VA 02 82 13 19-2011 ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.pdf

上传人:吴艺期 文档编号:1074669 上传时间:2019-04-06 格式:PDF 页数:48 大小:193.50KB
下载 相关 举报
VA 02 82 13 19-2011 ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.pdf_第1页
第1页 / 共48页
VA 02 82 13 19-2011 ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.pdf_第2页
第2页 / 共48页
VA 02 82 13 19-2011 ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.pdf_第3页
第3页 / 共48页
VA 02 82 13 19-2011 ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.pdf_第4页
第4页 / 共48页
VA 02 82 13 19-2011 ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.pdf_第5页
第5页 / 共48页
点击查看更多>>
资源描述

1、07-11 02 82 13.19 i SECTION 02 82 13.19 ASBESTOS FLOOR TILE AND MASTIC ABATEMENT TABLE OF CONTENTS PART 1 - GENERAL 1 1.1 SUMMARY OF THE WORK . 1 1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS . 1 1.1.2 EXTENT OF WORK 2 1.1.3 RELATED WORK 2 1.1.4 TASKS . 2 1.1.5 ABATEMENT CONTRACTOR USE OF PREMIS

2、ES 2 1.2 VARIATIONS IN QUANTITY 3 1.3 STOP ASBESTOS REMOVAL . 3 1.4 DEFINITIONS . 4 1.4.1 GENERAL . 4 1.4.2 GLOSSARY 4 1.4.3 REFERENCED STANDARDS ORGANIZATIONS . 10 1.5 APPLICABLE CODES AND REGULATIONS . 11 1.5.1 GENERAL APPLICABILITY OF CODES, REGULATIONS, AND STANDARDS . 11 1.5.2 CONTRACTOR RESPON

3、SIBILITY 12 1.5.3 FEDERAL REQUIREMENTS . 12 1.5.4 STATE REQUIREMENTS . 12 1.5.5 LOCAL REQUIREMENTS . 13 1.5.6 STANDARDS 13 1.5.7 EPA GUIDANCE DOCUMENTS . 13 1.5.8 NOTICES 13 1.5.9 PERMITS/LICENSES . 14 1.5.10 POSTING AND FILING OF REGULATIONS . 14 1.5.11 VA RESPONSIBILITIES . 14 1.5.12 SITE SECURITY

4、 . 14 1.5.13 EMERGENCY ACTION PLAN AND ARRANGEMENTS 15 1.5.14 PRE-construction MEETING 16 1.6 PROJECT COORDINATION . 16 1.6.1 PERSONNEL 16 1.7 RESPIRATORY PROTECTION . 17 1.7.1 GENERAL - RESPIRATORY PROTECTION PROGRAM . 17 1.7.2 RESPIRATORY PROTECTION PROGRAM COORDINATOR . 18 1.7.3 SELECTION AND USE

5、 OF RESPIRATORS . 18 Copyright International Organization for Standardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 13.19 ii 1.7.4 MINIMUM RESPIRATORY PROTECTION . 18 1.7.5 MEDICAL WRITTEN OPINION 18 1.7.

6、6 RESPIRATOR FIT TEST 18 1.7.7 RESPIRATOR FIT CHECK . 18 1.7.8 MAINTENANCE AND CARE OF RESPIRATORS 18 1.8 WORKER PROTECTION 19 1.8.1 TRAINING OF ABATEMENT PERSONNEL 19 1.8.2 MEDICAL EXAMINATIONS . 19 1.8.3 PERSONAL PROTECTIVE EQUIPMENT 19 1.8.4 REGULATED AREA ENTRY PROCEDURE . 19 1.8.5 DECONTAMINATI

7、ON PROCEDURE 20 1.8.6 REGULATED AREA REQUIREMENTS 20 PART 2 - PRODUCTS, MATERIALS AND EQUIPMENT . 23 2.1 MATERIALS AND EQUIPMENT 23 2.1.1 GENERAL REQUIREMENTS (all abatement projects) 23 2.1.2 NEGATIVE PRESSURE FILTRATION SYSTEM 24 2.1.3 DESIGN AND LAYOUT 25 2.1.4 NEGATIVE AIR MACHINES (HEPA UNITS)

