 TYPES OF ENCAPSULANTS 31 2.6.2 PERFORMANCE REQUIREMENTS . 32 2.7 CERTIFICATES OF COMPLIANCE . 32

12、2.8 RECYCLABLE PROTECTIVE CLOTHING . 32 PART 3 EXECUTION . 32 3.1 REGULATED AREA PREPARATIONS 32 3.1.1 SITE SECURITY 32 3.1.2 OSHA DANGER SIGNS 33 3.1.3.1 SHUT DOWN - LOCK OUT ELECTRICAL 33 3.1.3.2 SHUT DOWN - LOCK OUT HVAC 34 3.1.4 CONTAINMENT BARRIERS AND COVERINGS FOR THE REGULATED AREA 34 3.1.4.

13、1 GENERAL 34 3.1.4.2 PREPARATION PRIOR TO SEALING OFF . 34 3.1.4.3 CONTROLLING ACCESS TO THE REGULATED AREA . 34 3.1.4.4 CRITICAL BARRIERS 34 3.1.4.5 EXTENSION OF THE REGULATED AREA 35 3.1.4.6 floor barriers: 35 3.1.5 SANITARY FACILITIES 35 3.1.6 Pre-Cleaning . 35 3.1.6.1 PRE-CLEANING MOVABLE OBJECT

14、S . 35 3.1.6.2 PRE-CLEANING FIXED OBJECTS . 35 3.1.6.3 PRE-CLEANING SURFACES IN THE REGULATED AREA 36 3.1.7 PRE-ABATEMENT ACTIVITIES . 36 3.1.7.1 PRE-ABATEMENT MEETING 36 3.1.7.2 PRE-ABATEMENT INSPECTIONS AND PREPARATIONS . 36 3.1.7.3 PRE-ABATEMENT CONSTRUCTION AND OPERATIONS 37 3.2 REMOVAL OF pipin

15、g ACM 38 3.2.1 WETTING MATERIALS 38 3.2.2 SECONDARY BARRIER AND WALKWAYS . 38 3.2.3 WET REMOVAL OF ACM . 38 3.3 GLOVEBAG REMOVAL PROCEDURES 39 3.3.1 GENERAL 39 3.3.2 NEGATIVE PRESSURE GLOVEBAG PROCEDURE . 40 3.4 LOCKDOWN ENCAPSULATION . 40 3.4.1 GENERAL 40 Copyright International Organization for St

16、andardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 13.13 - iv 3.4.2 SEALING EXPOSED EDGES 40 3.5 DISPOSAL OF ACM WASTE MATERIALS 40 3.5.1 GENERAL 40 3.5.2 PROCEDURES . 40 3.6 PROJECT DECONTAMINATION 41 3

17、.6.1 GENERAL 41 3.6.2 REGULATED AREA CLEARANCE . 41 3.6.3 WORK DESCRIPTION . 41 3.6.4 PRE-DECONTAMINATION CONDITIONS . 41 3.6.5 FIRST CLEANING . 41 3.6.6 PRE-CLEARANCE INSPECTION AND TESTING . 42 3.6.7 LOCKDOWN ENCAPSULATION OF ABATED SURFACES 42 3.7 FINAL VISUAL INSPECTIOns AND AIR CLEARANCE TESTIN

18、G . 42 3.7.1 GENERAL 42 3.7.2 FINAL VISUAL INSPECTION 42 3.7.3 FINAL AIR CLEARANCE TESTING 42 3.7.4 FINAL AIR CLEARANCE PROCEDURES . 43 3.7.5 CLEARANCE SAMPLING USING PCM . 43 3.7.6 CLEARANCE SAMPLING USING TEM . 43 3.7.7 LABORATORY TESTING OF PCM SAMPLES 43 3.7.8 LABORATORY TESTING OF TEM SAMPLES 4

19、4 3.8 ABATEMENT CLOSEOUT AND CERTIFICATE OF COMPLIANCE . 44 3.8.1 COMPLETION OF ABATEMENT WORK . 44 3.8.2 CERTIFICATE OF COMPLETION BY CONTRACTOR 44 3.8.3 WORK SHIFTS 44 3.8.4 RE-INSULATION 44 ATTACHMENT #1 45 ATTACHMENT #2 46 ATTACHMENT #3 48 ATTACHMENT #4 49 Copyright International Organization fo

