1、10-08M 04 05 31 - 1 SECTION 04 05 31 MASONRY TUCK POINTING SPEC WRITER NOTES: Delete between /_/if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION This section specifies requirements for tu

2、ck pointing of existing masonry / and stone work /. 1.2 RELATED WORK Mortars: Section 04 05 13, MASONRY MORTARING. 1.3 APPLICABLE PUBLICATIONS A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in the text by basic designation only. B. Am

3、erican Society for Testing and Materials (ASTM): C67-07. Brick and Structural Clay Tile, Sampling and Testing C216-07 Facing Brick (Solid Masonry Units Made From Clay or Shale) C270-07 Mortar for Unit Masonry C. International Masonry Institute: Recommended Practices and Guide Specifications for Cold

4、 Weather Masonry Construction. PART 2 - PRODUCTS SPEC WRITER NOTE: Make product requirements agree with applicable requirements specified in the referenced Applicable Publications. Update and specify in both, only that which applies to the project. 2.1 TUCK POINTING MORTAR As per appendix X3 of ASTM

5、 C270. 2.2 REPLACEMENT MASONRY UNITS A. Face Brick: 1. ASTM C216, Grade SW, Type FBS. Brick shall be classified slightly efflorescent or better when tested in accordance with ASTM C67. 2. Face brick shall match facing brick of the existing building(s) that is being tuck pointed. B. Other Units to ma

6、tch existing. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-08M 04 05 31 - 2 PART 3 - EXECUTION 3.1 CUT OUT OF EXISTING MORTAR JOINTS A. Cut out existing mortar joints (both bed and head joints) and remove by means of a toothing chisel or a spec

7、ial pointers grinder, to a uniform depth of to 19 mm (3/4-inch), or until sound mortar is reached. Take care to not damage edges of existing masonry units to remain. B. Remove dust and debris from the joints by brushing, blowing with air or rinsing with water. Do not rinse when temperature is below

8、freezing. 3.2 JOB CONDITIONS A. Protection: Protect newly pointed joints from rain, until pointed joints are sufficiently hard enough to prevent damage. B. Cold Weather Protection: 1. Tuck pointing may be performed in freezing weather when methods of protection are utilized. 2. Comply with applicabl

9、e sections of “Recommended Practices for Cold Weather Construction“ as published by International Masonry Industry All Weather Council. 3. Existing surfaces at temperatures to prevent mortar from freezing or causing other damage to mortar. 3.3 INSTALLATION OF TUCK POINTING MORTAR A. Immediately prio

10、r to application of mortar, dampen joints to be tuck pointed. Prior to application of pointing mortar, allow masonry units to absorb surface water. B. Tightly pack mortar into joints in thin layers, approximately 6 mm (1/4-inch) thick maximum. C. Allow layer to become “thumbprint hard“ before applyi

11、ng next layer. D. Pack final layer flush with surfaces of masonry units. When mortar becomes “thumbprint hard“, tool joints. 3.4 TOOLING OF JOINTS A. Tool joints with a jointing tool to produce a smooth, compacted, concaved joint. /B. Tool joints in patch work with a jointing tool to match the exist

12、ing surrounding joints. / /3.5 REPLACEMENT OF MASONRY UNITS A. Cut out mortar joints surrounding masonry units that are to be removed and replaced. 1. Units removed may be broken and removed, providing surrounding units to remain are not damaged. 2. Once the units are removed, carefully chisel out t

13、he old mortar and remove dust and debris. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-08M 04 05 31 - 3 3. If units are located in exterior wythe of a cavity or veneer wall, exercise care to prevent debris falling into cavity. / B. Dampen surfa

14、ces of the surrounding units before new units are placed. 1. Allow existing masonry to absorb surface moisture prior to starting installation of the new replacement units. 2. Butter contact surfaces of existing masonry and new replacement masonry units with mortar. 3. Center replacement masonry unit