8、. 25 2.1.5 PRESSURE DIFFERENTIAL 26 .2.2 CONTAINMENT BARRIERS AND COVERINGS IN THE REGULATED AREA 26 2.2.1 GENERAL 26 2.2.3 CONTROLLING ACCESS TO THE REGULATED AREA . 27 2.2.4 CRITICAL BARRIERS 27 2.2.5 secondary barriers: 27 2.2.6 EXTENSION OF THE REGULATED AREA 27 2.3 MONITORING, INSPECTION AND TE

9、STING . 28 2.3.1 GENERAL 28 2.3.2 SCOPE OF SERVICES OF THE VPIH/CIH CONSULTANT . 29 2.3.3 MONITORING, INSPECTION AND TESTING BY CONTRACTOR CPIH/CIH 29 2.4 asbestos hazard abatement plan . 30 2.5 SUBMITTALS . 31 2.5.1 PRE-start MEETING SUBMITTALS . 31 2.5.2 SUBMITTALS DURING ABATEMENT 33 2.5.3 SUBMIT

10、TALS AT COMPLETION OF ABATEMENT 33 PART 3 - EXECUTION . 33 3.1 PRE-ABATEMENT ACTIVITIES . 33 3.1.1 PRE-ABATEMENT MEETING 33 Copyright International Organization for Standardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,

11、-,-07-11 02 82 13.19 iii 3.1.2 PRE-ABATEMENT INSPECTIONS AND PREPARATIONS . 34 3.1.3 PRE-ABATEMENT CONSTRUCTION AND OPERATIONS 34 3.2 REGULATED AREA PREPARATIONS 35 3.2.1 OSHA DANGER SIGNS 35 3.2.2 CONTROLLING ACCESS TO THE REGULATED AREA . 35 3.2.3 SHUT DOWN - LOCK OUT ELECTRICAL 35 3.2.4 SHUT DOWN

12、 - LOCK OUT HVAC 35 3.2.5 SANITARY FACILITIES 35 3.2.7 PREPARATION PRIOR TO SEALING OFF . 36 3.2.8 Critical Barriers 36 3.2.10 PRE-CLEANING MOVABLE OBJECTS 36 3.2.11 PRE-CLEANING FIXED OBJECTS 36 3.2.12 PRE-CLEANING SURFACES IN THE REGULATED AREA . 37 3.2.13 EXTENSION OF THE REGULATED AREA . 37 3.3

13、REMOVAL OF CLASS II FLOORING; ROOFING; AND TRANSITE MATERIALS: . 37 3.3.1 GENERAL 37 3.3.2 REMOVAL OF flooring materials: . 37 3.3.3 REMOVAL OF MASTIC 38 3.4 DISPOSAL OF CLASS ii WASTE MATERIAL: . 38 3.4.1 GENERAL 38 3.5 PROJECT DECONTAMINATION 38 3.5.1 GENERAL 38 3.5.2 REGULATED AREA CLEARANCE . 38

14、 3.5.3 WORK DESCRIPTION . 38 3.5.4 PRE-DECONTAMINATION CONDITIONS . 39 3.5.5 CLEANING: 39 3.6 VISUAL INSPECTION AND AIR CLEARANCE TESTING 39 3.6.1 GENERAL 39 3.6.2 VISUAL INSPECTION 39 3.6.3 AIR CLEARANCE TESTING 39 3.6.4 final AIR CLEARANCE PROCEDURES . 40 3.7 ABATEMENT CLOSEOUT AND CERTIFICATE OF

15、COMPLIANCE . 40 3.7.1 COMPLETION OF ABATEMENT WORK . 40 3.7.2 CERTIFICATE OF COMPLETION BY CONTRACTOR 40 3.7.3 WORK SHIFTS 40 ATTACHMENT #1 41 ATTACHMENT #2 42 Copyright International Organization for Standardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking

16、permitted without license from IHS-,-,-07-11 02 82 13.19 iv ATTACHMENT #3 43 ATTACHMENT #4 44 Copyright International Organization for Standardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 13.19 1 INSTRUC