20、r Standardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 13.1302 02 82 13.13 - 1 INSTRUCTIONS TO ARCHITECT/ENGINEER AND INDUSTRIAL HYGIENE CONSULTANT SECTION 02 82 13.13 GLOVEBAG ASBESTOS ABATEMENT 1. Thes

21、e specifications provide general guidance to personnel given the task of designing and executing a Class I asbestos glovebag abatement project. Each abatement is a unique situation and therefore must be tailored for that project. This specification incorporates current regulatory requirements and cu

22、rrent best abatement practices, procedures and technology. The Architect/Engineer and/or the Industrial Hygiene consultants may provide additional specification additions or deletions to this specification that, in their professional judgment, will ensure a safe and effective approach to a specific

23、abatement project while maintaining compliance with applicable regulations and VA policy. Any changes must be clearly marked on/attached to this document prior to finalization of the specification so that the changes will be adequately considered in the review process by the VA. 2. These specificati

24、ons are to be used in conjunction with Contractor selection criteria; special instructions package; and general construction provisions. 3. Paragraphs that are not preceded by a number code are indented as instructions to the specifications writer and identified by the notation “Spec Writer Notes“.

25、These paragraphs must be deleted from the final document. 4. Within the text of the specifications, there may be optional procedures which the specification writer could include in the final specification. Procedures which are not chosen must be deleted by the specification writer. Optional text is

26、shown by the notation (/text/). 5. The specification writer, VPIH/CPIH, CPIH/CIH, and A/E must be aware of and read the VA A/E Quality Alert 07/09 since it details specification and contract documents for asbestos project. This would be especially helpful if a survey is being conducted prior to an a

27、batement project. A full AHERA survey of the facility would be needed prior to renovation activities, however, if demolition of the facility is planned, a NESHAP survey of the facility would need to be performed. PART 1 - GENERAL 1.1 SUMMARY OF THE WORK 1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREME

28、NTS Drawings, general provisions of the contract, including general and supplementary conditions and other Division 01 specifications, shall apply to the work of this section. The contract documents show the work to be done under the contract and related requirements and conditions impacting the pro

29、ject. Related requirements and conditions include applicable codes and regulations, notices and permits, existing site conditions and restrictions on use of the site, requirements for partial owner occupancy during the work, coordination with other work and the phasing of the work. In the event the

30、Asbestos Abatement Contractor discovers a conflict in the contract documents and/or requirements or codes, the conflict must be brought to the immediate attention of the Contracting Officer for resolution. Whenever there is Copyright International Organization for Standardization Provided by IHS und

31、er license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 13.1302 02 82 13.13 - 2 a conflict or overlap in the requirements, the most stringent shall apply. Any actions taken by the Contractor without obtaining guidance from the Contracting Of

32、ficer shall become the sole risk and responsibility of the Asbestos Abatement Contractor. All costs incurred due to such action are also the responsibility of the Asbestos Abatement Contractor. 1.1.2 EXTENT OF WORK A. Below is a brief description of the estimated quantities of asbestos containing ma

33、terials to be abated by the glovebag method. These quantities are for informational purposes only and are based on the best information available at the time of the specification preparation. The Contractor shall satisfy himself as the actual quantities to be abated. Nothing in this section may be i

34、nterpreted as limiting the extent of work otherwise required by this contract and related documents. B. Removal, clean-up and disposal of ACM piping and fittings and asbestos contaminated elements in an appropriate regulated area in the following approximate quantities: ( ) linear meters (feet) of 1

35、50 mm (6“) diameter pipe insulation ( ) fittings 50 - 150 mm (2“ - 6“) in diameter ( ) other /specify/ SPEC WRITER NOTE: Provide the approximate quantities for removal by the glovebag method. It may be helpful to the offer or to specify the type of pipe and boiler insulation (e.g., aircell, magnesiu