15、s in opening and press into position. 4. Remove excess mortar with a trowel. 5. Point around replacement masonry units to ensure full head and bed joints. 6. When mortar becomes “thumbprint hard“, tool joints. 3.6 CLEANING A. Clean exposed masonry surfaces on completion. B. Remove mortar droppings a

16、nd other foreign substances from wall surfaces. C. First wet surfaces with clean water, then wash down with a solution of soapless detergent specially prepared for cleaning brick. D. Brush with stiff fiber brushes while washing, and immediately thereafter hose down with clean water. E. Free clean su

17、rfaces from traces of detergent, foreign streaks or stains. Protect materials during cleaning operations including adjoining construction. F. Use of muratic acid for cleaning is prohibited. - - - E N D - - - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS 3087-13-1991 Pliers and nippers - Specification for dimensions and test values of carpenters pincers《夹扭钳和剪断钳 第13部分 木工用夹钳尺寸和试验值规范》.pdf BS 3087-13-1991 Pliers and nippers - Specification for dimensions and test values of carpenters pincers《夹扭钳和剪断钳 第13部分 木工用夹钳尺寸和试验值规范》.pdf
  • BS 3087-7-1996 Pliers and nippers Specification for dimensions of lever assisted side cutting pliers end and diagonal cutting nippers《夹钳和剪断钳 第7部分 杠杆式侧剪钳、中心剪丝钳和斜嘴钳尺寸规范》.pdf BS 3087-7-1996 Pliers and nippers Specification for dimensions of lever assisted side cutting pliers end and diagonal cutting nippers《夹钳和剪断钳 第7部分 杠杆式侧剪钳、中心剪丝钳和斜嘴钳尺寸规范》.pdf
  • BS 3088-1959 Specification for adjustable hand reamers with inserted blades《嵌入式刀头可调手用铰刀规范》.pdf BS 3088-1959 Specification for adjustable hand reamers with inserted blades《嵌入式刀头可调手用铰刀规范》.pdf
  • BS 3090-1978 Method of test for the determination of the cuprammonium fluidity of linen materials《测定亚麻布料的铜氨流动度的试验方法》.pdf BS 3090-1978 Method of test for the determination of the cuprammonium fluidity of linen materials《测定亚麻布料的铜氨流动度的试验方法》.pdf
  • BS 3092-1973 Specification for main friction clutches main power-take-off assemblies and associated attachments for internal combustion engines《内燃机主摩擦离合器、主动力输出装置及其有关附件的规范》.pdf BS 3092-1973 Specification for main friction clutches main power-take-off assemblies and associated attachments for internal combustion engines《内燃机主摩擦离合器、主动力输出装置及其有关附件的规范》.pdf
  • BS 3095-1 2-1988 Methods for determination of the freezing-point depression of milk - Methods - Hortvet method《牛奶冻结点下降值的测定方法 霍尔特维特法》.pdf BS 3095-1 2-1988 Methods for determination of the freezing-point depression of milk - Methods - Hortvet method《牛奶冻结点下降值的测定方法 霍尔特维特法》.pdf
  • BS 3095-2-1988 Methods for determination of the freezing-point depression of milk - Recommendations for the interpretation of the freezing-point depression of herd milk《牛奶冻结点下降值测定方.pdf BS 3095-2-1988 Methods for determination of the freezing-point depression of milk - Recommendations for the interpretation of the freezing-point depression of herd milk《牛奶冻结点下降值测定方.pdf
  • BS 3095-3-1981 Methods for determination of the freezing-point depression of milk - Storage of samples《牛奶冻结点下降值测定方法 第3部分 样品贮存》.pdf BS 3095-3-1981 Methods for determination of the freezing-point depression of milk - Storage of samples《牛奶冻结点下降值测定方法 第3部分 样品贮存》.pdf
  • BS 31-1940 Specification - Steel conduit and fittings for electrical wiring《电气布线用钢导线管和管接头》.pdf BS 31-1940 Specification - Steel conduit and fittings for electrical wiring《电气布线用钢导线管和管接头》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1