17、TIONS TO ARCHITECT/ENGINEER AND INDUSTRIAL HYGIENE CONSULTANT SECTION 02 82 13.19 ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS 1. These specifications provide general guidance to personnel given the task of designing and executing a Class II asbestos flooring abatement project. Each abate

18、ment is a unique situation and therefore must be tailored for that project. This specification incorporates current regulatory requirements and current best abatement practices, procedures and technology. The Architect/Engineer and/or the Industrial Hygiene consultants may provide additional specifi

19、cation additions or deletions to this specification that, in their professional judgment, will ensure a safe and effective approach to a specific abatement project while maintaining compliance with applicable regulations and VA policy. Any changes must be clearly marked on/attached to this document

20、prior to finalization of the specification so that the changes will be adequately considered in the review process by the VA. 2. These specifications are to be used in conjunction with asbestos abatement contractor selection criteria; special instructions package; and general construction provisions

21、. 3. Paragraphs that are not preceded by a number code are indented as instructions to the specifications writer and identified by the notation “Spec Writer Notes“. These paragraphs must be deleted from the final document. 4. Within the text of the specifications, there may be optional procedures wh

22、ich the specification writer could include in the final specification. Procedures which are not chosen must be deleted by the specification writer. Optional text is shown by the notation (/text/). 5. The specification writer, VPIH/CIH, CPIH/CIH, and A/E must be aware of and read the VA A/E Quality A

23、lert 07/09 since it details common errors in specification and contract documents for asbestos project. This would be especially helpful if a survey is being conducted prior to an abatement project. A full AHERA survey of the facility would be needed prior to renovation activities, however, if demol

24、ition of the facility is planned, a NESHAP-compliant survey of the facility would need to be performed. PART 1 - GENERAL 1.1 SUMMARY OF THE WORK 1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS Drawings, general provisions of the contract, including general and supplementary conditions and other Di

25、vision 01 specifications, shall apply to the work of this section. The contract documents show the work to be done under the contract and related requirements and conditions impacting the project. Related requirements and conditions include applicable codes and regulations, notices and permits, exis

26、ting site conditions and restrictions on use of the site, requirements for partial owner occupancy during the work, coordination with other work and the phasing of the work. In the event the Asbestos Abatement Contractor discovers a conflict in the contract documents and/or requirements or codes, th

27、e conflict must be brought to the immediate attention of the Contracting Officer for resolution. Whenever there is Copyright International Organization for Standardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11

28、02 82 13.19 2 a conflict or overlap in the requirements, the most stringent shall apply. Any actions taken by the Contractor without obtaining guidance from the Contracting Officer shall become the sole risk and responsibility of the Asbestos Abatement Contractor. All costs incurred due to such acti

29、on are also the responsibility of the Asbestos Abatement Contractor. 1.1.2 EXTENT OF WORK A. Below is a brief description of the estimated quantities of asbestos flooring materials to be abated. These quantities are for informational purposes only and are based on the best information available at t

30、he time of the specification preparation. The Contractor shall satisfy himself as the actual quantities to be abated. Nothing in this section may be interpreted as limiting the extent of work otherwise required by this contract and related documents. B. Removal, clean-up and disposal of ACM flooring

31、 in an appropriate regulated area in the following approximate quantities: ( ) square feet of flooring and mastic ( ) square feet of flooring ( ) square feet of mastic SPEC WRITER NOTE: Provide the approximate quantities for removal. 1.1.3 RELATED WORK A. Section 07 84 00, FIRESTOPPING. B. Section 0

32、2 41 00, DEMOLITION. C. Division 09, FINISHES. 1.1.4 TASKS The work tasks are summarized briefly as follows: A. Pre-abatement activities including pre-abatement meeting(s), inspection(s), notifications, permits, submittal approvals, regulated area preparations, emergency procedures arrangements, and

33、 Asbestos Hazard Abatement Plans for asbestos abatement work. B. Abatement activities including / removal /, / encapsulation /, / enclosure /, clean-up and disposal of ACM waste, recordkeeping, security, monitoring, and inspections. C. Cleaning and decontamination activities including final visual i