36、m silicate) 1.1.3 RELATED WORK A. Section 07 84 00, FIRESTOPPING. B. Section 02 41 00, DEMOLITION. C. Division 09, FINISHES. D. Division 22, PLUMBING. E. Section 21 05 11, COMMON WORK RESULTS FOR FIRE SUPPRESSION / Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING / Section 23 05 11, COMMON WORK RE

37、SULTS FOR HVAC AND STEAM GENERATION F. Section 21 05 11, COMMON WORK RESULTS FOR FIRE SUPPRESSION / Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING / Section 23 05 11, COMMON WORK RESULTS FOR HVAC AND STEAM GENERATION G. Section 23 07 11, HVAC, PLUMBING, AND BOILER PLANT INSULATION. H. Section 22

38、 05 19, METERS AND GAGES FOR PLUMBING PIPING / Section 22 05 23, GENERAL-DUTY VALVES FOR PLUMBING PIPING / Section 22 05 33, HEAT TRACING FOR PLUMBING PIPING / Section 22 11 00, FACILITY WATER DISTRIBUTION / Section 22 13 00, FACILITY SANITARY SEWERAGE / Section 22 13 23, SANITARY WASTE INTERCEPTORS

39、 / Section 22 14 00, FACILITY STORM DRAINAGE / Section 22 66 00, CHEMICAL-WASTE SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES / Section 23 11 23, FACILITY NATURAL-GAS PIPING. I. Section 23 21 13, HYDRONIC PIPING / Section 23 22 13, STEAM AND CONDENSATE HEATING PIPING. J. Section 23 31 00, HVAC DU

40、CTS AND CASINGS / Section 23 37 00, AIR OUTLETS AND INLETS. Copyright International Organization for Standardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 13.1302 02 82 13.13 - 3 1.1.4 TASKS The work task

41、s are summarized briefly as follows: A. Pre-abatement activities including pre-abatement meeting(s), inspection(s), notifications, permits, submittal approvals, work-site preparations, emergency procedures arrangements, and Asbestos Hazard Abatement Plans for glovebag asbestos abatement work. B. Aba

42、tement activities including removal, clean-up and disposal of ACM waste, recordkeeping, security, monitoring, and inspections. C. Cleaning and decontamination activities including final visual inspection, air monitoring and certification of decontamination. 1.1.5 ABATEMENT CONTRACTOR USE OF PREMISES

43、 A. The Contractor and Contractors personnel shall cooperate fully with the VA representative/consultant to facilitate efficient use of buildings and areas within buildings. The Contractor shall perform the work in accordance with the VA specifications, drawings, phasing plan and in compliance with

44、any/all applicable Federal, State and Local regulations and requirements. B. The Contractor shall use the existing facilities in the building strictly within the limits indicated in contract documents as well as the approved VA Design and Construction Procedures. VA Design and Construction Procedure

45、s drawings of partially occupied buildings will show the limits of regulated areas; the placement of decontamination facilities; the temporary location of bagged waste ACM; the path of transport to outside the building; and the temporary waste storage area for each building/regulated area. Any varia

46、tion from the arrangements shown on drawings shall be secured in writing from the VA representative through the pre-abatement plan of action. The following limitations of use shall apply to existing facilities shown on drawings: SPEC WRITER NOTE: Provide specific limitations on the use of facility e

47、lements such as corridors, stairs, elevators, loading platforms, etc., which are not dedicated for the use of the abatement contractor during his work. Consult with the VA on this and secure verification in writing on the conditions of use. 1.2 VARIATIONS IN QUANTITY The quantities and locations of

48、ACM as indicated on the drawings and the extent of work included in this section are estimated, which are limited by the physical constraints imposed by occupancy of the buildings and accessibility to ACM. Accordingly, minor variations (+/- 5%) in quantities of ACM within the regulated area are cons

49、idered as having no impact on contract price and time requirements of this contract. Where additional work is required beyond the above variation, the contractor shall provide unit prices for newly discovered ACM and those prices shall be used for additional work required under the contractor. SPEC WRITER NOTE: The contract time and price will be adjusted under the provisions of “Differing Site Copyr