34、nspection, air monitoring and certification of decontamination. SPEC WRITER NOTE: Select the appropriate option(s) and list where each option applies. Receive specific approval for these paragraphs from the VA. 1.1.5 ABATEMENT CONTRACTOR USE OF PREMISES A. The Contractor and Contractors personnel sh

35、all cooperate fully with the VA representative/consultant to facilitate efficient use of buildings and areas within buildings. The Contractor shall perform the work in accordance with the VA specifications, drawings, phasing plan and in compliance with any/all applicable Federal, State and Local reg

36、ulations and requirements. B. The Contractor shall use the existing facilities in the building strictly within the limits indicated in contract documents as well as the approved VA Design Construction Procedure. VA Design Construction Copyright International Organization for Standardization Provided

37、 by IHS under license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 13.19 3 Procedure drawings of partially occupied buildings will show the limits of regulated areas; the placement of decontamination facilities; the temporary location of bag

38、ged waste ACM; the path of transport to outside the building; and the temporary waste storage area for each building/regulated area. Any variation from the arrangements shown on drawings shall be secured in writing from the VA representative through the pre-abatement plan of action. The following li

39、mitations of use shall apply to existing facilities shown on drawings: SPEC WRITER NOTE: Provide specific limitations on the use of facility elements such as corridors, stairs, elevators, loading platforms, etc., which are not dedicated for the use of the abatement contractor during his work. Consul

40、t with the VA on this and secure verification in writing on the conditions of use. 1.2 VARIATIONS IN QUANTITY The quantities and locations of ACM as indicated on the drawings and the extent of work included in this section are estimated which are limited by the physical constraints imposed by occupa

41、ncy of the buildings and accessibility to ACM. Accordingly, minor variations (+/- 5%) in quantities of ACM within the regulated area are considered as having no impact on contract price and time requirements of this contract. Where additional work is required beyond the above variation, the contract

42、or shall provide unit prices for newly discovered ACM and those prices shall be used for additional work required under the contractor. SPEC WRITER NOTE: The contract time and price will be adjusted under the provisions of “Differing Site Conditions“; (FAR 52.236-2) of Section 00 72 00, General Cond

43、itions. The Contractor shall have submitted unit prices prior to letting the contract. 1.3 STOP ASBESTOS REMOVAL If the Contracting Officer; their field representative; (the facility Safety Officer/Manager or their designee, or the VA Professional Industrial Hygienist/Certified Industrial Hygienist

44、(VPIH/CIH) presents a verbal Stop Asbestos Removal Order, the Contractor/Personnel shall immediately stop all asbestos removal and maintain HEPA filtered negative pressure air flow in the containment and adequately wet any exposed ACM. If a verbal Stop Asbestos Removal Order is issued, the VA shall

45、follow-up with a written order to the Contractor as soon as it is practicable. The Contractor shall not resume any asbestos removal activity until authorized to do so in writing by the VA Contracting Officer. A stop asbestos removal order may be issued at any time the VA Contracting Officer determin

46、es abatement conditions/activities are not within VA specification, regulatory requirements or that an imminent hazard exists to human health or the environment. Work stoppage will continue until conditions have been corrected to the satisfaction of the VA. Standby time and costs for corrective acti

47、ons will be borne by the Contractor, including the VPIH/CIH time. The occurrence of any of the following events shall be reported immediately by the Contractors Copyright International Organization for Standardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking

48、 permitted without license from IHS-,-,-07-11 02 82 13.19 4 competent person to the VA Contracting Office or field representative using the most expeditious means (e.g., verbal or telephonic), followed up with written notification to the Contracting Officer as soon as practical. The Contractor shall

49、 immediately stop asbestos removal/disturbance activities and initiate fiber reduction activities: A. Airborne PCM analysis results equal to or greater than 0.01 f/cc outside a regulated area or 0.05 f/cc inside a regulated area; B. breach or break in regulated area containment barrier(s); C. less than 0.02” WCG pressure in the regulated area; D. serious injury/dea