展开阅读全文
相关资源
猜你喜欢
  • FORD WSS-M1H900-A-2003 FABRIC MADISON PATTERN WARP KNIT  TO BE USED WITH FORD WSS-M99P1111-A  《MADISON图案的经编针织织物  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD WSS-M1H900-A-2003 FABRIC MADISON PATTERN WARP KNIT TO BE USED WITH FORD WSS-M99P1111-A 《MADISON图案的经编针织织物 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • FORD WSS-M1H901-A-2008 FABRIC LOGAN PATTERN WARP KNIT  TO BE USED WITH FORD WSS-M99P1111-A  《LOGAN图案的经编针织织物  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD WSS-M1H901-A-2008 FABRIC LOGAN PATTERN WARP KNIT TO BE USED WITH FORD WSS-M99P1111-A 《LOGAN图案的经编针织织物 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • FORD WSS-M1H902-A-2003 FABRIC KENDALL PATTERN PILE WARP KNIT  TO BE USED WITH FORD WSS-M99P1111-A  《KENDALL图案的绒头经纱针织织物  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD WSS-M1H902-A-2003 FABRIC KENDALL PATTERN PILE WARP KNIT TO BE USED WITH FORD WSS-M99P1111-A 《KENDALL图案的绒头经纱针织织物 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • FORD WSS-M1H903-A-2003 FABRIC MORGAN PATTERN PILE WARP KNIT  TO BE USED WITH FORD WSS-M99P1111-A  《MORGAN图案的绒头经纱针织织物  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD WSS-M1H903-A-2003 FABRIC MORGAN PATTERN PILE WARP KNIT TO BE USED WITH FORD WSS-M99P1111-A 《MORGAN图案的绒头经纱针织织物 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • FORD WSS-M1H904-A-2008 FABRIC STREETLINE PATTERN WOVEN JACQUARD UNLAMINATED  TO BE USED WITH FORD WSS-M99P1111-A  《STREETLINE图案的不分层提花机织织物  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD WSS-M1H904-A-2008 FABRIC STREETLINE PATTERN WOVEN JACQUARD UNLAMINATED TO BE USED WITH FORD WSS-M99P1111-A 《STREETLINE图案的不分层提花机织织物 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • FORD WSS-M1H905-A-2008 FABRIC MIDWAY PATTERN WARP KNITTED UNLAMINATED  TO BE USED WITH FORD WSS-M99P1111-A  《MIDWAY图案的不分层经编针织织物  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD WSS-M1H905-A-2008 FABRIC MIDWAY PATTERN WARP KNITTED UNLAMINATED TO BE USED WITH FORD WSS-M99P1111-A 《MIDWAY图案的不分层经编针织织物 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • FORD WSS-M1H906-A-2008 FABRIC MIX PATTERN WOVEN JACQUARD UNLAMINATED  TO BE USED WITH FORD WSS-M99P1111-A  《MIX图案的不分层提花机织织物  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD WSS-M1H906-A-2008 FABRIC MIX PATTERN WOVEN JACQUARD UNLAMINATED TO BE USED WITH FORD WSS-M99P1111-A 《MIX图案的不分层提花机织织物 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • FORD WSS-M1H907-A-2008 FABRIC OCEAN PATTERN WEFT KNITTED UNLAMINATED  TO BE USED WITH FORD WSS-M99P1111-A  《海洋(OCEAN)图案的不分层纬编针织织物  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD WSS-M1H907-A-2008 FABRIC OCEAN PATTERN WEFT KNITTED UNLAMINATED TO BE USED WITH FORD WSS-M99P1111-A 《海洋(OCEAN)图案的不分层纬编针织织物 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • FORD WSS-M1H908-A-2008 FABRIC SMOOTH PATTERN WOVEN DOBBY UNLAMINATED  TO BE USED WITH FORD WSS-M99P1111-A  《SMOOTH图案的不分层多臂提花机织织物  与标准FORD WSS-M99P1111-A一起使用 》.pdf FORD WSS-M1H908-A-2008 FABRIC SMOOTH PATTERN WOVEN DOBBY UNLAMINATED TO BE USED WITH FORD WSS-M99P1111-A 《SMOOTH图案的不分层多臂提花机织织物 与标准FORD WSS-M99P1111-A一起使用 》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1